版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
xxxx软件研发楼及南区地下室人工挖孔桩专项施工方案xxxx集团有限公司2013年2月27日目录第一章、编制说明及依据·········································31.1编制说明···················································31.2编制依据····················································3第二章、工程概况···············································42.1工程规模及特征··············································42.2工程地理环境················································52.3桩基础设计概况··············································52.4各地层岩土工程性能评价·····································112.5桩设计参数·················································12第三章、施工劳动力计划········································133.1工期与进度计划·············································133.2劳动力计划·················································133.3主要施工机械进场计划·······································143.4机具施工用电···············································15第四章、施工工艺技术及检查验收··································164.1施工工艺流程···············································164.2施工方法···················································16第五章、质量、安全保证措施·····································235.1质量保证技术措施···········································235.2安全生产保证措施···········································265.3降水与排水措施·············································355.4与不良地质情况的处理施·····································365.5临时道路方案···············································375.6应急方案···················································37第六章、文明施工措施··········································446.1文明施工措施···············································446.2环境保护措施···············································456.3土石方安全运输管理·········································50第七章、雨季和夏季高温季节的施工措施····························527.1雨季施工安全措施···········································527.2夏季高温施工措施···········································52附件附件一:主要机械设备表附件二:桩编号附件三:挖孔桩成孔示意图xxxx软件研发楼及南区地下室工程人工挖孔桩专项方案第一章编制说明及依据1.1、编制说明本方案是根据《xxxx南区地下室工程设计施工图》及《xxxx项目岩土工程详细勘察报告书》编制。本施工方案仅针对xxxx2号软件研发楼及南区地下室工程桩基础工程人工挖孔桩工艺进行编制。其中对工程的施工部署、主要施工方法、主要施工机械进场计划、劳动力安排计划;确保工程质量的技术组织措施、确保安全生产的技术组织措施、确保文明施工的技术组织措施、确保工期的技术组织措施、施工进度计划图表等均做了详细的阐述,力求做到科学性、适用性及针对性。1.2、《人工挖孔桩施工方案》主要依据下列文件及资料进行编制:1、本工程挖孔桩所有施工图纸及其标准图;2、工程地质勘察报告;3、建筑桩基技术规范(JGJ94-2008);4、建筑施工安全检查标准(JGJ59-2011);5、《危险性较大的分部分项工程安全管理办法》通知(住建部建质[2009]87号);6、中华人民共和国制定的有关工程建设的法律、法规;7、公司多年积累的同类工程施工经验,现有的施工技术力量和机具设备能力和我司的管理素质;8、总施工组织设计;9、公司《质量保证手册》、《质量控制程序文件》和《质量保证体系》;10、公司ISO14001标准环境保护管理体系;11、公司《安全质量标准化管理手册》、《安全质量标准化图册》;12、现场和周边的实际踏勘情况。第二章工程概况2.1、工程规模及特征xxxx2号软件研发楼及南区地下室工程地下室共一层,地面±0.00标高相应的绝对标高为67.40m。本工程建设用地面积约57923.71m2(其中地下16442.51m2,地上41481.2m2)建筑高度99.9m。其地下一层,地上二十四层,各楼层层高为地下室4.00m;裙楼一层5.40m;裙楼二、三层+5.10m;主楼四~二十四4.00m。地下部分为停车场和设备用房,一层为大厅、职工餐厅,二至四层为会议室,五至二十四层为研发用房。基础采用人工挖孔灌注桩(墩)基础,桩数量共计312根桩,桩长为6m~14m,桩(墩)身直径分别为0.8m、0.9m、1.0m、1.1m、1.5m、1.7m、1.8m、1.9m、2.0m、2.1m,单桩坚向承载力特征值分别为2300KN、3200KN、3700KN、5000KN、6200KN、7200KN、13800KN、17900KN、20200KN、22500KN、24900KN、226300KN,桩端均支承于强风化板岩。桩护壁混凝土强度等级为C30,钢筋采用HPB3235,桩芯混凝土强度等级为C30,纵向钢筋采用HRB400。2.2、工程地理环境xxxx2号软件研发楼及南区地下室工程位于xx市高新技术产业开发区,南临岳麓大道、西靠旺龙路。目前开发区内市政给水、排污管网均已接至工程场地附近,待施工场地内管网建成、接入,即可满足施工及生活用水、排污要求。目前电源已由业主引入场区内,总电容量达1080KVA,满足施工、照明用电要求。基坑基底按甲方要求土质基底作硬地化处理,铺设80厚级配碎石及80厚C15砼垫层,目前已施工完毕,满足人工挖孔桩施工要求。2.3、桩基础设计概况1、护壁(1)桩护壁的混凝土强度等级为C30,钢筋用HPB235。(2)第一节采用钢筋混凝土护壁,详护壁大样,按“护壁加筋图”配筋。(3)做完第一节护壁后,继续由上至下做护壁按护壁大样(及护壁配筋图)施工。(4)所有土层段的护壁均按护壁加筋图配筋,以确保护壁的安全。(5)为便于井内组织排水,在透水层护壁预留泄水孔,并在浇灌混凝土前予以堵塞。(6)在不利土层可能产生流泥流砂坍孔现象时,应采取安全措施。(7)在极松散的土层应用足够刚度的钢筒代替钢筋混凝土护壁,且随挖随沉。(8)为确保桩的垂直度,每浇灌三节护壁,必须校核桩的中心位置及垂直度一次。护壁大样图图中A1均为100mm,D为桩身直径2、钢筋(1)纵向钢筋用HRB400,钢筋通长设置,接驳采用焊接。(2)钢筋笼外侧需设混凝土垫块,或采用其它有效措施,以确保钢筋保护层的厚度,钢筋保护层厚度为50mm。3、桩芯混凝土浇灌(1)桩成孔至孔底设计标高或持力层时,请通知监理、甲方会同勘察设计及有关质检人员共同鉴定,认为符合设计要求后迅速扩大桩头,清理孔底,及时验收,随即浇灌封底混凝土,封底混凝土最小高度为200mm。(2)浇灌封底混凝土后应尽快继续浇灌桩芯混凝土,如因条件所限需要延迟时,应在以后浇灌前先抽清孔内积水,清理封底混凝土层的表面,然后浇灌桩芯混凝土。(3)桩芯混凝土应浇至桩顶设计标高以上500mm,待混凝土达到设计强度后,再凿去表面浮桨至设计标高。(4)混凝土的浇灌方法1)浇灌封底混凝土时,当孔内渗水量较少,可先抽清孔底积水。在积水深度未超过100mm时,按常规方法浇灌混凝土;若渗水量较大,孔底积水深度大于100mm时,应采用水下混凝土施工方法浇灌,混凝土强度增大一级。2)用常规方法浇灌封底及桩芯混凝土时,必须使用导管或串筒,出料口离混凝土面不得大于2000mm,且应连续浇灌,分层振捣,分层高度约1000~1500mm。4、挖孔桩的施工允许偏差(1)桩芯直径D为±50。(2)桩中心位移偏差为50mm。3)垂直度允许偏差为0.5%。桩身大样图桩身配筋表5、施工安全措施施(1)工作人员上下下井必须使使用电动葫葫芦之类的的合格机械械设备和钢钢丝绳,要要有自动卡卡紧保险装装置,井口口支架必须须牢固稳定定。(2)井口出土如用用绞盘时,必必须采用直直径不小于于16的坚韧麻麻绳或尼龙龙绳,结扣扣牢固,有有安全的掣掣动和吊钩钩装置。(3)桩孔开挖过程程中,应经经常检测井井内有无毒毒害气体和和缺氧现象象。(4)坚持井下作业业排水送风风先行,施施工中应不不断向孔内内输送足够够的新鲜空空气,必要要时抽送同同时进行。(5)井口应设置围围栏,井下下设半边井井的安全钢钢筋网,井井口设特别别可靠的救救生软梯,下下井人员必必须戴安全全帽并系好好安全带,挖挖孔暂停施施工时井口口应用盖板板盖好。(6)井下施工照明明必须采用用安全行灯灯电压不得得高于36伏,供电电给井下用用电设备的的线路必须须装漏电保保护装置。(7)桩孔下部岩层层需进行爆爆破时,应应控制炸药药用量及爆爆破深度,引引爆前要派派专人警戒戒,保证人人员安全。(8)井下通讯联络络要畅通,施施工时保证证井口有人人,井下的的工作人员员必须经常常注意观察察,检查井井下是否存存在塌方涌涌水和流砂砂现象以及及空气和水水的污染情情况,如发发现异常情情况应停止止作业并通通知甲方或或报告上级级及时处理理。(9)根据地质条件件考虑安全全作业区,一一般在相邻邻5米范围内内有桩孔正正在浇灌混混凝土或有有桩孔蓄了了深水时,不不得下井作作业。6、检验(1)人工挖孔桩终终孔前,应进行行桩端持力力层检验,要求采用深层平板载荷试验核实桩端土承载力,同一土层试验点不少于三点,并将结果反馈给设计方。采用探岩或其它方法查明持力层分布情况,保证桩底三倍桩径范围内无软弱夹层等不良地质条件。(2)施工完成后的的工程桩应应进行桩身身质量和竖竖向承载力力的检验,检检验方法和和数量由质质监、建设设、施工、监监理、勘察察、设计六六方按规范范共同协商商确定。7、当桩长小于66米及3倍桩径时时应通知设设计,质检检,监理等等单位进行行具体处理理。2.4、各地层层岩土工程程性能评价价1、人工填土①::为人工堆堆积土,根根据12次标准贯贯入试验结结果,标准准贯入试验验击数标准准值为3.8击,该土土层结构松松散,为完完成自重固固结,强度度低,具有有高压缩性性,工程性性能极差,不不能作为拟拟建建筑物物基础持力力层。2、粉质粘土②::呈软-可塑状态态,根据19件土工试试验结果,孔孔隙比(e)标准值值为0.91,液性指指数(IL)标准值值为0.74,压缩系系数(a1-2)标标准值为0.566Mpa--1;根据28次标准贯贯入度试验验结果,标标准贯入试试验击数标标准值为5.8击。该土土层为高压压缩性土,承承载力较差差且该土层层厚度变化化大,层位位不稳。该该层工程地地质条件较较差,不能能作为拟建建建筑物基基础持力层层。3、全风化板岩③③层:该岩岩层岩芯呈呈硬塑土状状,压缩性性低。为人人工堆积土土,根据25次标准贯贯入试验结结果,其标标准贯入试试验击数标标准值为36击,该岩岩层承载力力较高,工工程性能较较好,推荐荐承载力特特征值280KKpa。该土层层埋藏浅时时可以作为为本拟建建建筑地下室室浅基础持持力层。4、强风化板岩④④层:该岩岩层岩芯呈呈碎块状、块块状,压缩缩性低。根根据19次标准贯贯入试验结结果,其标标准贯入试试验击数标标准值均大大于50击,根据10组单轴自自然抗压强强度(Mpaa)试验结果果,其单轴轴自然抗压压强度(Mpaa)试验结果果为2.411Mpa。该岩层层承载力较较高,,推推荐承载力力特征值500KKpa。该土层层大部分埋埋藏较深,强强度较高、层层位稳定,层层位厚度大大,工程性性能好,可可以作为本本拟建建筑筑物及地下下室桩基础础桩端持力力层。2.5、桩设计计参数1、本工程基础采采用人工挖挖孔灌注桩桩。设计总总桩数共计312根桩,桩桩长为6m~14m。桩(墩)身直直径分别为为0.8m、0.9m、1.0m、1.1m、1.5m、1.7m、1.8m、1.9m、2.0m、2.1m,单桩坚坚向承载力力特征值分分别为23000KN、32000KN、37000KN、50000KN、62000KN、72000KN、138000KN、179000KN、202000KN、225000KN、249000KN、2263300KNN,桩端均均支承于强强风化板岩岩。桩护壁壁混凝土强强度等级为为C30,钢筋采采用HPB3000,桩芯混凝凝土强度等等级为C30,纵向钢钢筋采用HRB4400。2、桩端持力层选选择在强风风化板岩。3、桩直径分别为为800mmm、900mmm、10000mm、11000mm、15000mm、17000mm、18000mm、19000m、20000mm、21000mm等10种规格,桩桩护壁混凝凝土强度等等级为C30,桩芯混凝凝土强度等等级为C30,钢筋HRB400。4、挖孔桩施工容容许偏差::4.1桩中心位位移偏差为为50mmm。4.2垂直度允允许偏差为为0.5%%。4.3桩芯直径径D为±50。第三章施工工、劳动力力计划3.1、工期与与进度计划划本工程共计3112根桩,工工期计划662天。3.2、劳动力力计划3.2.1、主主要施工阶阶段各工种种的人数配配置1、劳动力配制在本工程中,计计划组成4个专业班班组:桩基开挖班:主主要工作内内容为本工工程挖孔桩桩的开挖、护护壁、凿桩桩头等,主主要工种为为普工等。钢筋制安班:主主要工作内内容为本工工程挖孔桩桩钢筋制安安,主要工工种为钢筋筋工、电焊焊工、起重重工等。混凝土浇筑班::主要工作作内容为本本工程场地地硬化、桩桩芯混凝土土浇筑等。机械班:主要工工作内容为为施工期间间机械设备备的调度和和维修及使使用。主要要工种为机机械工。2、劳动力投入计计划表本工程主要施工工工种有机机械工、钢钢筋工、混混凝土工、电电工、电焊焊工、测量量工、起重重工、普工工等人员组组成,各个个施工阶段段劳动力需需求计划表表如下:劳动力投入计划划表工种级别按工程施工阶段段投入劳动动力情况1-5天6-15天16-25天26-35天36-45天46-55天56-62天机械工520252525105钢筋工22030303052砼工2020202020102木工2666632电焊工2444421电工3444441起重工2555531测量工3333333普工2020020020020010030合计61292307307307140473.3、主要施施工机械进进场计划主要施工机械进进场计划表表序号机械设备名称规格型号功率单位数量1机动翻斗车1T部22人工挖孔桩提升升机0.5T3KW套803鼓风机1-15KW台504潜水泵(各种泵泵类)10-34米扬扬程Φ380.75KW--KW台505真空泵10-30米扬扬程Φ1003KW-5KWW台46空气压缩机(电电动、柴油油机)3-6-12//M3分20KW-455KW台37混凝土搅拌机(连连配料机)350公升7.5KW台28钢筋弯曲机Φ40M3KW-5KWW台29钢筋切断机3KW台110电焊机交流20KW台611变频插入式砼振振器ZJB-1500型台612凿岩机M18-26套413风镐0.3/M3分台5014空气检测仪MOODELXP(1-317)部115备用氧气装备(瓶瓶)套316经纬仪北京J2台217水平仪92台218钢模板H=0..5~1..01200—23300套5019混凝土漏斗、吊吊斗导管Φ250MM套320毒气检测仪台221防毒面具套1022手推车、振动器器及其他小小型机具批123挖掘机PC200斗容1m3台23.4、机具施施工用电主要设备施工用用电序号设备名称功率(KW)需要系数1挖孔桩提升架80×3=24400.52钢筋弯曲机2×3=60.53钢筋切断机1×3=30.354电焊机6×20=12200.55交频震捣器6×3=220.56潜水泵44×3=13320.77照明150.38电动空气压缩机机3×37=11111第四章施工工工艺技术术及检查验验收4.1施工工艺艺流程场地整平→放线线定桩位→砌筑井圈圈,埋钉标标记→挖第一节节桩孔土方方(约10000mm深)→支护壁钢钢模→浇筑第一一节混凝土土护壁→在护壁上上二次投测测标高及桩桩位十字轴轴线→安装活动动井盖垂直直运输架吊吊土桶排水水通风照明明设施等→第二节桩桩身挖土→清理桩孔孔四壁校核核桩孔垂直直度和直径径→拆上节模模板支第二二节模板浇浇筑第二节节混凝土护护壁→重复第二二节挖土支支模,浇筑筑混凝土护护壁工序,循循环作业至至设计深度度→检查持力力层后进行行扩底→清理虚土土排除积水水检查尺寸寸和持力层层→吊放钢筋筋笼就位→浇筑桩身身混凝土→桩养护。4.2施工方法法4.2.1土方方开挖1、三类土土层由人人工采用镐镐、铁锹从从上至下逐逐层进行挖挖土,进入入强(中)风风化层后用用风镐破碎碎掘进。挖挖孔时需每每节校正桩桩孔中心及及几何尺寸寸,经检查查合格后才才能进行下下一道工序序。每节护护壁的开挖挖深度一般般为1.00m,当遇遇到流砂等等不良土层层时,每节节开挖深度度应小于50cm,特殊殊地质情况况下视护壁壁的安全情情况确定开开挖深度。挖挖土次序为为先挖中间间部分后周周边,按设设计桩直径径加2倍护壁厚厚度控制截截面,允许许尺寸误差差±3cm。扩扩底部分采采取先挖桩桩身圆柱体体,再按扩扩底尺寸从从上到下削削土修成扩扩底成型。弃土装入箩筐内,垂直运输采用井口手动绞架;弃土吊运地面后整平,随桩井掘进,孔内余土增多时,将桩孔口砌筑红砖加高围挡,基本保证成孔完毕,地面余土平整。2、相邻桩中心距距小于2.5倍桩径,施施工中应采采用跳挖,并并待桩身混混凝土强度度达到设计计60%以上,方方可进行相相邻桩身开开挖工作。(1)本工程孔桩共共计3122根(桩位位详见附件件:《桩基基编号图》)。(2)根据地质勘查查报告提供供的持力层层标高走向向,在每次次开挖的时时候挑选桩桩位在持力力层较深的的一些桩提提前开挖,选选点均匀分分布,为其其他桩开挖挖时降低水水位创造比比较有利的的施工条件件。3、为保证桩的垂直直度,每浇浇筑3节护壁混混凝土后进进行一次桩桩中心位置置及垂直度度的校核。4、桩孔成型,首先先经施工单单位自检合合格后,再再会同建设设、监理、质质监部门、勘勘察、设计计单位共同同验孔,验验收合格后后应及时绑绑扎钢筋并并浇筑桩芯芯混凝土。4.2.2、护护壁施工1、钢筋工程采用钢筋预先成成型、孔内内安装的施施工方法。2、模板工程采用定型组合式式钢模板分分块拼装而而成。本工工程根据桩桩径不同,模模板进行拼拼装。施工工时拆上节节、支下节节,循环周周转使用。模模板间用U形卡连接接,上下各各设一道型型钢圈顶紧紧。为满足足工期要求求,每桩配配制一套模模板。模板安装前要将将杂物清理理干净并涂涂刷隔离剂剂,安装时时模板底部部用短钢筋筋固定位置置。3、混凝土浇筑护壁混凝土在现现场搅拌,人工运至至浇筑点浇浇筑。护壁壁混凝土采采用1~3cmm碎石,坍坍落度为10~112cm,强度度等级为CC30。在正正常的情况况下,每挖挖深一个节节高,就立立即绑扎护护壁钢筋、通通过监理验验收合格后后,支模、浇筑混混凝土。混混凝土下料料时要分层层对称,分分层厚度控控制在150mmm左右,用用手工进行行捣实。第第一节护壁壁混凝土高高出地面25cm,其高高出部分加加宽10cm。混凝凝土要一次次浇筑完成成,不得在在有积水淹淹入模板的的情况下浇浇筑护壁混混凝土。护护壁混凝土土每批按要要求制作试试块,并标标明日期、桩桩号和节数数。当混凝土终凝224小时后后并且强度度达到1Mpa以上时时方可拆除除支撑和模模板。图4.1护护壁大样图图4.2.3、桩桩身施工1、钢筋笼制作及及安装钢筋采用预先成成型、孔内内安装的施施工方法。横向加劲劲箍为16@20000;横向螺旋旋箍为8@2000;竖向钢钢筋分为111种,具体体规格见下下表。桩身配筋表钢筋进场前必须须有出厂合合格证,同同时必须取取样送检合合格后方可可使用,焊焊条采用E50XXX,焊条必必须符合现现行标准《碳碳钢焊条》及及《低合金金钢焊条》的的规定。钢筋笼预先在钢钢筋加工场场地制作成成型,成型型后堆放于于空旷场地地,安放钢钢筋笼时吊吊运至桩孔孔附近吊放放安装。纵纵向钢筋用用Ⅲ级,钢筋筋接头均采采用焊接;;水平钢筋筋:螺旋箍箍用Ⅰ级,横向向加劲箍用用Ⅰ级,纵横横钢筋交接接处应焊牢牢。钢筋笼纵筋为通通长钢筋,其其接头采用用电焊,接接头必须按按规范要求求错开;主主筋与螺旋旋箍筋间隔隔点焊固定定。钢筋笼笼搬运和吊吊运时,应应防止钢筋筋笼变形,安安放时对准准孔位,避避免碰撞孔孔壁,就位位后立即固固定钢筋笼笼。钢筋焊焊接必须按按规范要求求会同监理理取样送检检。钢筋笼上绑设混混凝土垫块块,控制保保护层为50mm,钢筋笼笼外形尺寸寸比孔径小小10mm。钢筋笼制作允许许偏差:主主筋间距为为±10mmm,螺旋箍箍筋间距为为±20mmm钢筋笼直直径为±10mmm,长度为±50mmm,钢筋笼笼保护层为为±10mmm。由于本工程场地地尚无硬化化通道,吊车无法法进入施工工场地,加之ф800桩型较多,钢筋笼重重在300—400KKg左右,采采用“扒杆”安放,部部分钢筋笼笼采用“扒杆”与绑扎相相结合的方方法完成桩桩钢筋的安安装。2、桩芯混凝土浇浇筑桩芯混凝土采用用商品混凝凝土,用输输送泵泵送送至浇筑点点浇筑。桩桩芯浇筑混混凝土前,必必须对桩孔孔钢筋笼进进行隐蔽验验收,做好好记录,验验收合格后后方可施工工。混凝土浇灌前做做好涌水量量的测定。当当孔内涌水水量小于00.3升/秒时,采采用常规浇浇灌方法施施工。当孔孔内涌水量量大于0..3升/秒时,采采用水下混混凝土浇灌灌方法施工工。(1)常规浇灌方法法:桩芯混凝土采用用泵送商品品混凝土。现现场用拖式式混凝土泵泵输送混凝凝土。浇筑筑混凝土前前应将井底底清理干净净,并进行行封底处理理。在坑底底做一集水水坑,如遇遇少量渗水水,用水泵泵将坑底积积水抽干。浇浇灌前要通通过监理、设设计、勘察察、质监、业业主等单位位验收后才才能开始浇浇灌。为了防止桩孔底底集水影响响砼强度,可可用同配合合比干砼0.5m³³放入桩孔孔底,均匀匀在坑底散散开。浇筑时,为防止止混凝土产产生离析现现象,通过过设在桩孔孔上部的受受料斗和串串筒向桩底底下料,使使混凝土自自由下落高高度不超过过2m。并保持持混凝土下下料速度均均匀。串筒筒采用挖孔孔桩机架进进行升降,每每节串筒的的长度不超超过1.55m,以方方便拆卸。连连接好的串串筒利用在在桩孔内的的钢筋支架架固定,串串筒底端距距桩孔底的的高度小于于2m。每根桩芯的混凝凝土应一次次浇筑完成成。桩孔内内支设操作作平台,混混凝土工下下到操作平平台上进行行振捣。随随着浇筑施施工的进行行,操作平平台上移,直直至混凝土土振捣到桩桩顶。混凝凝土振捣采采用插入式式振动棒,分分层随浇随随振捣。振振捣时先周周边后中间间,快插慢慢拔,直至至混凝土表表面呈水平平、不显著著下沉、表表面泛浆时时为止。混凝土浇筑要严严格控制桩桩顶标高,桩桩顶超浇高高度不小于于200mmm~300mmm。预先准准备10mm~40mmm连续级配配碎石,并并清洗干净净,当砼到到桩顶后,加加入适量碎碎石,以减减少桩顶浮浮浆厚度,增增加桩顶砼砼强度。桩桩顶面混凝凝土浇筑完完成后用草草袋覆盖或或灌水养护护。桩身混凝土施工工时,必须须按要求留留置试块。桩底浇筑封底混混凝土,应应在基底地地质条件符符合设计要要求并经有有关部门验验收后,立立即浇筑封封底混凝土土。浇筑封封底混凝土土时,如渗渗水量较少少,可先抽抽清孔底积积水,在积积水深度未未超过100mmm前按常规规方法浇筑筑混凝土。当当渗水量较较大时,采采用水下混混凝土施工工方法浇筑筑。(2)水下混凝土浇浇灌方法::水下混凝土采用用导管浇灌灌,浇灌前前须进行导导管试拼及及密封试验验,先对每每根导管重重新量测一一遍,确保保导管的拼拼装长度,保保证安装好好的导管不不漏水。导管采用直径2275mmm的钢管,壁壁厚4mm,导管安安装长度25m,从孔底底至孔口分分别采用5m导管1节,2.5m导管1-5节(根据据桩长具体体来定)。导导管由吊车车配合安装装。导管由由法兰螺栓栓连接,接接头处用橡橡胶圈垫密密封隔水。导管底端与孔底间距为50cm。水下灌注的混凝凝土必须具具有良好的的和易性,其其配合比应应通过试验验确定,坍坍落度宜采采用180~~220mmm,每立立方米混凝凝土中的水水泥用量不不得少于360kgg。选用的砂子,砂砂率一般控控制在40%~~50%。选用的粗骨料,其其粒径不得得大于40mm。开始浇灌时,预预制混凝土土隔水球塞塞吊放的位位置应临近近水面,导导管底端到到孔底的距距离应为00.5m,排排塞后不得得将导管插插回孔底。开灌前储料斗内内必须有足足以将导管管的底端一一次性埋入入水下混凝凝土中0..8m以上上深度的混混凝土储存存量。随着混凝土的上上升,要适适当提升和和拆卸导管管,导管底底端埋入混混凝土面以以下一般应应保持2~4m。不宜大大于6m和不得小小于1m,严禁把把导管底端端提出混凝凝土面。在水下混凝土灌灌注过程中中,应有专专人测量导导管埋深,填填写好水下下混凝土灌灌注记录表表。水下混凝土灌注注应连续进进行,不得得中断。因因此灌注前前应有严密密的施工组组织设计及及辅助设施施,一旦发发生机具故故障或停电电、停水及及发生导管管堵塞、进进水等事故故,应立即即采取有效效措施进行行处理,并并同时做好好记录。提升导管时应避避免碰挂钢钢筋笼。当当混凝土面面接近钢筋筋笼底时,应应严格控制制导管的埋埋管不要过过深,当混混凝土面上上升到钢筋筋笼内3~4m再提升导导管,使导导管底高于于钢筋笼底底端,以防防钢筋笼上上浮。应控制最后一次次混凝土的的灌注量,不不使桩顶超超高或偏低低过多,一一般应控制制在设计桩桩顶标高以以上约0.3m。灌注桩身混凝土土时,每根根桩的留置置试块应视视桩身混凝凝土的数量量而定,但但不得小于于一组。第五章质量量、安全保证证措施5.1、质量保保证技术措措施除严格按照国家家现行的有有关规范、标标准和省、市市的有关规规定施工外外(主要有有《建筑桩桩基技术规规范JGJ994-20008》、《建建筑基桩检检测技术规规范JGJ1106-22003》等),根根据本工程程实际情况况,采取以以下措施::1、定点放线。移交的控制点和和控制标高高,必须在在现场复测测,并且相相互办理交交接书面材材料才准使使用。施工工中的测量量放线要经经复核后才才能使用。2、专人检验施工工过程各项项指标,按按下列项目目进行检测测做好记录录:平面位置及垂直直度的允许许偏差;桩身截面有效直直径的允许许偏差;挖孔桩基底平面面的允许高高差;挖孔桩孔底沉渣渣的允许厚厚度。3、钢筋原材料、焊焊接必须严严格按有关关规范要求求操作及检检验合格后后才准使用用。4、每个作业组必必须配齐线线锤(2..5kg)、小小线、不锈锈钢尺等检检测工具,并并要强调每每道工序都都要严格执执行自检制制度,特别别对桩孔施施工的垂直直度。5、挖孔桩施工中中常见的质质量问题及及其处理方方法。参见见下表。桩基施工中常见见质量问题题及防治措措施表序号常见质量问题产生原因处理方法1桩芯混凝土质量量不佳浇灌混凝土未用用串筒或串串筒下口距距浇灌面大大于3m,造成混混凝土离析析。孔内有地下水渗渗出,而浇浇灌混凝土土时又不连连续,不仅仅每次量少少而且间隔隔时间长。混凝土配合比不不当。振捣不良。浇筑砼时必须采采用串筒,筒筒下口距离离浇筑面不不大于2m。砼供应及时并连连续浇筑。孔底积水尽量抽抽排干净或或孔外降水水使孔底疏疏干,当孔孔内积水过过多,须用用提高等级级的水下砼砼,采用导导管法施工工或下干砼砼。保证砼的配合比比符合设计计要求。保证砼的振捣、振振点不可疏疏漏。2桩孔不垂直成孔时,未严格格控制垂直直度。孔成后,迟迟未未浇灌混凝凝土,孔壁壁变形。成孔时,严格控控制桩位及及垂直度,发发现不垂直直及时修正正。孔成后后,应及时时检验并及及时灌筑混混凝土。6、孔底成型时,首首先由质检检技术人员员仔细复核核持力层地地层性质,几几何尺寸、中中心位置,达达到设计要要求后,认认真仔细将将孔底清洗洗干净并挖挖好小积水水坑。准备备好检验条条件后再通通知业主、设设计、监理理单位到孔孔底验收。7、孔底成型验收收,保留好好坑底岩样样,要及时时拍照及办办理好有关关验收签证证单,还要要将孔顶部部周转土清清干净,防防止溅落入入井。8、钢筋成型入孔孔前先自检检合格后准准备好自检检单、材料料合格证、化化验报告单单与甲方等等有关人员员验收后,才才准入模。9、钢筋笼必须做做好加固,防防止变形。质质量检查员员应认真测测量并校正正保证钢筋筋顶端标高高达到设计计位置。10、桩混凝土质量量由混凝土土供应商负负责。护壁壁混凝土大大量浇筑时时采用商品品混泥土,少少量浇筑时时由现场搅搅拌机严格格按照质量量检测单位位出具的《混混泥土配合合比设计报报告》进行行搅拌。必须严格采用配配合比单中中指定的材材料及配比比进行配置置;检查水灰比;不准套用和随意意改变配合合比。11、桩芯混凝土浇浇捣时,对对桩孔护壁壁渗漏水要要处理好后后再进行,并并且满足以以下要求::首先将桩孔底的的泥土、水水、松石等等排除干净净后,经过过质量检查查技术人员员下孔底验验收同意后后再下料;;混凝土必须经串串筒下料入入桩孔内,且且要来回摆摆动使下料料均匀;混凝土要认真按按有关要求求振捣,保保证密实。12、当桩孔积水上上升速度超超过0.33L/h时,必须须另外采取取措施,主主要是:加快混凝土下料料速度(用用商品混凝凝土集中而而快速下料料);按水下作业施工工。这些措措施要根据据实际情况况在现场详详细地制定定和交底后后进行。13、同桩芯混凝土土必须采用用同标号砼砼,一次浇浇灌完毕。14、桩顶混凝土标标高主要靠靠长尺杆根根据孔顶红红漆水平标标志测定,孔孔顶的浮浆浆可及时清清除,使孔孔顶浆石比比例适当,同同时,桩顶顶标高应超超灌20cm~30cm。15、每根桩芯按规规定最少做做一组试件件,由专人人负责,并并做好登记记、养护、分分龄,按时时送检。5.2、安全生生产保证措措施1、安全施工管理理体系成立项目安全生生产领导小小组。项目目经理为该该工程安全全生产第一一责任人,各各施工队、生生产班组建建立相应原原安全生产产管理小组组,由专职职安全员统统抓各项安安全工作,每每个生产班班组确立一一名兼职安安全员并要要求各职能能部门在各各自相应的的业务范围围内,对安安全生产负负责使安全全生产,在在纵向上从从项目经理理到作业班班组工人;;在横向上上以各施工工队到各业业务部门都都来参与安安全生产管管理工作,使使工作项目目得以优质质、高速、低低耗、安全全顺利地完完成。严格执行各项《安安全管理制制度》、《安安全操作规规程》及有有关《安全全施工技术术规范》等等国家标准准;本工程的安全目目标是:杜杜绝死亡、火火灾及设备备等重大事事故,负伤伤事故频率率低于3‰。2、现场安全制度度(1)充分发挥安全全“三宝”的作用。凡凡进入施工工现场的工工作人员必必须戴好安安全帽,穿穿工作服,不不准穿拖鞋鞋或赤脚。(2)施工现场人流流入口处要要有明显的的指示标志志。要设立立醒目的标标语、警句句提醒进场场人员注意意安全。(3)各种建筑材料料的堆放必必须按照施施工总平面面布置图定定点码放整整齐。各种种施工机械械在使用前前要进行经经常性的检检查,并建建立定期保保养制度,上上下班必须须做好记录录,以保证证机械的传传动部位及及吊装的索索具有良好好的工作性性能,机械械设备的操操作人员均均持证上岗岗。(4)使用电动机具具必须装有有漏电保护护装置。(5)电工在安装、维维修、拆除除施工用电电缆时,必必须有两人人以上同时时操作,不不得单独从从事高空作作业。(6)施工现场的机机具如砼搅搅拌机、对对焊机、弯弯曲机、切切割机等,都都按规定设设防护棚和和采取防雨雨措施。(7)每根挖孔桩当当天完工后后孔口必须须用木板将将其盖住。3、安全用电及防防台风防雷雷击措施(1)施工现场必须须有足够的的低压照明明设施,主主要通道入入口,上下下入口均应应设照明装装置。夜间间施工必须须有足够的的照明灯具具。(2)施工现场不得得架设裸电电线,电线线跨过主要要施工道路路时,最低低架空高度度不得低于于6m,其它地地方应不低低于5m。(3)所有用电设备备一律接地地接零,电电动机械的的小型工具具,均应有有安全漏电电保护装置置,所有用用电设备不不使用时一一律拉闸断断电,所有有配电箱均均应上锁,架架设和拆除除供电线路路一律由电电工负责操操作,严禁禁其它人员员乱拉电线线。(4)在施工期间应应收集天气气预报情况况,以便安安排工作并并采取相应应的措施。(5)台风季节应特特别提高警警惕,随时时做好防台台风袭击的的准备。台台风到来之之前,应对对独立的机机械及堆放放物进行加加固。4、安全防火措施施为了加强消防工工作,确保保本工程顺顺利施工,依依照国家消消防条例,吸吸取各方面面经验教训训,根据本本工程的场场地、工程程实际特点点等,特制制定如下措措施:(1)消防工作作:实行“预防为主主,防消结结合”的方针,加加强消防教教育,提高高对安全防防火工作认认识,把安安全防火工工作提到工工作议事日日程上来,作作为一件大大事来抓。(2)严格贯彻执行行防火工作作逐级责任任制,凡参参加施工的的单位,不不论建制如如何,只要要是工程施施工的单位位负责人,必必须切实担担当起消防防安全责任任人的职责责。切实对对消防保卫卫及成品保保护工作加加强领导,在在实际工作作中落实市市政府法规规的精神。(3)保卫组负责施施工期间一一切用火、用用电及易燃燃、易爆物物品的管理理,严格控控制火源、水水源、严格格用火审批批手续,加加强对电焊焊等工种的的管理教育育。检查发发现不安全全因素,主主动采取预预防措施,堵堵塞漏洞,加加强管理,督督促整改,处处理违章,确确保施工现现场安全。(4)建立健全组织织:为加强强安全防火火工作管理理,项目部部成立防火火安全领导导小组。(5)加强对消防器器具的配备备:在住宿宿区临时设设施周围配配备一定数数量的泡沫沫灭火器、消消防水桶等等消防设施施及工具,指指派专人负负责,消防防设施及工工具供消防防专用,任任何人不得得以任何借借口挪作他他用。(6)施工现场的防防火管理::施工现场场和员工住住宿,严禁禁烧电炉、煤煤油炉,施施工现场需需要动用气气割、气焊焊和电焊及及动用火种种,存在事事故隐患的的严密注意意,做到人人走电源、气气源、火源源关掉,有有足够的防防火措施。(7)监督检查:为为确保防火火工作落实实到实处,经经常监督检检查。5、挖孔桩专项安安全措施(一)设备(1)井口提升机采采用钢丝绳绳+电动卷扬扬机,并有有自动卡紧紧保险装置置。不得采采用手摇铰铰盘、马绳绳或尼龙绳绳。(2)每台操作架必必须经检验验合格后,方方可使用,主主要对电机机、漏电开开关测试,限限位开关是是否灵敏有有效。(3)经常检查钢丝丝绳的抗拉拉性能,对对钢丝绳表表面受损出出现伤痕老老化迹象,应应及时更换换。(4)井下照明必须须使用36V安全电压压(若井下下环境潮湿湿,应采用用12V安全电压压),所有有电源线路路必须架空空设置,严严禁使用花花线,一律律采用标准准电缆(双双层绝缘),所所有机械设设备均由专专业管理,专专人管理,定定期检修、更更换,及时时排除故障障。(二)人员(1)桩孔井面第一一节砼护壁壁应高于地地面25㎝,井面面设置木板板井盖,以以防止施工工人员行走走时跌落。(2)机械设备操作作人员必须须熟悉和掌掌握安全技技术操作规规程,有关关特殊工种种作业人员员必须持证证上岗。(3)工作人员上下下井必须使使用电动葫葫芦之类的的合格机械械设备和钢钢丝绳,要要有自动卡卡紧保险装装置,井口口支架必须须牢固稳定定。严禁乘乘坐吊桶上上下,井口口出土如用用绞盘时,必必须采用直直径不小于于16的坚韧麻麻绳或尼龙龙绳,结扣扣牢固,有有安全的制制动和吊钩钩装置。(4)井下作业一定定要穿绝缘缘鞋和戴安安全帽,腰腰系安全绳绳,严禁施施工人员在在井内带病病作业。(5)所有生产人员员均应按部部就班,坚坚守岗位,互互相帮助,互互相配合,不不得擅离职职守。(6)严禁酒后作业业,禁止在在工作时间间嬉戏打闹闹。(7)一切闲杂人员员不准进入入施工现场场。(三)防有害气气体或缺氧氧(1)为防有害气体体或缺氧中中毒,当桩桩孔开挖深深度超过4米后在每每天作业前前应采用毒毒气检验测测试仪器置置于孔底,检检测孔内的的O2、CO2、CO、HS等气体是是否超标,无无异常方可可进行作业业。若有超超标但并不不严重,需需对井内进进行送风,彻彻底抽换空空气后,方方能下井作作业,作业业时应继续续保持通风风。如确实实有危险,井井内CO、CO2等有害气气体含量较较高,应立立即报告,另另行处理。每每次检测均均做好记录录。(2)现场必须有备备用防毒面面具与氧气气。(3)桩挖深超过44米后,孔孔内照明采采用36V安全电压压(若孔内内环境潮湿湿,孔内应应采用12V安全电压压),防爆爆灯泡,灯灯泡距孔底底2米。(4)孔上与孔内人人员必须保保持通讯联联系,孔上上人员随时时观测孔内内人员的动动态,如发发生意外,下下孔救人人人员必须系系好安全带带(安全绳绳),带防防毒面具,背背安全绳。(四)防物打击击与坠落(1)孔上与孔内人人员必须戴戴好安全帽帽,穿防护护鞋、戴胶胶手套。(2)防治暴雨流水水入或物体体跌入孔内内,孔口壁壁应比原始始地面高出出200㎜,孔口口用Φ16钢筋插入入护壁内做做成防护架架,并绑好好安全防护护网。(3)孔内设置半圆圆形安全挡挡板或半园园形钢筋防防护网,当当吊渣桶上上下时,孔孔内作业员员避于安全全挡板下。(4)下孔作业必须须使用软梯梯或在护壁壁接头予埋埋爬梯,严严禁用手脚脚爬踩孔壁壁上下和乘乘坐吊桶上上下。(5)使用风管及潜潜水泵时,在在孔口用麻麻绳系牢,一一端正系在在水管或风风管上,风风镐及潜水水泵必须先先放至作业业面,后下下孔作业。(6)吊渣桶装运土土(石)渣渣时,应比比桶口平面面低50㎜以下,以以防土(石石)渣中途途坠落。(7)孔口和孔壁附附着物(包包括不到孔孔底的钢筋筋笼、串筒筒、钢爬梯梯、水管风风管等)必必须固定牢牢靠。(8)根据地质条件件考虑安全全作业区,一一般在相邻邻5米范围内内有桩孔正正在浇灌混混凝土或有有桩孔蓄了了深水时,不不得下井作作业。(9)严禁在孔内边边抽水边开开挖,严禁禁开挖时灌灌注相邻较较近桩的砼砼,孔内集集水未排净净前,不得得灌注砼。(五)安全用电电(1)电工、电焊工工持证上岗岗,无证工工人不准启启动电机操操作。(2)施工用临时电电线整齐有有序,电线线、电缆不不准埋入土土中,不准准使用破皮皮的橡皮软软线。(3)各装架配电箱箱均装分漏漏电保护器器,坚持一一机一闸一一漏电开关关,保证符符合规范要要求,杜绝绝漏电伤人人。(4)保险丝不得用用钢丝,铝铝丝代替,电电箱应装锁锁由电工统统一掌握。(5)孔内作业人员员如需照明明,应采用用36伏安全用用电压防爆爆灯罩(若若孔内环境境潮湿,应应采用12V安全电压压)。挖孔桩内及周边边临电线路路布设交叉叉现象较多多,易发生生触电安全全事故。其其预防措施施有:①施工用电实行三三级漏电配配电,施工工电缆线按按规定架空空铺设;②开关箱内的漏电电保护器具具额定漏电电电流应不不小于30mA,额定漏漏电应不大大于15mA,额定漏漏电动作不不能大于0.1S;③保护零线按规定定作好重复复接地;④孔下照明使用的的安全矿灯灯或12V安灯;⑤电焊作业双线到到位;⑥非电工人员不得得拆改电器器、电源,电电工人员必必须执证上上岗,一般般工人也应应了解用电电常识及有有关安全规规程;⑦电工定期对施工工现场用电电设备进行行检查,及及时发现和和排除电气气事故隐患患;⑧电器设备投入使使用前检查查绝缘电阻阻必须合格格,设备裸裸漏带电部部分必须有有防护、保保护接零或或接地必须须可靠、保保护装置必必须符合要要求。对于于使用中的的电器设备备,应定期期测定其绝绝缘电阻,对对于各种接接地装置,应应定期测定定其接地电电阻;⑨为了便于检查,工工区应对重重要的设备备单独建立立资料档案案,每次检检修和实验验记录应作作为资料保保存,以便便核对。6、超过25m的的人工挖孔孔桩安全加加强措施(1)防护壁坍塌措措施每节桩孔挖完后后立即支护护护壁模板板,浇注护护壁砼,一一般情况下下24h后方可拆拆除护壁模模板,护壁壁加配适量量钢筋,上上下护壁要要有钢筋拉拉结,避免免某段护壁壁出现流砂砂、淤泥而而造成护壁壁因自重而而沉裂的现现象,上下下护壁间搭搭接长度不不小于100mmm。为防止止孔壁涌水水,当相距距5米以内的的邻桩桩孔孔积水很深深时,要考考虑对正在在挖孔桩的的危险影响响,一般应应暂停施工工,人不准准下孔。随随时加强对对土壁涌水水情况的观观察,发现现异常情况况应及时采采取处理措措施。采用用潜水泵抽抽水时,基基本上抽干干孔中积水水后,作业业人员才能能下至孔中中进行挖土土作业。地地下水丰富富时,可将将中间部位位桩孔提前前开挖,汇汇集附近的的地下水,用用潜水泵将将水抽出,起起到深井降降水作用。施施工中应随随时检查垂垂直运输设设备的完好好情况和孔孔壁情况。(2)防机械伤害::对施工现现场所有设设备、设施施、安全装装置、工具具和劳保用用品等需要要经常进行行检查,确确保完好和和安全使用用。对提升升架卷扬机机质量、滑滑轮、吊绳绳等定期检检查,防止止断落、脱脱落等可能能事故。上上班前以及及施工过程程中,应随随时注意检检查提升架架、支脚、吊吊绳、挂钩钩(保险钩钩)、提桶桶等设备,发发现问题应应立即维修修或更换。对对运土吊筒筒经常检查查其质量、吊吊绳是否扎扎牢,以防防掉土、掉掉石砸伤井井下作业人人员。为防防止机械伤伤害事故,施施工现场的的机具设备备的拆除和和安装必须须有专业人人员操作,各各施工小组组的卷扬机机操作人员员要熟悉卷卷扬机的操操作要求,卷卷扬机的防防护装置必必须安装牢牢固,并且且性能可靠靠。为防止止运行中的的机械设备备或零部件件超过极限限位置,应应配置可靠靠的限位装装置。机械械设备应设设置可靠的的制动装置置,以保证证接近危险险时有效的的制动。机机械设备的的气、液传传动机构,应应设有控制制超压、防防止泄露装装置。(3)防物体打击、防防倾覆措施施为防止物体打击击,孔内作作业人员一一定要载好好安全帽,井井口护圈要要高出地面面0.255m,防止井井口杂物掉掉入桩孔内内砸伤人员员。弃土和和工具等放放置在井圈圈外,挖出出的土方应应及时运离离孔口,不不得堆放在在孔口,砼砼围圈上不不得放置工工具和站人人。孔内作作业人员必必须头戴安安全帽、身身系安全带带。每天施施工前对卷卷扬机和钢钢丝绳进行行检查,确确定其安全全起吊能力力后方可进进行作业。为为确保吊运运土体时提提升架的稳稳定,须在在提升架尾尾部采取压压砂袋或配配重的方式式,避免架架体倾覆,导导致事故发发生。(4)防触电措施为防止作业人员员触电,施施工现场的的一切电源源、电路的的安装和拆拆除必须由由持证电工工操作,用用电系统必必须符合《施施工现场临临时用电安安全技术规规范》。用用电设备必必须严格接接地或接零零保护且安安装漏电保保护器,各各桩孔用电电以及水泵泵用电必须须分闸,严严禁一闸多多用。孔上上电缆必须须架空,严严禁拖地,孔孔内电缆、电电线必须采采用护套等等有防磨损损、防潮、防防断等保护护措施。孔孔内照明应应采用安全全矿灯或12伏的安全全灯。孔中中操作工应应手戴工作作手套,脚脚穿绝缘胶胶鞋。定期期对临时用用电工程进进行检测,以以监视临时时用电工程程是否安全全可靠,并并做好检测测记录。加加强日常和和定期维修修工作,及及时发现和和消除隐患患,并建立立维修工作作记录,记记载维修时时间、地点点、设备、内内容、技术术措施、处处理结果、维维修人员、验验收人员等等。定期对对专业电工工和各类用用电人员进进行用电安安全教育和和培训,并并对临时用用电工程各各部位的操操作、监护护、维修分分片、分块块、分机落落实到人,并并辅以必要要的奖惩。(5)照明、通风措措施1)、桩孔内一律律采用12伏低压防防水带罩灯灯照明,现现场用电均均安装漏电电装置。2)、挖井至5mm以下时,需需用可燃气气体测定仪仪,检查孔孔内作业面面是否有沼沼气。若发发现有,要要处理后能能作业。3)、每次下井前前,对井内内空气进行行活体生禽禽检测和机机器检测,发发现有毒气气体或毒气气含量超过过允许值,则则必须进行行通风换气气后再下井井作业。4)、上班前,先先用鼓风机机向深井通通风,确保保安全后,方方可下井作作业。(6)防中毒、窒息息措施当桩孔孔深超过过5m时,地面面配备向孔孔内送风装装置,风量量不少于25L//S。因地下下特殊地层层中往往含含有CO、SO2、H2S或其它有有毒气体,为为防止作业业人员孔中中防毒和窒窒息,每次次下孔前,除除用活体生生禽检测外外,还必须须对孔内空空气进行仪仪器检测;;施工过程程中随时进进行气体机机器抽检,同同时配备空空压机、鼓鼓风机和足足够到井底底的通风管管。根据检检测的结果果和孔底作作业人员的的需要,随随时向孔内内通风换气气;施工过过程中,由由鼓风机不不间断向孔孔内送风;;中途休息息复工前还还应向桩孔孔内由下而而上吹风至至少10分钟。人人工挖孔作作业一旦发发生人员中中毒、窒息息等事故,必必须在现场场按应急预预案要求实实施抢救,根根据具体情情况采取现现场实救或或及时送医医院进一步步抢救治疗疗,并报当当地建设行行政主管部部门和劳动动、卫生部部门,以便便采取相应应措施。孔孔内作业人人员应勤轮轮换,连续续作业时间间不宜超过过1小时,以以防止疲劳劳引发安全全事故。7、施工过程中的的安全巡查查、巡视措措施本项目人工挖孔孔桩施工过过程中,安安全管理人人员及班组组长应每日日开工前依依据“安全事项项检查表”、“人工挖孔孔桩施工安安全专项检检查评分表表”对施工部部位进行巡巡查巡视。5.3、降水与与排水措施施1、降水:本工程程降水利用用人工挖孔孔桩完成好好的桩井,在在整个平面面中取较有有代表性的的部位,进进行降水,降降水井护壁壁要加厚100mmm,钢筋Φ8@1550改成Φ12@1150加密加强强处理。2、回灌:在整个个挖孔降水水过程中。通通过对水位位观测井水水位进行监监测,如发发现水位变变化达到1.5mm/天,或地地面沉降允允许值超过过设计值时时,应采取取向井内回回灌水,以以保持地下下水位,控控制地面沉沉降。3、排水:在整个个基坑支护护四周设置置300××300排水沟,同同时在较有有代表性位位置设置集集水井。便便于把地下下水及雨水水抽到基坑坑上排水沟沟。从基坑坑集水井中中把多余的的地下水及及雨水抽到到基坑外排排水沟排到到沉砂池过过滤后再排排放到市政政管道井,以以保证整个个施工过程程降水、回回灌、排水水等都达到到政府部门门的有关规规定。5.4、遇不良良地质情况况的处理措措施1、根据不同情况况减少每节节护壁高度度至3000~500mmm。2、对较易塌方施施工段要即即挖即验收收即浇灌护护壁砼,要要保证砼密密实度,避避免渗漏,砼砼中应加速速凝剂,加加快凝固速速度。3、遇到流砂的桩桩位,先将将附近无流流砂的桩孔孔挖深,使使其起到集集水井的作作用,集水水井应选在在地下水流流的上方,用用水泵抽水水,将桩孔孔和附近的的地下水位位降至井底底下,使井井底免受水水淹状态下下施工。若若按上述方方法仍无法法施工,可可沿护四周周打入直径径16@1000,L=10000mm的的钢筋,掏掏空一块,随随即用稻草草来堵塞,以以堵住流砂砂、流泥,从从而保证质质量和安全全。4、对流泥、流砂砂特别严重重的桩孔,应应迅速用砂砂回填桩孔孔到能控制制塌孔为止止,并速报报甲方、设设计、监理理等部门研研究处理。5、根据现场地质质情况提高高砼护壁的的强度,并并掺加速凝凝剂来确保保护壁安全全,护壁强强度不到不不能拆除护护壁模板,施施工前进行行护壁砼的的试验,得得出在不同同强度及不不同外加剂剂情况下,护护壁砼的强强度增长规规律,以确确保护壁砼砼的强度。5.5、临时道道路方案设置临时道路,实实行人车分分流,施工工道路宽为为7米,人行行道2.0米宽,路路肩为0.5米。路面面结构:面面层为200厚C35砼;基层层为100厚8%石粉稳定定层;底层层为素土夯夯实层,夯夯实系数0.9;人行道道结构:100厚C35砼面层,100厚8%石粉稳定定基层。道道路土方回回填,按50cm厚逐层回回填夯实,满满足大型机机械设备通通行。道路路边坡支护护:挂设ØØ6@2000钢筋网片片,喷射100厚C20砼一道,保保证边坡稳稳定。5.6、应急方方案1、危险源和可能能造成的伤伤害人工挖孔桩由于于其具有施施工设备简简单、在正正常的施工工条件下质质量容易控控制,而且且对环境污污染少等优优点;但是是,也存在在许多缺点点,比较突突出的是工工人劳动强强度大,作作业环境差差,危险源源较多。因因此,有必必要针对可可能发生的的危险源及及伤害因素素制定相应应的安全技技术措施加加以控制,才才能对安全全施工起到到保障作用用。危险源:人员、施施工车辆在在孔口周行行走、施工工中容易造造成坠物落落孔、人体体落孔;人人员在开挖挖面施工时时,有可能能产生触电电、起重工工具失灵、塌塌孔、孔内内有毒气体体、吊桶内内石块掉下下等危险。可能造成的伤害害:高处坠坠落、物体体打击、机机械伤害、中中毒等安全全事故。2、应急与响应机机构职责与分工(一)现场指挥挥组组长:副组长:成员:职责责:负责组组织与指挥挥整个事故故现场的抢抢救工作,向向各应急小小组调配应应急所需的的资源(人人力、物力力、资金)并并对突发事事件的应急急响应工作做出决定定。(二)抢救疏散散组组长:成员:职责:负责组织织抢救受伤伤人员、疏疏散物资材材料、汽车车、设备工工作,了解解事故现场场需要抢救救人员的数数量和抢救救地点、危危险程度并并具体组织织抢救疏散散。负责车车辆及相应应工具的供供应,通过过各种方法法了解事故故现场全面面情况及其其变化,及及时向现场场指挥组提提供真实可可靠的情况况。(三)医疗救护护组组长:成员:职责:主要负责责组织抢救救伤员的应应急救护工工作。(四)安全警戒戒组组长:组员:职责:负责现场场警戒工作作、禁止无无关人员进进入、保护护好事故现现场。(五)后勤供应应组组长:成员:职责:迅速调配配抢救运输输车辆至事事故发生点点;提供和检检查抢险人人员的装备备和安全防防护。3、应急救援物资资应急救援物资表表序号物资名称单位数量1防尘口罩个102防毒面罩个103防毒口罩个64绝缘手套双105绝缘鞋双406普通口罩个407灭火器个508安全带条409安全帽个3010雨衣、水鞋双811沙袋包3012救生箱个30013担架架34、报告(一)报告流程程当事故发生时、按按以下工作作流程迅速速报告:事事故第一发发现人现场场值班人员员→工程部→现场指挥挥组→中南大学学湘雅三医医院→公司总经经理。(二)报告内容容现场伤伤害事故发发生时间、地地点、伤亡亡和财产损损失基本情情况,可能能产生的后后果、性质质、当前现现场状况初初步减少伤伤亡损失的的应急措施施。(三)联系方式式利用对对讲话和电电话联系生生产调度部部门和安全全部门值班班人员,由由值班人员员按流程逐逐级报告。5、联络(一)医疗救护护组与医院院急救中心心取得联系系,报告事事故地点人人员伤亡情情况,联系系医务人员员及救护车车辆。(二)抢救疏散散组随时与与急救中心心保持联系系,指挥疏疏散,小组组派专人在在路口引导导救护车辆辆,以便顺顺利准确到到达指定地地点。医院名称:xxxxx医院地址:急救电话xxxx医院与与工地地图图6、疏散(一)疏疏散组首先先了解事故故现场有无无被困地点点和抢救通通道是否畅畅通。(二)疏疏散组在极极易造成拥拥挤疏散通通道布置专专人看护。(三)疏疏散组派专专人引导疏疏散至安全全地带,并并确认是否否有人员未未能脱离危危险区,如如存在立即即进行施救救。(四)指指挥组调派派现场安全全值班车辆辆到达事故故现场待令令,并联系系施救所需需设备、器器具。7、应急措施抢救疏散组迅速速对事故现现场是否存存在二次危危险源进行行确认、防防止事故蔓蔓延扩大。若若事故现场场存在有再再次发生事事故的危险险源时,在在采取可能能的应急措措施后,立立即抢救疏疏散被困现现场人员,立立即组织施施救。(一)发生物体体打击、高高空坠落事事故抢救疏散组立即即使伤员脱脱离危险区区域。救护组确认疏散散出来的人人员伤势情情况。在医疗人员未到到之前救护护组人员根根据伤势情情况采取止止血、人工工呼吸相应应的急救措措施。根据伤势情况、救救护组依照照先重后轻轻的原则分分批送往指指定医院进进行救治。(二)机械伤害害抢救疏散组安排排电工立即即切断事故故现场电源源或移出机机械。、发生机械人员员伤害时,医医疗救护组组应立即对对人员进行行固定、包包扎、止血血、紧急救救护等。伤势严重、呼吸吸中断或心心脏停止跳跳动:医疗疗救护组人人员应立即即进行人工工呼吸和胸胸外挤压急急救。根据伤情情况、救救护组依照照先重后轻轻的原则分分批送往指指定医院进进行救治。(三)中毒抢救组立即赶往往事故现场场,检查中中毒患者基基本症状。后勤保障组及时时调派安全全值班车到到达事故现现场,并与与相关单位位和部门联联系抢救所所需设备、器器具。、在医疗人员未未到之前、救救护组对患患者采取现现场应急救救护措施。转送中毒人员途途中,应有有抢救人员员相随,密密切观察患患者病情变变化,随时时采取应急急救助措施施。8、现场保护(一)安全警戒戒组划定安安全警戒区区域并组织织相关人员员认真保护护事故现场场,凡与事事故有关的的物体、痕痕迹、状态态均不得破破坏,为抢抢救伤员需需要移动现现场某些物物体时,必必须做好现现场标志。(二)成立由项项目部总经经理牵头、由由施工部、技技术部、安安全等部门门人员及工工会组织成成员的事故故调查组、配配合有关部部门收集相相关证据分分析事故原原因。9、现场恢复抢险工作完毕,省省指安全处处和地方安安监部门现现场调查取取证结束后后,充分辩辩识恢复过过程中存在在的危险源源,当安全全隐患彻底底清除后,方方可恢复正正常工作状状态。10、安全技术交底底现场设专职安全全员,负责责巡视边坡坡及现场施施工安全。孔内应设置应急急软梯,现现场应准备备安全绳。现场施工人员必必须戴好安安全帽,系系好安全带带,班长要要在作业前前针对施工工现场实际际情况进行行安全施工工交底,做做好安全措措施。护壁钢模在浇注注砼强度24小时后方方可拆除。每个孔须备孔盖盖,每班作作业前打开开孔盖,通通风后方可可下孔作业业,深度超超过5m或遇到黑黑色土层,深深灰色土层时时,要进行行强制通风风,发现孔孔内气味有有异时,应应及时沿安安全绳出来来并及时上上报,等采采取防范措措施后,方可进行行施工。孔内无人作业时时,应将井井口盖好,夜夜间应在孔孔口设警示示红灯。孔孔口护壁高高出地面15cm,并加盖盖井盖,避避免渣土落落入孔中。孔内挖出的土方方应及时运运走,暂时时不能运走走的,应堆堆放在孔口口边3m以外,且且高度不得得超过1m。孔内有人作业时时,孔口上上要有人监监护,随时时与孔内人人员保持联联系,发现现异常,立立即协助孔孔内人员撤撤离。挖孔时如遇到渗渗水层或流流沙,应及及时封堵并并减少每段段开挖深度度,迅速支支模并做好好护壁。已灌注完毕桩孔孔临近的桩桩,必须在在该桩孔内内砼强度72小时以上上,方可开开孔。每天施工前应检检查所用工工具、设备备,保证工工具设备的的完好性。应应对提升设设备进行检检查,严禁禁使用开焊焊、开裂、破破损的设备备。吊索采采用直径6mm的钢丝绳绳,承载力力不得小于于2KN;安全绳绳采用直径径20mm的棕绳,承承载力不小小于1.5KKN。料筒装土不能过过满,孔口口边不能堆堆放杂物,严严禁向孔内内投料、投投物。施工现场夜间照照明灯具,高高度应距离离地面2.5m以上,易易爆场所应应使用防爆爆灯具,按按规定应接接地的必须须接地。孔内作业时应保保证孔内通通风,孔内内照明应使使用低压安安全电源(不不超过36伏)。所有电动机具、机机械、电气气设备必须须由专职电电工或持证证的操作手手进行操作作和维修,非非电工或操操作手不得随意意动用机电电设备。所有机械必须由由专职操作作手操作和和维修,按按操作规程程操作。严严禁非操作作人员随意意动用机械械。施工时严禁大型型机械在距距孔10.00m范围内运运行,确保保施工安全全。如果护壁即将发发生坍塌,孔孔内作业人人员应立即即爬出,并并及时向孔孔内回填,妥妥善处理后后再进行施施工。第六章、文明施施工措施6.1、文明施施工措施1、工作期间不得吸吸烟、饮酒酒、赌博,严严格遵守工工地的各项项规章制度度。2、严格执行人工挖挖孔操作规规定,遵守守现场各项项管理制度度,保证施施工质量与与安全,做做到文明施施工。3、建立健全现场料料具管理制制度,落实实料具管理理人员,明明确职责。4、制定材料节约措措施,并做做好材料节节约台账、报报表。5、各种材料的进出出场手续、领领退料手续续必须齐全全。6、现场料具堆放必必须按统一一指定的位位置,严禁禁乱堆乱放放。7、现场使用的材料料必须有合合格证,材材料员要搞搞好材料合合格证的搜搜集工作。8、每道工序完工需需做到工完完场地清,剩剩余材料按按指定地方方码放好。9、施工现场临时用用电执行安安全技术规规范JGJ446-20005。10、文明施工检查中中发现的问问题,保证证在8小时内予予以整改,并并以书面形形式答复。11、保证文明施工管管理措施落落实,责任任到人,有有奖有罚。12、工程施工后,在在道路工程程通车前拆拆除工地围围栏、安全全防护设施施和其他临临时设施,并并将工地及及周围环境境清理整洁洁,做到工工完料净场场清。13、无条件接受业主主和监理工工程师有关关文明施工工的监督。14、依法施工,办理理有关手续续后方进行行施工。6.2、环境保保护措施1、工地围蔽(1)根据现场施工的的施工布置置和进度安安排,在工工地的外围围采用围蔽蔽形式按照照市有关工工程施工场场地围蔽标标准作法执执行,对施施工现场实实行封闭式式施工,围围墙高度不不低于2.5米,对围围蔽外作装装修处理并并挂设明显显施工指示示标志与周周边环境和和氛围相和和谐。(2)施工进出口设置置施工标牌牌,写明工工程名称、建建设规模、建建设单位、施施工单位、监监理单位、设设计单位、工工地施工及及监理负责责人姓名,同同时设置施施工组织网网络牌、安安全生产宣宣传牌、质质量宣传牌牌、防火须须知牌、事事故记录牌牌和施工总总平面图。(3)现场临设场地(包包括办公区区、生活区区)周围均均采用统一一、标准二二层板房,现现场办公室室内张贴施施工许可证证、规划许许可证复印印件,悬挂挂质量管理理、文明施施工、安全全生产制度度和组织机机构表、施施工现场平平面布置图图。2、振动控制(1)严格进行各种施施工机具的的检验维修修,对不符符合标准的的汽车、机机械严禁使使用。(2)对工程所需的震震动源设备备的设置有有条件的尽尽量远离民民居。(3)合理调配施工机机械,避免免集中使用用大量施工工机械,造造成震动过过大。(4)对能产生振动的的作业(如如破除混凝凝土、路基基、路床碾碾压等)应应事先向操操作工人提提出警告和和进行环保保培训,通通过采取一一些具体措措施加以控控制。(5)严格执行夜间施施工规定,禁禁止夜间使使用高震动动设备,减轻对附附近居民的的影响。(6)对排水横过管的的施工尽量量一晚完成成,如必要要在白天铺铺盖钢板的的,先在地地面打膨胀胀螺丝,钢钢板必须于于螺丝焊接接稳固,同同时,经常常性的对施施工场地进进行平整,确确保车辆通通行的平稳稳,减少振振动。3、噪音控制(1)禁止一切进出车车辆在工地地鸣笛,加加强对运土土机械、运运输车辆、大大型动力设设备的维修修保养,安安装有效的的消声器,采采用性能良良好的机械械设备,认认真做好加加油、保养养工作,减减少施工时时机械发出出的噪音。对对不符合噪噪音标准的的汽车、机机械严禁使使用。(2)考虑现场的特殊殊性,施工工用电尽量量不采用发发电机发电电,对空压压机等噪音音、设备的的设置尽量量远离民居居,人工挖挖孔桩施工工时置于基基坑底。(3)工地设专门的交交通安全员员,严格执执行市汽车车禁鸣的规规定。(4)合理调配施工机机械,避免免集中使用用大量施工工机械,造造成噪音大大。(5)采用围蔽分隔声声源减少噪噪声,围护护材料不得得有破损现现象,并连连接紧密牢牢固,连接接可靠。(6)对有些工序能采采用无噪音音作业的优优先采用,尽尽可能做到到低噪音作作业,如不不可避免要要产生较大大的噪音,应应事先与周周边单位和和居民进行行沟通,以以免造成不不必要的心心理恐慌。(7)严格执行夜间施施工规定,禁禁止夜间使使用高噪音音设备,减轻对附附近居民的的影响。4、空气污染控制制(1)不允许使用超标标车辆进入入施工现场场,最大限限度减少废废气排放。(2)工地临设食堂燃燃料使用液液化石油气气等清洁料料,不使用用木柴等引引起空气污污染等燃料料。(3)施工场地除开挖挖线内的地地方,全部部进行硬化化,防止扬扬尘。每天天专人负责责给施工场场地和现场场的机动道道淋水,以以减少工地地的尘土。(4)按劳动保护条例例,为工地地操作人员员装备各种种尘埃防护护设施。(5)施工中对容易起起尘的细料料和松散材材料,予以以覆盖或适适当的洒水水喷湿。这这些材料在在运输期间间,用帆布布或类似的的遮盖物覆覆盖。(6)合理调配施工机机械,避免免集中使用用大量施工工机械造成成局部环境境污染。(7)水泥临时存放地地应设置离离居民区或或厂区较远远的地方,并并加盖顶棚棚,尽量减减少水泥灰灰尘的上扬扬。(7)对施工作业易产产生灰尘或或污染的工工序(如土土方开挖和和用机具破破除混凝土土结构)要要有专人负负责,及时时采取可行行的措施,包包括监理工工程师认为为有必要的的洒水,必必要时搭棚棚遮盖,以以使施工作作业产生的的灰尘减至至最低程度度。(8)在现场进出大门门地点应安安装车辆轮轮胎冲洗设设备,在车车辆离开现现场进入公公共道路上上之前,保保持车辆清清洁干净。5、水质污染控制制(1)设置污水沉淀池池,施工排排水、生活活污水必须须经沉淀处处理才能排排入到附近近的市政污污水管道中中。(2)在施工现场设洗洗脸间和冲冲水厕所,并并且足够现现场所有人人员使用,厕所外设设化粪池。(3)进行工作的每一一块区段,均均备临时的的污水汇集集设施,并并通过水泵泵将污水汇汇集到沉淀淀池中,以以保证场地地内排水畅畅通。对施施工废水和和地下水进进行沉淀净净化,以防防止泥浆、杂杂物堵塞下下水道,防防止污染地地下水。(4)定期为施工场地地内的水源源、水池、水水沟等进行行洒药灭蚊蚊、灭虫、灭灭鼠措施。(5)施工期间和完工工之后,对对建筑场地地、砂石料料场地进行行适当处理理,以减少少对河流和和溪流的侵侵蚀。(6)施工期间,施工工废料如水水泥、油料料、化学品品堆放,进进行严格管管理,防止止雨季物料料随雨水径径流排入地地表及相应应的水域,造造成污染。(7)施工时,机械废废液用容器器收集,不不随意乱倒倒。防止机机械严重漏漏油,施工工机械运转转中产生的的油污水及及维修施工工机械时油油污水不经经处理不得得直接排放放。(8)路面卫生维护护措施(9)专人负责给施工工便道和现现场的机动动道淋水,以以减少工地地的尘土。(10)专人负责路况维维护工作,经经常检查施施工用道的的路况,对对因施工造造成的路面面破损、凹凹陷等及时时进行修补补,对发生生积水、边边沟排水不不通畅进行行疏导,确确保路况完完好。(
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026广东广州市增城区派潭中学历史教师招聘1人备考题库有答案详解
- 2026安徽皖能环境科技有限公司社会招聘1人备考题库含答案详解(精练)
- 2026广西玉林市玉州区仁东中心卫生院招聘编外人员3人备考题库带答案详解(完整版)
- 2026陕西西安市鹿原中学招聘备考题库及参考答案详解1套
- 2026年4月广东深圳市大鹏新区南澳办事处招聘编外人员2人备考题库含答案详解(完整版)
- 2026内蒙古包头固阳县劳动人事争议仲裁院招募20人备考题库及一套完整答案详解
- 2026重庆市中医骨科医院第二批编外聘用人员招聘9人备考题库附答案详解(能力提升)
- 2026湖北鄂州临空人力资源有限公司招聘第一批协管员7人备考题库含答案详解
- 2026云南红河州开远市科学技术协会招聘就业见习人员4人备考题库附答案详解(研优卷)
- 2026四川成都市金牛区西华社区卫生服务中心招聘4人备考题库含答案详解(巩固)
- 2026云南省投资控股集团有限公司招聘168人笔试历年参考题库附带答案详解
- 2026年中医骨伤科(正-副高)试题(得分题)附答案详解(完整版)
- (2025年)电工三级安全教育试题及答案
- 2026年设备状态监测的标准与规范
- 2026广东东莞市常平镇编外聘用人员招聘5人备考题库附答案详解(完整版)
- 高中主题班会 高二上学期《学会专注、高效学习》主题班会课件
- 基建科内部控制制度汇编
- 学校2026年春季学期师德师风工作计划(附每周工作行事历)
- 湖北省鄂东南五校一体联盟联考2026届数学高一下期末质量跟踪监视模拟试题含解析
- 2026四川成都市锦江发展集团下属锦发展生态公司下属公司项目制员工第一次招聘7人笔试备考试题及答案解析
- 廊道、洞室及有限空间作业安全注意事项
评论
0/150
提交评论