施工现场安全环境标准化
图集
前言
落实住建委推进施工现场安全标准化和绿色施工的工作要求,提高公司绿色文明施工管理水平,编制本图集。本图集在满足遵守国家法律、法规、行业及地方规范、标准要求的同时,力求做到简单经济实用、便于维护、可周转、工具化。充分考虑到项目成本,在符合国家规范要求的前提下供项目执行,可依据工程的实际情况,科学、合理采用,在符合相关规范的前提下提倡技术创新,鼓励采用更科学、更安全、更具操作性的措施。本图集涉及的企业标识以实际施工资质企业标识为准。所选用防护实施的材料必须满足刚度、厚度及冲击力等规范要求。本图集应在施工实践过程中不断完善,请使用部门依据实际情况提出合理化建议,将在修订中予以采纳。安全生产部
目录第一章施工区·································································31基础设施······························································42安全防护·····························································153临时用电·····························································224材料存放·····························································295施工机械·····························································356脚手架································································517消防设施·····························································668安全标志、标识、标语、彩旗·································689垃圾站································································69第二章办公区································································70第三章生活区································································75第3页共87页第一章
施工区第4页共87页1.1大门1基础设施第一章施工区(1)施工现场设置固定的出入口,出入口设置大门。
(2)门柱:门柱为钢结构主体架,采用户外喷绘,颜色为蓝、白色,标识文字黑、蓝。
(3)大门:大门为两开四扇,总宽度为7.6m。基本要求logo第5页共87页基本要求1基础设施第一章施工区1.2旗杆(1)在施工现场内应设置升旗处,悬挂国旗、顺鑫控股旗、顺鑫天宇旗,各旗应保持干净整洁。(2)台座前面制作“顺鑫天宇”标识。旗帜摆设中间为国旗,右为顺鑫控股旗帜,左为顺鑫天宇旗帜。(3)台座高800mm,宽800mm。旗帜是展示企业形象的重要媒介之一,制作时应严格按照本页规范执行。logo第6页共87页1.3门禁系统、门卫室和大门1基础设施第一章施工区门禁系统通道此样式适用于施工现场与生活区独立分开的工程。施工现场和生活区在同一区域内的样式见1.1(1)大门旁设置门禁系统通道,通道采用轻钢装配式结构。(2)通道口设置实名制刷卡系统。(3)进口处设置标语及安全警示镜。(4)通道挂设展板及宣传画。
(5)门卫室设置门牌。
(6)室内整洁干净,悬挂门卫管理制度,制作方式和办公室制度牌统一。基本要求门禁系统及门卫室俯视示意图logo第7页共87页1.5围墙1基础设施第一章施工区logo
施工现场实行封闭式管理,围墙坚固、严密,高度不低于2.5米,围墙材质一般为彩钢板,采用装配式,围墙表面平整、清洁。基本要求(1)组合方式:从大门边的第二块板(白色)起,每隔八块蓝色板,设一块白色板。(2)白色板上制作相应企业标识(上下组合图形),图形组合尺寸为70×50cm(高×宽)。(3)围墙为2.5米。如为高度低于2.5米围挡板,在围挡下制作增加部分(底座)。市政工程围挡板,施工路口或拐弯处采用下段1米高处封闭板、上段1.5米高处使用钢丝网,保证拐弯人员车辆视线。第8页共87页1.6门卫室1基础设施第一章施工区(1)采用彩钢板板房,保持其本色,可设置遮阳伞。
(2)侧墙粘贴报警电话牌(火警“119”,匪警“110”,急救“120”的报警牌),图牌尺寸为:60×40cm。
(3)门卫室设置门牌。
(4)室内整洁干净,悬挂门卫管理制度,制作方式和办公室制度牌统一。基本要求logo第9页共87页1.7车辆冲洗设施1基础设施第一章施工区(1)施工区出入口设置冲洗车辆的洗车设施。
(2)泥浆应经流水槽或管道流到工地集水池统一沉淀处理,不得随意排放和污染施工区域以外的河道、路面。
(3)每日对出入口周边定时清扫、洒水。
基本要求logo自制洗车池北京建委要求,在土方施工阶段应安装使用高效洗轮机第10页共87页1.8图牌1基础设施第一章施工区logo基本要求(1)大门合适位置设置两张图板,包括:六板两图和工程效果图板;公示牌图板。(2)每半年见新一次。(3)板图材质为喷绘。六板两图和工程效果图板公示牌图板第11页共87页1.9主要道路1基础设施第一章施工区logo基本要求(1)主干路采用混凝土地面或其他硬化地面的措施,平整坚固,有良好的排水设施。(2)主干道两侧可设置宣传标语或教育栏。以企业口号、形象及质量安全等内容为主。(3)设置警示限速牌。(4)每日定时洒水降尘主干道两侧宣传栏,宜使用库存的原五板一图框架主干路大样图警示限速牌第12页共87页2.1安全通道防护2安全防护第一章施工区(1)安全通道防护棚一般用钢管扣件搭设,两侧搭设剪刀撑并满挂绿色密目安全网。
(2)多层建筑防护棚长度不小于4米,高层建筑防护棚长度不小于6米。
(3)防护棚采用双层顶棚形式,顶层满铺50mm厚脚手板,两层板之间应保持500mm间距。
(4)防护棚两侧应搭设钢管立柱,在进口处张挂安全警示标志牌和安全宣传标语。logo密目网立杆6号提示牌7号提示牌斜杆地坪基本要求第13页共87页2.2临边防护2安全防护第一章施工区logo基本要求(1)本图例为工具式防护栏杆,采用30X30X1.5方管制作,具体尺寸及作法见图所示。(2)本防护方式适用于所有临边防护。临边防护立面图临边防护节点图第14页共87页2.3临边防护(基坑防护)2安全防护第一章施工区logo基本要求(1)防护栏杆外侧应设置排水沟,采取有组织的排水。(2)防护栏杆外侧应悬挂警示标识。(3)临边夜间作业需设置足够的照明措施并设置警示灯。基坑、槽、沟、楼层临边、窗边、作业层警示标识2.3其他临边标识悬挂于施工现场楼层临边、窗口边、作业层等处,面向结构内悬挂于施工现场临边作业、高处作业等区域
第15页共87页2.5电梯井(管道井)防护2安全防护第一章施工区logo基本要求(1)使用强度符合要求的圆钢、方钢等材料,制作可周转、能重复使用的电梯井口防护门。(2)电梯井(管道井)口安装≮1500mm高工具式防护门。防护门底部安装200mm高木质踢脚板。防护门和踢脚板刷红白相间警戒色。防护门外侧悬挂安全警示牌。3、管道井口处必须设置固定式防护门,门高度不得低于1500mm,竖向钢筋间距不得大于150mm。4、防护门四角须固定。电梯井防护立面图电梯井防护节点电梯井立面防护示意图第16页共87页2.6边长<1500mm的预留洞防护2安全防护第一章施工区logo基本要求(1)楼板、屋面和平台等面上短边尺寸小于500mm的洞口,必须用坚实的盖板盖住洞口。短边尺寸在500-1500mm之间的洞口,采取预留钢筋网片加盖板方式防护。(2)盖板须保持四周搁置均衡,搭接长度不小于100mm,并用钉在盖板上的木方顶紧洞口边框,防止盖板移位。(3)盖板上表面刷红白相间警戒色和黑色“严禁挪移”字样。钉子钉牢洞口
A-A模板方木或原洞口模板俯视图第17页共87页2.7边长>1500mm的预留洞防护2安全防护第一章施工区logo(1)洞口临边采用临边防护标准化设施见2.2(2)主体结构施工阶段,洞口采用木模板和木枋封闭;安装及装修阶段,洞口采用水平安全网封闭。2.7验收牌基本要求(1)施工现场脚手架、起重机械、配电箱、防护棚等经过验收合格后应悬挂验收牌;(2)验收牌尺寸:宽×高﹦500×400mm;(3)验收牌为白底红字(标题)、蓝字(内容)黑体。第18页共87页3临时用电第一章施工区logo分配电箱开关箱总配电箱基本要求(1)施工现场配电箱粘贴或喷涂企业标识;(2)门内侧配箱内系统图、电器元件、线号应标识清楚;(3)验收合格后张贴验收标志【见3.3配电箱(验收标志)】。3.1配电箱第19页共87页3.2配电箱(手提开关箱)3临时用电第一章施工区logo基本要求(1)使用手提式电箱必须按照“一隔一漏一箱一锁”标准设置,严禁一个电箱同时接2台及以上用电设备。(2)箱内采用插座连接时,单相电箱可安装2P3P插座各一个,便于使用2或3极插头。(3)动力电箱可安装相序相反的2个插座便于动力设备改变相序。3.3配电箱(验收标志)基本要求(1)施工现场使用的开关箱、分配箱、开关箱应进行进场验收,验收合格后张贴验收标志。(2)配电箱管理制度牌采用不干胶制作,尺寸:宽×高﹦500×400mm。(3)验收标志上要填写配电箱编号、责任人、电话。第20页共87页3.茶4配电箱甜(防护杜棚)3临时奖用电第一章施工区log穴o基本要求(1)配电鹊箱防护矛棚可采粉用方钢衡或圆钢诉制作,律稳固安诱置在混俯凝土承盗台上并母应接地丘。(2)顶部沈采用双尊层硬防薄护,底瓦层为彩触钢板,含上层为广模板,愧并设不结小于5%坡度的任排水坡丈。(3)双层版硬防护痒间的防为护棚外要立面挂责蓝底白雕字的安怕全宣传吃标语:竟加强安掀全用电刊,防止球触电伤怒害。防户护棚正候面安全炊警示牌岔,侧面可挂相应而企业标搜识。(4)配电参箱栏杆遇刷红白岁相间警标戒色。(5)配惊电箱磁与防烟护棚贫之间己的距云离如缩慧节点救详图剥所示息。一级更配电绘箱防姻护立外面详鞭图节点诉详图安全为警示包牌第21页共87页3.7楼层配典电3临时越用电第一章施工区lo献go基本要求(1)电衰缆线咐穿越拍建筑跌物、浑构筑喉物、格道路诊、易具受机行械损因伤的首场所怨及引榴出地粗面从2m高度丝式至地腹下20矮0m狠m处,应栋加设防夸护套管擦;(2)电达缆垂比直敷稿设的导位置讯应充帐分利识用在戴建工棒程的阔竖井巧、垂辣直孔虾洞等笑,并描应靠著近负积荷中哥心,准固定匙点每适层不乌得少哑于一妄点,百水平创向电跨缆线做敷设烟应在睡墙体2.5油m以上乌做支鸭架架纳设,窄固定霸点应近绝缘流保护奇;(3)水坚平敷泽设宜钞采用叨三角评支架耳或钢袋索进痰行高雕挂,狗高度沈不得悲低于2.5饱m,若因图作业限慰制无法算高挂的班,可沿吉墙角、匙地面敷排设,但姑应采取进防机械叔损伤措书施,并剃设警示蜂标识;(4)楼层口内固定乌式配电侄箱应考锁虑做重圆复接地赔,接地滚体应预若埋,重亩复接地胖竖向距分离不大剪于20父m(每5层)莲做一霞处。第22页共87页3.永8电焊机首使用3临时丈用电第一章施工区log圣o基本要求(1)电焊炒机一侧爬电源线庄长度不扮得大于5米,二遣侧焊把沉线长度青不得大强于30米。(2)电焊怒机外壳有应做保僚护接零退。(3)电葛焊机涛应配万装二箭次侧着空载呀降压令保护伍器。(4)露天淹冒雨不辆得从事需电焊作鬼业。(5)电焊做机一侧晴、二侧娱接线处容防护罩划应齐全身。第23页共87页4.2钢筋存使放4材料存厚放第一章施工区lo杏go基本要求(1)设回置专略门的罢存放踏区,诵地面的平整红夯实立或硬马化。(2)按长铁度方向鞋平行间喷隔3.童8-饲4米(以批实际钢援筋长度寻为准)呆平行码转放砼梁婚;宽度践方向设设置坚固线的槽钢多立柱三山个,间么隔1.雨2米,高敢度0.蛙6米。(3)每个丽立柱间渔分类整浇齐码放甩,码放篮高度不完高于立临柱。(4)设脚置钢筋盐堆放区源标识牌宝。第24页共87页4.圆4其他哑材料祖存放4材料存铲放第一章施工区log鸦o基本要求(1)设置礼专门的究存放区篮,地面馅平整夯朋实或硬雄化。(2)建筑善材料、木构件、透料具应咏按总平哀面布局伴分类码倦放,攀零散物骑料设置觉容器或捧封闭覆划盖。(3)材泳料标工识牌掘采用县铝塑条板制斗作,川宽×高为45耍0×局30明0m辉m,蓝边惩、白底最、黑字嚷。(4)标识码牌支架障采用方撞钢和槽拜钢焊接伞,材料益标识清蛛楚。第25页共87页4.旺5气瓶存释放及使合用第一章施工区lo笋go基本要求(1)氧疮气、厦乙炔吸瓶距贯明火淋间距腿不得甜小于10米。(2)氧气委、乙炔尺瓶存放海间距不相得小于5米。(3)氧气纱、乙炔浆不得平过放和曝减晒。(4)氧兰气、佳乙炔土瓶储吊存室幼应分伙开存礼放。4材料存踪蝶放第26页共87页5.1加工炕区设兵置第一章施工区log诉o基本要求(1)设置相阔应加工痰区域区卡,地面义硬化。(2)用防免护栏喘杆进啊行封绕闭分劣隔。堵上道剑栏杆12症00竿mm下道颈栏杆枯高60圆0m怒m。立杆踏间距不断超过20董00杯mm,栏挎杆刷伏红白继相间骡警戒响色。(3)用护绿网童进行窑封闭匀,保密证整替洁完驼好,券没有广破损伯。5施工机念械第27页共87页5.添2加工棚第一章施工区lo娃go基本要求(1)在缩慧塔吊记半径要范围精以内只必须蜓采取圣双层较防护光,满担铺脚绘手板誉或模罢板,手斜面医铺设贵彩钢溪瓦等亭防雨版材料泻。本敏防护愿方式位采用纱方钢鱼、螺贷丝连书接形毕式的猫工具杨化防惠护棚虏。(2)居民蜜区等敏步感区域猴木工加究工棚四咱周进行牺全封闭桐,并设请门窗,殃以达到悦降低噪佛音、扬末尘污染肉的要求焦。(3)加工攻区出入宾口设置躬加工区晚标识牌钻;加工喊棚顶部纲设置宣尖传标语尸和相应漏加工棚浇(正面喝)字样仅。如存怠在死角府面则不重设置标抢语。(4)加工拒棚内设刘置操作拣规程、伍使用责岛任人牌驾。(5)木忠工加钩工棚献设置搜消防再重点姿部位刮标志条。5施工吊机械钢筋娱加工耗棚效艘果示爸意图第28页共87页5.欧2加工棚第一章施工区log贡o基本要求(6)机械雀的安装探应坚实优稳固,渴固定式努机械应步有可靠侨基础,袍移动式蔬机械作水业时应棕楔紧行熄走轮。(7)可应堆炉放好盼成品腐和半席成品馅;作念业完愈成后疯清理拥场地贤,切灾断电打源,航锁好诞开关品箱,地机械唇做好崇润滑仍工作奇。(8)开关告箱安装君在同一忙高度,扎电箱中倡心距离腥地面。5施工机奴械第29页共87页5.3加工竭棚相妈应标艺志第一章施工区log岗o基本要求(1)按要桑求悬挂芝、张贴器警示标川志5施工袭机械悬挂在垦机械设哲备使用识相应部灯位悬挂在摆消防设废施集中格存放处悬挂压于木链工加仅工区惕、木计材存荣放区震以及挑库房受等重坝点防额火区伯域依据健设备怠类型荷悬挂蕉操作弯规程第30页共87页5.4施工骆机具第一章施工区lo旺go基本要框求5施工机弯械小型机本械加工章棚侧立杀面木工机废具防护死示意图小型折机械蝴加工皆棚效芽果示孩意图(1)圆盘烦锯锯片申防护罩握、传动骆防护罩炎、分料脆器完整英并标注衡红白警瓦戒色。(2)其牛他机孤具防叼护设征施齐户全。塔吊斧作业妨半径逆内小展型机鼻械作父业必姨须安橡装双喉层防魄护棚呜,防顾护方民式采屋用钢朱筋棚为做法午,材圣质及资规格辈不变托(见5.2)。基本要求5.佛5小型施强工机械申防护棚第31页共87页5.8塔式定起重执机(锤防护激栏杆述)第一章施工区lo押go基本要求5施工侮机械(1)塔吊言用防护筑栏杆进启行封闭疾,栏杆弊各边大笑于塔吊井标准节宝半径0.剪5米。(2)上道总栏杆高1.6闹00米,中岭间栏杆边高0.9米,怕下道宵栏杆粘高0.2米。出扩入口设注置四道树立杆,孩出入口扮宽1.拍0米,宇其他攀三面姓设置描三道翅立杆车。栏内杆刷柱红白贱相间丝式警戒碧色。第32页共87页5.龄8塔式袍起重乒机(待防护泡栏杆掌)第一章施工区lo尘go基本要求5施工机葬械(1)塔两吊用激防护具栏杆摄进行侵封闭臭,栏甘杆各止边大恰于塔版吊标婆准节订半径0.5米。(2)上道坝栏杆高1.6弓00米,逢中间帮栏杆携高0.9米,码下道妥栏杆役高0.2米。出涝入口设衫置四道放立杆,奶出入口躲宽1.0米,其醉他三面抬设置三莲道立杆跌。栏杆性刷红白榜相间警锣戒色。第33页共87页5.符9塔式附起重妇机(汪验收舱牌)第一章施工区lo漫go基本要求5施工吃机械(1)施丝式工现千场塔立式起谣重机奏安装藏验收蹄合格浊后应猪在塔查吊防餐护栏易杆明手显一煮侧悬卫挂塔催式起键重机衰验收苗牌;(2)验收堡牌内容橡包括:恐塔吊编距号、安桂全操作符规程及遍十不吊惯、设备页产权登呢记牌、战设备使淋用登记表牌、操无作人员怜操作证摄、验收啄时间及竭其它;(3)验收罢牌宽×高≥160筐0mm赛x12急00m途m;(4)验顿收牌赖为白调底,字体为腊黑体。第34页共87页5.1蜜1塔式仆起重勿机(吊装落器具)第一章施工区lo园go基本要求5施工机祥械1、现名场吊汽运零剪散材缘瑞料需迟要使侵用吊铜装器努具(维吊斗州)吊破运;庆砂浆跌使用遇专用仗吊斗教。2、制作退吊斗可禾采用螺凡纹钢焊凑接,尺驰寸≥15记00启mm见方散,高党度≥100转0mm。3、吊斗皮的吊耳永必须使巧用16号以奖上的门圆钢欲焊接哄,焊浅接采摸取≥300肤mm的间碰断焊萝,一递个吊跃斗需志要设筑置4个吊交耳。4、在荷吊斗阻内侧蒙用竹话胶板骂全封胃闭,敲并在颗钢筋甚处刷坛间隔40膨0m沈m的红排白警行示色床。专用追吊斗散件吊宇斗(示酷意图,猎以说明负文字为假准)第35页共87页5.1百2施工禾升降跪机第一章施工区log怒o基本要求5施工机紧械(1)施勒工升裁降机掠首层新出料季口防袄护棚游同安野全通辛道防声护棚汉。(2)施缓工升逮降机奶楼层荣运料杯平台演应自浮成一套体,宾并与欣结构肯进行淘可靠小有效蒜的连挪接;(3)运院料平惰台按负照图耐示要拜求搭插设。(4)运料裹平台两芒侧应采甘用双道让防护栏烫杆进行属防护,木上栏杆别高120磁0mm,下栏付杆高600板mm。立杆影内侧满常挂绿色庆密目安巷全网,傻下设20栽0m损m高挡剥脚板俊,平摄台下滩方满允挂双垫层水尼平大膨眼网筛。防竞护栏僻杆、案挡脚拘板刷史涂红敌白相翁间警递示色铸。(5)提升额机与升患降机设碧置相同拨。施工桐升降秀机侧脉立面仍示意拔图第36页共87页5.椅13施工升馒降机(取防护门疫)第一章施工区lo记go基本要求5施工旺机械(1)施工板电梯平课台出口棚安装180照0mm高对开阵式防护疑门。防汪护门可椅采用钢麦管和钢陪网焊接瓜而成,批门的下恳沿距平痛台不应运超过100泪mm。(2)防京护门招朝向哄梯笼型一侧给设置公门闩剧或自党动锁掏扣。施工升决降机(俩接料平寄台)防牺护门示膜意图第37页共87页5.1状4施工亿升降仔机(改楼层喉标识锯牌)第一章施工区log欠o基本要求5施工便机械(1)楼层拔标识牌要应用于控外用电芝梯、物毒料提升巾机、建箱筑结构踩内等现赴场。(2)楼层车标识牌产为正方仓形,宽×高=40昆0×4掀00m司m。(3)标识跑牌为蓝裹底白字中,字体猛为黑体陪。(4)内乖楼层邀安全和提示挣牌分落两部锐分组违成,均左侧泼为安赛全小间提示个,右誉侧为拳楼层傅号。内楼刘层安绳全提滔示牌楼层哥标识爹牌第38页共87页5.占15施工升傲降机(听验收牌画)第一章施工区lo讯go基本要求5施工盲机械(1)设置强于施工塑升降机膀首层出桶料口防观护棚内般侧左上勺方。(2)验收地牌尺寸眉不小于16粥00喊×1访20惨0m薪m,验收货牌应包税括:安勤全操作坝规程、呈设备产走权登记竞牌、设呼备使用段登记牌威、操作牙人员操愿作证、挤验收时乐间及其劣它。(3)在京每个指梯笼掀的明电显位偿置,骄悬挂亡限载理标志钢牌。施工升读降机限富载标志组牌施工父电梯泄验收祖牌第39页共87页6.驰2悬挑字式脚编手架第一章施工区lo船go基本要求6脚手牺架(1)钢迎梁截想面尺去寸应耽经设请计计毅算确分定,码不小乓于16号工字典钢;(2)脚堵手架劣钢管麦表面党涂刷范黄色想油漆目,剪朵刀撑映和警拨示带加表面壁涂刷绪红白鞠警示倚漆,提脚手振架内笑侧满耐挂绿办色密向目安窃全网穷,安斧全网县封闭刮严密寄,张遇紧、穿无破狡损,卸颜色染新亮鲜;(3)脚雨手架激架体歉及悬坚挑梁恨固定祝符合伶规范门要求丸,架备体底镜层应烧采用彻硬质发防护欢封闭停,每脑隔3层或10婆m设置一饲道20匙0m台m高警示窝带,固锯定于立迎杆外侧耳,横杆跳露出架习体外立制面长度责为10方0-疼50朋0m劝m。悬挑惜梁U型螺雁栓固呀定示舅意图击(1.木楔子蛮、2.预埋螺海栓)侧立臂面图悬挑工肌字钢钢筋拉把环锚固第40页共87页6.5脚手架湿拉结、奏连墙件第一章施工区lo雨go基本要求6脚手架(1)连保墙件大是承有受脚稳手架颗的荷类载、侮保证若架体将整体品稳定跌的重迎要杆傅件,帮必须财采用绵可承碧受拉贴力和省压力须的构排造。(2)连猜墙件泄应靠领近主休节点健设置题,偏挨离主拍节点肺的距续离不窗应大涂于30序0m混m。(3)对高劲度24子m以上蜘的双痰排脚愈手架骡,应坑采用那刚性闯连墙酱件与束建筑论物连旋接。汇开口带型脚弟手架击的两栗端必源须设厅置连写墙件黄,连捞墙件稼的垂姨直间碰距不滥应大归于建怎筑物嘴的层瞧高,躺并且纵不应围大于4m,水平效距离不伟得超过6m。(4)连扮墙件主设置垫必须盼经过您设计晚计算扫,固陵定方少法应江优先输采用害抱柱觉和预腔埋钢愿管的绳形式训。10018009001800100连墙杆1500洞口1500洞口连墙杆100900150
洞口拉结平面图
洞口拉结剖面图洞口拉结三维效果图第41页共87页6.宁5脚手惧架拉六结、扎连墙舟件第一章施工区lo眨go6脚手割架100180090018001001800≥2001001001500连墙杆连墙杆100900150柱子拉结平面图100
柱子拉结剖面图连墙杆 双扣件柱子拉结三维效果图100900150预埋钢管拉结大样图预埋钢管拉结三维效果图第42页共87页6.6脚手拘架休后息平铺台及充斜道第一章施工区lo事go6脚手愿架700100150015001500180015001500200500150015005001500500700700180015005002001500700180015001500休息平台及斜道均用100×50木枋(平放)上钉18mm厚木胶合板板铺设木质防滑条20×30@300mm 1
下 上 防滑条20×30@300mm
斜道及休息平台均用 木枋上钉模板铺设
1
外架1509001200120010010015001500150015001500100平面图1-1剖面三维效果图第43页共87页6.7卸料平灾台(落艘地式)第一章施工区log妻o基本要求6脚手架(1)平台挺应与结竹构主体毒拉结,迹不得与惨结构外刃架连接欲,平台膀应设纵康、横向塑剪刀撑肠,平台埋上的脚德手板应闯铺严绑刘牢,平线台周围信应设置股不低于1.血5m高防遭护围兰栏,断栏杆勿内侧遍设置牛硬质昌材料然挡板溪,平幕台以还下每枪隔10跌m设置一劈燕道水平腰安全网淋;(2)平岔台应示在明汁显处柏设置目限载同标识偿牌;(3)架伐体刷务黄色祖油漆屯,剪获刀撑丙涂刷何红白呀警示瘦漆。落地式漫卸料平轰台搭设我示意图第44页共87页6.7卸料平池台(悬今挑式)第一章施工区log城o基本要求6脚手站架(1)主顶梁应愚使用堂整根倡槽钢羡(或哪工字跟钢)巴,型北号不队得小旨于[20,锚固什端预埋Φ2愿0U型环;(2)两佳侧应框分别赌设置页前后榨两道殿斜拉有钢丝挺绳,发钢丝姥绳直梳径应虹根据防计算地确定誉且不拘小于Φ21酿.5,每肠个吊氏点的光受力语钢丝波绳应尚独立铲设置冒;(3)平台淡底部应滔满铺脚婶手板,械固定牢盛固,与席外架之耽间封闭刺良好;第45页共87页6.登7卸料平挂台(悬巾挑式)第一章施工区lo牢go基本要求6脚手架(4)临边恶设置不液低于1.寸5m的防荐护栏猴杆,稻栏杆远内侧竖设置亭硬质辉挡板限,挂欺限载肯标识射牌、块警示创牌。第46页共87页6.执8移动式秃作业平勒台第一章施工区log暖o基本要求6脚手付架(1)操作设平台的顾面积不肠宜超过10士㎡,高织度不渴宜超辆过5m。(2)移动袍式操作死平台的俯轮子与还平台的淹接合处蓄应牢固赢可靠,孤立柱底福端离地斤面不超脆过80危mm。(3)操作喉平台可呼采用钢未管以扣奇件连接评,也可留以采用贸门架或游承插式傅钢管脚揪手架部庆件组成盏。平台炕的次梁壮间距不望大于40擦cm;台坚面应宪满铺岁厚的尿木板走。(4)操作很平台四菜周按临烫边要求后设置防链护栏杆销,并布愤置登高机扶梯,拿设置警俩示牌。第47页共87页7.迷1消防回(火焰)栓第一章施工区log滚o7消防手设施(1)消火营栓间距蕉不应大姓于10混0m,消赌防栓它周边非要设咸有防善压、扮防占掌、维掉护措随施;(2)消防求栓处均扣应配齐坏消防箱冲、消防村水带、盟消防水甘枪,消隆防栓应宗配备警右示标志容,夜间辽设置警沿示灯;(3)消防奖临时管笔线铺设绩应有防礼冻措施倾;(4)设置歼室内消产防给水营系统的饼在建工水程,应涝设置消反防水泵善接合器害,消防忘水泵接泛合器应喂设置在鸽室外便样于消防陷车取水渔的部位损,如大拔门口,秤道路两茧边合适鸡的位置紧。7.2消防盗竖管(1)消章防竖臂管的篇管径脾应该慕根据经在建盲工程押临时途消防惕用水壶量、钩竖管市内水凑流计必算速肉度计牧算确仗定,耍且不阅应小碌于DN例10苦0;(2)消防良竖管栓扇口每层踏均应留抵有,配寒齐消防保箱、消捐防水带江(一般2盘,25共m/盘)葬、消熊防水蔽枪2只;(3)多层示消防栓画保护半醉径不应沉大于50m,高层暴消防栓兰辐射面遣不得大炼于30m;(4)在建洽工程高忠度超过100凤m的,方应在刃适当痰楼层雾增设精临时弓中转秀水池穿及加线压水眉泵,城确保杀消防江用水达,超吧高层序二次毁蓄水表池、冈二次堤加压扔应在90m左右躲实施泄,二咱次加当压泵响宜设鸦置自误动启韵动装盗置;(5)消防柜竖管及泊配套设榨施应定转期检查芳、维护森和补充帝、更换难,消防慰水不得普他用。第48页共87页7.爸3消防住器材第一章施工区lo馆go7消防设资施(1)临时盈设施总策面积大圣于12洽00㎡条,至油少设披置一宾处灭季火器早材集腾中点扣。灭木火器脂材集棚中点则要设粘置消悲防水蜂池、创沙箱叼、灭懂火器爱、消满防斧根、消症防锹架、消名防桶纽奉等器斤材。(2)施安工作叛业区浪设置辱定点侮消防寒箱(寸内装团灭火厕器,烂至少2具/箱)隙。作乞业区口不少晶于1个/10招0㎡奥;办奖公区坑、生弃活区惠不少阅于1个/2堵00㎡。换动火作佩业设置赴看火人悉和移动劈燕消防箱扔(或灭它火器)另。消防缩慧箱为红奸色。在主要蹲道路两幻玉侧显目陵位置设忧置消防抗集中点消防咱柜效尊果图第49页共87页第一章施工区log汪o8安全腔标志底、标岛识、栗标语营、彩嚼旗(1)安全标平志、标抽识应在施数工现场辰的作业虑区、加届工区、即生活区腥等醒目骂位置设被置,且煮满足数场量和警状示要求咐。不得易将安全仇标志不愁分部位第、集中旺悬挂。(2)禁止摧标志牌疑、警告胀标志牌址、指令版标志牌锄尺寸均卷为30在0×纯40亿0m趋m,消防晚安全提登示标志血牌尺寸架为350棵×25针0mm;(3)标识斜牌具体蒙作法参青照原标级准(企坊业标识盲识别系悼统)(5)不同毯类型标谱志牌同售时设置缺时,应爽按警告察、禁止偶、指令管、提示平的顺序瞧,先左毁后右,厚先上后泉下的排愁列。基本要求第50页共87页第二背章办公宪区第51页共87页第二章办公区log粥o1办公区(1)材总料:滥彩钢林板活绑动房着;设忧置旗双杆,平旗帜堤以相明应企碧业为茫准。(2)蓝腰悉带:二农层/三惰层走道作外墙制喜作的专录用标语殿,高度纤为1m,底咬色为贴蓝,这文字港反白钢,标找语前风设置麦相应咏企业叠标识摩。内僚容融村入公臂司理肉念等辜及安千全专先用标俗语等旁相关哀内容殖:“固精品掠出自腔精心秧品恩牌源属于人践品雀质量若重于摆泰山瓦诚前信高漆于一录切”蜡、“秋艰苦沿奋斗敢雷厉佳风行洒善打枯硬仗拉协棕作共息赢”忆等。基本要求办公夸室(同楼)泉效果德图1.2办公室逆(楼)第52页共87页第三惩章生活纯区第53页共87页第三章生活区log对o1生活骂区(1)生拴活区谨应统狱筹安傍排,删合理沃布局唉,满束足安遗全、翻消防保、卫税生防已疫、扛环境蜂保护而、防矮汛、身防洪规等要惹求;(2)生活猴区与施蹈工区应萝明确划脸分,实拣施封闭屑管理;(3)生活敬区用房徐应安全春、牢固疲、美观迷,生活毯区临建徐用房的而建筑层饼数不应梦超过3层,被每栋删单层秀建筑沉面积潜不应地大于30缠0㎡。基本要求1
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 家族管理会管理制度
- 应急抢险队管理制度
- 形体舞蹈室管理制度
- 征地办工作管理制度
- 心电图卫生管理制度
- 心里减压室管理制度
- 快递操作工管理制度
- 急救实训室管理制度
- 总经理外派管理制度
- 惠而浦公司管理制度
- 洗染行业消费纠纷处理指南
- GB/T 19995.1-2005天然材料体育场地使用要求及检验方法第1部分:足球场地天然草面层
- GA/T 833-2016机动车号牌图像自动识别技术规范
- 山西省卫生院社区卫生服务中心信息名单目录
- 全民经纪人协议书
- 护理学课件-铺床法
- GB∕T 31062-2014 聚合物多元醇
- 氧、氩、二氧化碳气体充装企业风险点分级管控资料
- 人教版 2021-2022学年 五年级下册数学期末测试试卷(一)含答案
- 西门子SAMA图DEH逻辑讲解
- 国家开放大学《土木工程力学(本)》形考作业1-5参考答案
评论
0/150
提交评论