NATIONALSTANDARD
OFTHEPEOPLESREPUBLICOFCHINA
CodeforEngineeringInstallationAcceptance
ofSteel-makingMechanicalEquipment
GB50403-2007
ChiefDevelopmentDepartment:ChinaMetallurgicalConstructionAssociation
ApprovalDepartment:MinistryofConstructionofthePeoplesRepublicofChina
ImplementationDate:July1,2007
专用
人人文库
ChinaPlanningPress
Beijing2015
图书在版编目(CIP)数据
炼钢机械设备工程安装验收规范英文中国冶金建设协
GB50403-2007:/
会组织编译北京中国计划出版社
.—:,2015.12
ISBN978-7-5182-0292-8
中炼钢设备设备安装工程验收国家标
Ⅰ.①G…Ⅱ.①…Ⅲ.①---
准中国英文
--Ⅳ.①TF31-65
中国版本图书馆数据核字第号
CIP(2015)262085
ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2007
EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2015
byChinaPlanningPress
rd专用
3Floor,CTower,GuohongBuilding
No.A11,Muxidi-Beili,XichengDistrict
Beijing,100038
PrintedinChinabyBeijingJinghuaHucaisPrintingCO.,LTD
Ź2007byMinistryofConstructionof
thePeoplesRepublicofChina
Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor
byanymea人人文库ns,graphic,electronic,ormechanical,includingphotocopying,recording,
oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.
Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,
resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof
blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition
includingthisconditionbeingimposedonthesubsequentpurchaser.
ISBN978-7-5182-0292-8
AnnouncementofMinistryofConstruction
ofthePeoplesRepublicofChina
No.563
AnnouncementofPublishingtheNationalStandardof
CodeforEngineeringInstallationAcceptance
ofSteel-makingMechanicalEquipment
CodeforEngineeringInstallationAcceptanceofSteel-makingMechanicalEquipment
has
beenapprovedasanationalstandardwiththenumberofGB50403-2007andshallbeimplemented
fromJuly1,2007.Articles2.0.4,2.0.14,5.4.5,6.2.1,6.2.2,8.2.4,8.3.2,8.4.4,9.6.5,9.8.1,
9.9.1,9.9.2,10.4.1,10.5.1,11.5.1,11.8.1,11.8.2,13.4.2,15.2.1,15.7.1,16.5.1,18.4.1,
18.4.2and21.1.5hereinaremandatoryprovisionsandmustbeenforcedstrictly.
AuthorizedbyResearchInstituteofStandards&NormsofM专用inistryofConstructionofthe
PeoplesRepublicofChina,thisCodeispublishedanddistributedbyChinaPlanningPress.
MinistryofConstructionofthePeoplesRepublicofChina
January24,2007
人人文库
Foreword
MeasuresforManagementofNationalStandardsfor
Accordingtotherequirementof
EngineeringConstruction
andthatofJianBiaoHan[2005]No.124issuedbyformerMinistryof
Construction-"NoticeonPrintingtheDevelopmentandRevisionPlanofNationalEngineering
ConstructionStandardsin2005(secondbatch)",thisCodeisherebyestablishedbyChinaFirst
MetallurgicalGroupCo.,Ltd.jointlywithrelatedcompaniesundertheorganizationofChina
MetallurgicalConstructionAssociation.
DuringestablishmentoftheCode,thepreparationgrouphasstudiedrelatedcurrentnational
laws,regulationsandstandards;madeextensiveandin-depthinvestigation;concludedmanyyears
experienceintheinstallationacceptanceofsteel-makingmechanicalequipment;widelysoughtthe
advicesfromrelatedcompaniesandexperts;repeatedlydiscussed,revisedandenhancedthe
provisionsoftheCode;andfinalizedthistextuponreview.
TheCodeconsistsof21chaptersasfollows:generalprovisions,basicrequirements,equipment
foundation,foundationboltandbaseplate,equipmentandmateria专用lmobilization,installationof
converter,installationofoxygenlanceandsublance,installationofhood,installationofwasteheat
boiler(vapourizationcoolingdevice),installationofelectricarcfurnace,installationofladlerefining
furnace(LF),installationofvacuumladlerefiningfurnace(VD)andvacuumoxygen
decarburizationconverter(VOD),installationofrecirculationvacuumdegassingrefiningfurnace
(RH),installationofargonoxygendecarburizationrefiningfurnace(AOD),installationofcasting
equipment,installationofcontinuoussteel-castingequipment,installationofdischargingand
finishingequipment,installationofhotmetalmixer,installationofhotmetalpretreatment
equipment,installationofrawmaterialsystem,installationofgaspurification;testrunof
mechanicalsteel-making,andsixappendixes.Chapters5to20arethesub-unitworksofinstallation
ofsteel-makingmechanicalequipment,whilethecontentsofthearticlesofChapterthree
"EquipmentFoundation,FoundationBoltandBasePlate"andChapterfour"Equipmentand
MaterialMobilization"involvesvarioussubdivisionalworksandaretheelementsforqualitycontrol
commonlyapplicabletovarioussubdivisionalworks.Therefore,theyarepreparedasseparate
chapters.
Theprovision人人文库sinboldfaceinthisCodearemandatory,andshallbestrictlyimplemented.
MinistryofConstructionisresponsibleformanagingtheCodeandexplainingthemandatory
provisions,andChinaFirstMetallurgicalGroupCo.,Ltd.isresponsibleforexplainingthespecific
technicalcontents.Allrelatedcompaniesarekindlyrequestedtosumupandaccumulate
experiencesinactualpracticesduringtheprocessofimplementingthisCode.Therelevantopinions
andadvice,whenevernecessary,canbepostedorpassedontoChinaFirstMetallurgicalGroup
Co.,Ltd.(address:No.3GongyeAvenue,QingshanDistrict,Wuhancity,Hubeiprovince;Zip
code:430081;E-mail:jisc@orxiaolw@;Faxforreferencein
caseoffuturerevisionofthisCode.
ChiefDevelopmentOrganization,ParticipatingDevelopmentOrganizationsandChiefDraftingStaff:
·1·
ChiefDevelomentOranization
pg:
ChinaFirstMetallurgicalGroupCo.,Ltd.
ParticiatinDevelomentOranizations
pgpg:
ChinaThirteenthMetallurgicalGroupCo.,Ltd.
ChinaTwentiethMetallurgicalGroupCo.,Ltd.
ChiefDraftinStaff
g:
ZouYichangCaiXiaoboTuLichengYuanYuchengAiQingzhu
GuoYankunZhengGuoqiangGongMinXiaoLiwenJinDewe
LiShaoxiangZhangLi
专用
人人文库
·2·
Contents
……………
1GeneralProvisions(1)
……………
2BasicRequirements(2)
…………………
3EquipmentFoundation,FoundationBoltandBasePlate(6)
…………
3.1GeneralRequirements(6)
…………
3.2EquipmentFoundation(6)
………………
3.3FoundationBolt(6)
……………………
3.4BasePlate(7)
………
4EquipmentandMaterialMobilization(8)
…………
4.1GeneralRequirements(8)
……………………
4.2Equipment(8)
…………………
4.3RawMaterials(8)
……………………
5InstallationofConverter(9)
…………
5.1GeneralRequirements(9)
……………………
5.2TrunnionBearinPedestal专用
g(9)
…………………
5.3BackingRing(10)
…………………
5.4FurnaceBody(11)
…………………
5.5TiltingDevice(13)
…………………
5.6RemovableGuardBoardandFixedGuardBoard(14)
…………………
6InstallationofOxygenLanceandSublance(16)
…………
6.1GeneralRequirements(16)
………
6.2OxygenLance,SublanceandLiftingDevice(16)
…………
6.3Crosstravellingdevice(17)
………………
6.4RotatingDevice(18)
………………………
6.5NitrogenSealingDevice(19)
……………………
6.6ProbeMountingMachineandPullingMachine(20)
…………
7InstallationofHood(21)
…………
7.1GeneralRequirements(21)
…………………………
7.2Skirt人人文库(21)
………………
7.3RemovableHood(22)
…………
8InstallationofWasteHeatBoiler(VaporizationCoolingDevice)(23)
…………
8.1GeneralRequirements(23)
…………………………
8.2Flue(23)
…………………
8.3BoilerBarrel(24)
……………
8.4PipingforSteamandWaterSystems(25)
……………
8.5HeatAccumulator(26)
………………………
8.6DeoxidizationWaterTank(26)
…………
9InstallationofElectricArcFurnace(28)
·1·
…………
9.1GeneralRequirements(28)
……………………
9.2RailChair(28)
………………………
9.3Cradle(29)
…………………
9.4TiltingDevice(30)
…………
9.5TiltingLockingDevice(30)
…………………
9.6FurnaceBody(31)
………………
9.7FurnaceCover,ElectrodeRotatingMechanismandFurnaceCoverLiftingMechanism(32)
…………………
9.8ElectrodeLiftingMechanismandElectrodeClampingMechanism(33)
…………………
9.9OxygenLance(34)
………………
10InstallationofLadleRefiningFurnace(LF)(35)
…………
10.1GeneralRequirements(35)
………………………
10.2TrackforBuggyLadle(35)
…………………
10.3BuggyLadle(35)
……………
10.4FurnaceCoverandFurnaceCoverLiftingMechanism(36)
…………………
10.5ElectrodeLiftingMechanismandElectrodeClampingMechanism(36)
……………
10.6ArgonGasStirrer(37)
……………………
10.7TemperatureMeasuringandSamplingDevice(37)
11InstallationofVacuumLadleRefiningFurnace(VD)andVacuumOxygen
………………专用…………
DecarburizationConverter(VOD)(39)
…………
11.1GeneralRequirements(39)
………………
11.2VacuumTank(39)
…………………
11.3TrackforVacuumTankCar(40)
……………
11.4VacuumTankCar(40)
……………
11.5VacuumTankCapandTankCapLiftingMechanism(40)
……………………
11.6TemperatureMeasuringandSamplingDevice(41)
………………
11.7VacuumDevice(41)
………………
11.8OxygenLance(VacuumOxygenDecarburizationConverter(VOD))(41)
………………
12InstallationofRecirculationVacuumDegassingRefiningFurnace(RH)(43)
…………
12.1GeneralRequirements(43)
………………………
12.2TrackforBuggyLadle(43)
…………………
12.3BuggyLadle(43)
……………………
12.4TrackforVacuumDegassingChamberCar(43)
…………
12.5VacuumDega人人文库ssingChamberandDegassingChamberCar(43)
………………
12.6VacuumDevice(44)
…………
12.7LadleLiftingDevice(44)
………………
12.8PreheatingDeviceforVacuumDegassingChamber(45)
………………
13InstallationofArgonOxygenDecarburizationRefiningFurnace(AOD)(46)
…………
13.1GeneralRequirements(46)
……………………
13.2TrunnionBearingPedestal(46)
…………………
13.3BackingRing(46)
………………
13.4FurnaceBody(46)
………………
13.5TiltingDevice(46)
·2·
…………………
13.6RemovableGuardBoardandFixedGuardBoard(47)
…………
14InstallationofCastingEquipment(48)
…………
14.1GeneralRequirements(48)
…………………
14.2LadleTurret(48)
………………………
14.3TundishCarandTrack(49)
………………………
14.4Roaster(49)
………
15InstallationofContinuousSteel-castingEquipment(50)
…………
15.1GeneralRequirements(50)
……………………
15.2MoldandVibratingDevice(50)
……………………
15.3SecondaryCoolingDevice(51)
…………………
15.4ExchangeDeviceforSegment(53)
……………
15.5WithdrawalandStraighteningUnit(54)
…
15.6DummyBarReceivingandSendingDeviceandDummyBarDisconnectingDevice(56)
………………………
15.7FlameCuttingMachine(58)
………………
15.8RockingShear(59)
………………………
15.9CropCollectingDevice(59)
……………
15.10BurringMachine(60)
……
16InstallationofDischargingandFinishingEquipment(61)
………………专用…………
16.1GeneralRequirements(61)
………………………
16.2ConveyingRollerTable(61)
……………………
16.3Turntable(61)
………………………
16.4Pusher,PullerandTilter(62)
………………………
16.5Scarfer(63)
………
16.6LiftingGuardBoardandMarkingPunch(64)
………………………
16.7CrossTravellingTrolley(65)
……………
16.8CenteringDevice(65)
……………
17InstallationofHotMetalMixer(67)
…………
17.1GeneralRequirements(67)
………………
17.2BaseandRace(67)
………………
17.3FurnaceShellandTensionSleeve(68)
………………
17.4TiltingDevice(69)
……………………
17.5CoverManipulatingWinch(70)
………
18Installationof人人文库HotMetalPretreatmentEquipment(71)
…………
18.1GeneralRequirements(71)
………………
18.2Desulfurizer(Dephosphorizer)ConveyingDevice(71)
……………
18.3StirringDesulfurizationEquipment(72)
…………………
18.4DephosphorizationSprayGun(73)
…………
18.5MoltenIronTankCar(73)
………………
18.6TrackforMoltenIronTankCar(74)
………………
18.7SlagRemover(74)
………
19InstallationofRawMaterialSystem(75)
…………
19.1GeneralRequirements(75)
·3·
……………
19.2WeighingFunnel(75)
…………
19.3CollectingFunnelandRotatingFunnel(75)
……………………
20InstallationofGasPurificationDevice(76)
…………
20.1GeneralRequirements(76)
………………………
20.2GasPurificationDevice(76)
………
21TestRunofSteel-makingMechanicalEquipment(77)
…………
21.1GeneralRequirements(77)
………………………
21.2TestRunofConverter(77)
………
21.3TestRunofOxygenLanceandSublance(78)
……………
21.4TestRunofHood(78)
…………
21.5TestRunofWasteHeatBoilerSystem(78)
………………
21.6TestRunofElectricArcFurnace(79)
………
21.7TestRunofLadleRefiningFurnace(LF)(79)
21.8TestRunofVacuumLadleRefiningFurnace(VD)andVacuumOxygen
………………
DecarburizationConverter(VOD)(80)
……………
21.9TestRunofRecirculationVacuumDegassingRefiningFurnace(RH)(80)
……………
21.10TestRunofArgonOxygenDecarburizationRefiningFurnace(AOD)(80)
………………
21.11TestRunofCastingEquipment(81)
………………
21.12TestRunofContinuousSteel-castingEquipment专用(81)
………………
21.13TestRunofDiachargingandFinishingEquipment(81)
………………
21.14TestRunofHotMetalMixer(82)
………………
21.15TestRunofHotMetalPretreatmentEquipment(82)
AppendixARecordofQualityAcceptanceforSubdivisionalWorksofInstallation
…………
ofSteel-makingMechanicalEquipment(84)
AppendixBRecordofQualityAcceptanceforSub-unitWorksofInstallation
…………
ofSteel-makingMechanicalEquipment(85)
AppendixCRecordofQualityAcceptanceforUnitWorksofInstallation
…………
ofSteel-makingMechanicalEquipment(86)
………
AppendixDRecordofNo-loadTestrunofSteel-makingMechanicalEquipment(89)
………
AppendixECriteriaforAppearanceQualityofWeld(90)
……
AppendixFPostweldHeatTreatmentofWeldedJoint(91)
……………
ExplanationofWordinginThisCode(92)
……………
Addition:Explanat人人文库ionofProvisions(93)
·4·
1GeneralProvisions
1.0.1
Inordertostrengthenthemanagementofinstallationqualityofsteel-makingmechanical
equipment,unifythestandardfortheacceptanceofengineeringinstallationqualityandensurethe
engineeringquality,thisCodeisherebyestablished.
1.0.2
TheCodeshallbeapplicabletotheengineeringinstallationqualityacceptanceofconverter,
electricarcfurnace,secondaryrefiningequipment,continuoussteel-castingmechanicalequipment
andauxiliarysteel-makingmechanicalequipment,etc.
1.0.3
Therequirementforinstallationqualityintheengineeringtechnicaldocumentsandthe
contracttobeappliedduringtheinstallationofsteel-makingmechanicalequipmentshallnotbe
lowerthanthatinthisCode.
1.0.4
Duringtheinstallationqualityacceptanceofsteel-makingmechanicalequipment,notonly
theregulationsofthisCodebutalsothoseoftherelatedcurrentnationalstandardsshallbe
compliedwith.专用
人人文库
·1·
2BasicRequirements
2.0.1
Theconstructioncontractorforinstallationofsteel-makingmechanicalequipmentshallbe
qualifiedtoundertaketheconstructionofthiskindofworks.Theconstructionsiteshallbe
providedwithcorrespondingconstructiontechnicalstandards,completequalitymanagementsystem
andqualitycontrolandinspectionsystemsaswellassuchtechnicaldocumentsapprovedbythe
technicaldirectoroftheprojectasconstructionorganizationplan,methodstatementand
constructiondesign.
2.0.2
Incaseofrevisionofconstructiondrawings,thedesignchangenoticefromthedesign
contractorortechnicalconfirmationattestationshallbeacquiredinadvance.
2.0.3
Incaseofinspectionandacceptanceofengineeringinstallationqualityofsteel-makingmechanical
equipment,themeasuringinstrumenttobeusedmustbeverifiedandcalibratedasqualified.
2.0.4Thewelderresponsibleforweldingworkduringtheinstallationofsteel-makingmechanical
equipmentmustpasstherelatedexaminationandacquirethecorrespondingcertificate,andonlycarry
outweldingwithinthescopespecifiedandapprovedbytheaboveexaminationhe/shepassed.
2.0.5专用
Theinstallationofsteel-makingmechanicalequipmentshallbecarriedoutandhandedover
amongvariousspecialtieswithrecordaccordingtospecifiedprocedures.Thequalitycontrolshallbe
carriedouttoeachworkingprocedureaccordingtotheconstructiontechnicalstandard,andafter
completionofeachworkingprocedure,thequalityshallbeinspectedwithrecord.Iftheprevious
procedurehasnotpassedinspection,thefollowingprocedurecannotbecarriedout.
2.0.6
Incaseofsecondarygroutingandotherconcealedworksofequipmentduringinstallationof
steel-makingmechanicalequipment,theconstructioncontractorshallinformrelatedcontractorsto
carryoutacceptanceandpreparetheacceptancedocumentaccordinglypriortotheconcealedwork.
2.0.7
Theengineeringinstallationqualityacceptanceofsteel-makingmechanicalequipmentshall
beperformedonthebasisoftheselfinspectionofconstructioncontractoraswellassubdivisional
works,sub-unitworksandunitworks.Thesub-unitworksandsubdivisionalworksshouldbe
dividedaccordingtotherequirementofTable2.0.7.Theunitworkscanbedividedintothe
followingcontentsbasedonprocesssystems:installationofmechanicalconverter,electricarc
furnace,ladlerefiningfurnace(LF),vacuumladlerefiningfurnace(VD),vacuumoxygen
decarburizationco人人文库nverter(VOD),recirculationvacuumdegassingrefiningfurnace(RH),argon
oxygendecarburizationrefiningfurnace(AOD)andcontinuoussteel-castingmechanical
equipment.
Table2.0.7Divisionofsub-unitworksandsubdivisionalworksofsteel-makingmechanicalequipmentinstallation
No.Sub-unitworksSubdivisionalworks
Trunnionbearingpedestal,backingring,furnacebody,tiltingdevice,removableguard
1Converter
boardandfixedguardboard
Liftingdevice,crosstravellingdevice,rotatingdevice,nitrogensealingdevice,probe
2Oxygenlanceandsublance
mountingmachineandprobepullingmachine
3HoodSkirt,removablehood
·2·
Table2.0.7(Continued)
No.Sub-unitworksSubdivisionalworks
WasteheatboilerFlue,boilerbarrel,pipingforsteamandwatersystem,heataccumulatorand
4
(vapourizationcoolingdevice)deoxidizationwatertank
Railchair,cradle,tiltingdevice,tiltinglockingdevice,furnacebody,furnacecover,
5Electricarcfurnaceelectroderotatingmechanismandfurnacecoverliftingmechanism,electrodelifting
mechanismandelectrodeclampingmechanism,andoxygenlance
Trackforbuggyladle,buggyladle,furnacecoveranditsliftingmechanism,electrode
6Ladlerefiningfurnace(LF)liftingandclampingmechanism,argongasstirrer,andtemperaturemeasuringand
samplingdevice
VacuumladlerefiningVacuumtank,trackforvacuumtankcar,vacuumtankcar,vacuumtankcapandtank
7
furnace(VD)capliftingmechanism,temperaturemeasuringandsamplingdeviceandvacuumdevice
Vacuumtank,trackforvacuumtankcar,vacuumtankcar,vacuumtankcapandtank
Vacuumoxygendecarburization
8capliftingmechanism,temperaturemeasuringandsamplingdeviceandvacuumdevice,and
converter(VOD)
oxygenlance
Trackforbuggyladle,buggyladle,trackforvacuumdegassingchambercar,vacuum
RecirculationVacuumDegassing
9degassingchamberanddegassingchambercar,vacuumdevice,ladleliftingdevice,and
RefiningFurnace(RH)
preheatingdeviceforvacuumdegassingchamber
ArgonoxygendecarburizationTrunnionbearingpedestal,backingring,furnacebody,tiltingdevice,removableguard
10专用
refiningfurnace(AOD)boardandfixedguardboard
11CastingequipmentLadleturret,tundishcarandtrack,androaster
Moldandvibratingdevice,secondarycoolingdevice,exchangedeviceforsegment,
Continuoussteel-casting
12withdrawalandstraighteningunit,dummybarreceiving,sendinganddisconnectingdevice,
equipment
flamecuttingmachine,pendulumshear,cropcollectingdeviceandburringmachine
DischargingandfinishingRun-outrollertable,turntable,pusher,puller,tilter,scarfer,liftingguardboard,
13
equipmentmarkingpunch,crosstravellingtrolley,andcenteringdevice
Baseandrollertable,furnaceshellandtensionsleeve,tiltingdevice,andcover
14Hotmetalmixer
manipulatingwinch
Desulfurizer(dephosphorizer)conveyingdevice,stirringdesulfurizationequipment,
Hotmetalpretreatment
15desulfuringspraygun,moltenirontankcar,trackformoltenirontankcar,andslag
equipment
remover
16RawmaterialsystemWeighingfunnel,collectingfunnelandrotatingfunnel
Venturitube,flat-bottomcyclone,spraytower,dehydrator,three-wayvalveandwater
17Gaspurificationdevice
人人文库seal
18Otherequipment
2.0.8
Incaseofacceptance,thequalityofsubdivisionalworksshallconformtothefollowing
requirements:
1
Duringinspection,thedominantitemsshallcomplywiththequalityrequirementsofthe
Code.
2
TheinspectionresultsofgeneralitemsshallmeettherequirementsoftheCode
completely.
3
Thequalityacceptancerecordandthequalitycertificationshallbecomplete.
2.0.9
Duringacceptance,thequalityofsub-unitworksshallconformtothefollowing
·3·
requirements:
1
Thequalityofallsubdivisionalworksofsub-unitworksshallpasstheacceptance.
2
Thedataforqualitycontrolshallbecomplete.
3
Theno-loadtestrunofsingleequipmentshallbequalified.
2.0.10
Incaseofacceptance,thequalityofunitworksshallconformtothefollowingrequirements:
1
Thequalityofallsub-unitworksoftheunitworksshallpasstheacceptance.
2
Thedataforqualitycontrolshallbecomplete.
3
Theno-loadcombinedtestrunofequipmentshallbequalified.
4
Theappearancequalityshallpasstheacceptance.
2.0.11
Incaseofacceptance,theappearancequalityinspectionitemsoftheunitworksshall
conformtothefollowingrequirements:
1
Connectingbolts:Thebolts,nutsandwashersshallbefullyequippedaccordingtothe
design.Afterfastened,theboltshallbewiththeexposednutorflushedwiththenut.Theexposed
threadshallbefreeofdamageandthepenetratingdirectionofthreadshallbeconsistentunless
otherwiselimitedbythestructuralreasons.
2
Sealingconditions:Freeofobviousoil,waterorgasleakage.
3
Pipelaying:Reasonablelayoutandorderlyarrangement.
4
Soundinsulationandthermalinsulatingmateriallaying:Un专用iformthickness,solidbound,
relativelysmoothsurface.
5
Coveringwithpaint:Uniformcoating,freeofholiday,scaling,obviouswrinkledskinorgas
bubble,basicallyconsistentcolor.
6
Walkingboard,ladderandrail:Firmlyfastenedandfreeofobviousappearancedefects.
7
Welds:Withrelativelyuniformweldripples,andweldingslagandspatterhasbeen
basicallycleanedup.
8
Notches:Freeofslag.
9
Protectionoffinishedproducts:Theequipmentisfreeofdefectandtheexposedmachined
surfaceshallbewellprotected.
10
Civilizedconstruction:Theconstructionsiteshallbeorderlyunderthemanagement,and
noconstructionwasteshallbefoundaroundtheequipment.Theaboveitemsshallberandomly
inspectedwithatleasttenpointstobeinspected.
2.0.12
Theacceptancerecordsforinstallationqualityofsteel-makingmechanicalequipmentshall
conformtothefollowingrequirements:
1
Thequalit人人文库yacceptanceofsubdivisionalworksshallberecordedaccordingtoAppendixAof
theCode.
2
Thequalityacceptanceofsub-unitworksshallberecordedaccordingtoAppendixBofthe
Code.
3
ThequalityacceptanceofunitworksshallberecordedaccordingtoAppendixCofthe
Code.
4
Theno-loadtestrunofequipmentshallberecordedaccordingtoAppendixDoftheCode.
2.0.13
Incasethequalityofworksdoesnotconformtotherequirement,theworksshallbenot
onlyimmediatelydealtwithorreworked,butalsosubjecttoacceptanceoveragain.
2.0.14Asfortheworkswhosequalitydoesnotconformtotherequirementandstillcannotmeetthe
·4·
safeuserequirementaftertreatmentorrework,theacceptancemustnotbeperformedtoit.
2.0.15
Theacceptanceforinstallationqualityofsteel-makingmechanicalequipmentshallbe
carriedoutaccordingtothefollowingprocedures:
1
Theacceptanceofsubdivisionalworksshallbecarriedoutbythespecializedtechnical
director(foreman)andqualityinspectoroftheconstructioncontractorundertheorganizationof
theconsultingengineer(theprojecttechnicaldirectoroftheowner).
2
Theacceptanceofsub-unitworksshallbecarriedoutbytheproject,technicalandquality
directorsoftheconstructioncontractorundertheorganizationofthechiefconsultingengineer(the
projectdirectoroftheowner).
3
Aftercompletionoftheunitworks,theconstructioncontractorshallorganizerelated
personneltoconductinspectionandassessmentbyitselfandsubmittheacceptancereporttothe
owner.
4
Aftertheownerreceivestheacceptancereport,its(project)directorshallorganizethe
personsinchargeofconstructioncontractor,designcompanyandconsultantcompanytocarryout
theacceptancetotheunitworks.
5
Incaseofsubcontractorsparticipatingintheconstructionofunitworks,thegeneral
contractorshallbefullyresponsiblefortheworksquality,whilethesubcontractorsshallbe
responsiblefortheinspectionandassessmentoftheworksunderth专用echargeofthemaccordingto
theproceduresspecifiedintheCodewiththeabsenceofthegeneralcontractorspersonnel.After
completionofsubcontractedworks,therelateddatashallbesubmittedtothegeneralcontractor.
人人文库
·5·
3EquipmentFoundation,FoundationBoltandBasePlate
3.1GeneralRequirements
3.1.1
Thischaptershallbeapplicabletotheacceptanceofinstallationqualityofthefoundation,
foundationboltandbaseplateofsteel-makingmechanicalequipment.
3.1.2
Priortoinstallationofequipment,thefoundationshallbeinspectedforacceptance.Incase
ofacceptancefailure,theequipmentmustnotbeinstalled.
3.1.3
Thefoundationformainsteel-makingmechanicalequipmentshallbesubjecttosettlement
surveywithrecordsbeingmade.
3.2EquipmentFoundation
ⅠDominantItems
3.2.1
Thestrengthofequipmentfoundationshallconformtotherequirementsofthedesign
technicaldocument.Quantitytobechecked:100%.Inspectionmethod:inspectthedatafor
foundationhandover.
3.2.2专用
Beforetheequipmentisinplace,thearrangementofcenterlabelboardandelevation
benchmarkshallbepreparedinaccordancewiththeconstructiondrawingandsurveyingcontrol
network;thecenterlabelboardandelevationbenchmarkshallbesetaccordingtotheabove
arrangement,andfinallytheshaftplumbingshallbeperformed.Permanentcenterlabelboardand
elevationbenchmarkshallbeburiedformainequipmentandcontinuousproductionline.
Quantitytobechecked:100%.
Inspectionmethod:Checkthelistofsurveyingresultsandcarryoutsurvey.
ⅡGeneralItems
3.2.3
Theaxisposition,elevationanddimensionofequipmentfoundationandthelocationof
foundationboltshallconformtorelatedrequirementsofthedesigntechnicaldocumentorthoseof
GeneralCodeforConstructionandAcceptanceofMechanical
currentnationalstandardof
EquipmentInstallationEngineering
(GB50231).
Quantitytobechecked:100%.
Inspectionmethod:Checkthere-inspectionrecord.
3.2.4
Thegreas人人文库ydirt,brokenstones,soilandwatershallberemovedfromthesurfaceof
equipmentfoundationandthepreparedholesforfoundationbolts,andtheembeddedthreadand
nutsoffoundationboltsshallbewellprotected.
Quantitytobechecked:100%.
Inspectionmethod:Observe.
3.3FoundationBolt
ⅠDominantItems
3.3.1
Thespecificationsandfasteningoffoundationboltsshallcomplywiththerequirementsof
thedesigntechnicaldocument.
·6·
Quantitytobechecked:Randomlycheck20%(notlessthanfourpieces).
Inspectionmethod:Checkthequalitycertification,measurebyaruler,checkthefastening
recordandcheckthemviahammeringnuts.
ⅡGeneralItems
3.3.2
Theoilstainandscaleonfoundationboltsshallbecleanedupandthethreadofthemshall
beproperlyappliedwithgrease.
Quantitytobechecked:100%.
Inspectionmethod:Observe.
3.3.3
Thefoundationboltstobeinstalledinthepreparedholesshallbesetvertically,andany
partofthemshallbemorethan15mmawayfromthewallofthecorrespondingholesandkeepclear
ofthebottomofthecorrespondingholes.
Quantitytobechecked:100%.
Inspectionmethod:Observe.
3.4BasePlate
ⅠDominantItems
3.4.1
Baseplateshallbesetwiththebed-mortarmethod,the48hstrengthofbed-mortar
concreteshallbeuptothedesignstrengthoffoundationconcrete.
:专用
QuantitytobecheckedCheckbatchbybatch.
Inspectionmethod:Checkthereportforstrengthtestofbedmortartestblock.
ⅡGeneralItems
3.4.2
Thebaseplateforequipmentshallbesetaccordingtorelatedrequirementsofthedesign
GeneralCodeforConstructionandAcceptance
technicaldocumentorthecurrentnationalstandard
ofMechanicalEquipmentInstallationEngineering
(GB50231).
Quantitytobechecked:Randomlycheck20%.
Inspectionmethod:Observe,measurebyaruler,checkwithafeelergaugeandmanuallytap
thebaseplate.
3.4.3
Incasethebaseplateismountedviagrinding,thesurfaceofconcretefoundationshallbe
flatlychippedsoastomakethecontactpointsbetweenthebaseplateandtheconcretesurface
evenlydistributed.
Quantitytobechecked:Randomlycheck20%.
Inspectionme人人文库thod:Observe.
·7·
4EquipmentandMaterialMobilization
4.1GeneralRequirements
4.1.1
Thischaptershallbeapplicabletotheacceptanceofequipmentandmaterialmobilization
forinstallationofsteel-makingmechanicalequipment.
4.1.2
Incaseofequipmenthandlingandlifting,theliftingpointshallbethepositionmarkedon
theequipmentoritspackingcase,andprotectivemeasuresshallbetakentopreventtheequipment
frombeingdamagedduetoimproperhandlingorlifting.
4.1.3
Priortoinstallationofequipment,itshallbesubjecttounpackinginspectionwithrecords
accordingly.Theequipmentshallbeprotectedafterunpackinginspectionandthentimelyinstalled.
4.1.4
Afterenteringthesite,therawmaterialsshallbestackedorderlyaccordingtotheirspecifications
andalsoprotectedfrombeingdamaged.
4.2Equipment
DominantItems
4.2.1
,,专用
Themodelspecificationsqualityandquantityofequipmentshallcomplywiththe
requirementsofthedesigntechnicaldocument.
Quantitytobechecked:100%.
Inspectionmethod:Observe,andcheckthequalitycertificationdocumentsoftheequipment.
4.3RawMaterials
DominantItems
4.3.1
Themodel,specifications,quality,quantityandperformanceofrawmaterialsandstandard
elementsshallconformtotherequirementsofthedesigntechnicaldocumentorrelatedcurrent
nationalproductstandards.Incaseofmobilization,acceptanceshallbeperformedwith
correspondingrecord.
Quantitytobechecked:Checkallofqualitycertificationdocuments.Randomlycheck1%of
actualproducts(notlessthanfivepieces).Ifrepeattestisrequiredinthedesigntechnical
documentorrelatednationalstandards,itisrequiredtoperformrepeattest.
Inspectionme人人文库thod:Checkthequalitycertificationdocuments,repeattestrecordandacceptance
record;carryoutappearanceinspectionoractualmeasurement.
·8·
5InstallationofConverter
5.1GeneralRequirements
5.1.1
Thischaptershallbeapplicabletothequalityacceptancefortheinstallationofconverter
withthenominalcapacityof100-300t.
5.2TrunnionBearingPedestal
GeneralItems
5.2.1
Theallowabledeviationforinstallationoftrunnionbearingpedestalshallcomplywiththe
requirementsinTable5.2.1(seeFigure5.2.1).
Quantitytobechecked:100%.
Inspectionmethod:SeeTable5.2.1.
Table5.2.1Allowabledeviationforinstallationoftrunnionbearingpedestal
ItemAllowabledeviation(mm)Inspectionmethod
Elevation±5专用.0Opticalinstrument
Measurebyaruler
Longitudinalandhorizontalcenterlinesofbearingpedestalatfixedend1.0
andplumbwire
Longitudinalandhorizontalcenterlinesofbearingpedestalatmovableend
Measurebyaruler
(thedeviationdirectionshallbeconsistentwiththatofthecenter1.0
andplumbwire
linesofbearingpedestalatfixedend)
Centerdistanceoftwobearingpedestals±1.0
Tapelineandcounter-
balanceindicator
Diagonalrelativeerroroftwobearingpedestals4.0
Heightdifferenceoftwobearingpedestals1.0Opticalinstrument
Longitudinallevelness0.10/1000
Horizontallevelness(fixed)
0.20/1000
(thesideclosetofurnacebodyshouldbelower)
人人文库Leveler
Horizontallevelness(articulated)
0.10/1000
(thesideclosetofurnacebodyshouldbelower)
Localclearancebetweenbearingpedestal
0.05Feelergauge
(orbearingsupport)andtaperedwedges
Shallconformtorelatedrequirementsofcurrent
GeneralCodeforConstructionand
nationalstandardof
BearingassemblyAcceptanceofMechanicalEquipmentInstallation
Engineering
(GB50231)
·9·
Figure5.2.1Schematicdrawingforinstallationoftrunnionbearingpedestal
1,2-bearingsupport;3-bearingpedestalatmovableend;
4-centerlineofconverter;5-longitudinalcenterlineofbearingpedestalatfixedend;
6-horizontalcenterlineofbearingpedestal;7-bearingpedestalatfixedend
5.3BackingRing
ⅠDominantItems
5.3.1
Incaseofweldingforassemblyofbackingring,theweldingprocedurequalification(WPQ)
shallbecarriedoutwithreport,basedonwhichtheweldingprocedur专用eandtheoperationinstruction
forweldingshallbedeterminedorprepared.
Quantitytobechecked:100%.
Inspectionmethod:CheckWPQreportandtheoperationinstructionforwelding.
5.3.2
Theinternalqualityofbuttweldsincaseoftheassemblyofbackingringshallcomplywith
therequirementofthedesigntechnicaldocument,orthatofGradeⅢofweldqualitygrading
ConstructionandAcceptanceCodeforWeldingWorkofFieldEquipmentand
criteriaof
IndustrialPipeline
(GB50236)incaseofnorequirementintheabovedocument.
Quantitytobechecked:100%.
Inspectionmethod:Checktheultrasonicinspectionrecord.
5.3.3
Theappearancequantityofbuttweldsincaseofbackingringassemblyshallmeetthe
requirementofthedesigntechnicaldocument,orthatofAppendixEoftheCodeincaseofno
requirementintheabovedocument.
Quantitytobechecked:100%.
Inspectionmethod:Observeorcheckwithamagnifier.
5.3.4
Thepostw人人文库eldheattreatmentofbuttweldsincaseofbackingringassemblyshallmeetthe
requirementofthedesigntechnicaldocument,orthatofAppendixFoftheCodeincaseofno
requirementintheabovedocument.
Quantitytobechecked:100%.
Inspectionmethod:Observeandchecktherecordofheattreatment.
5.3.5
Thetighteningforcefortheboltsofbackingringconnectedwithflangesshallcomplywith
therequirementofthedesigntechnicaldocument.
Quantitytobechecked:100%.
Inspectionmethod:Observeatsite,checkwithatorquewrench,andcheckthetightening
record.
·10·
5.3.6工
The-shapedkeyforbackingringconnectedwithflangesshallbeassembledaccordingto
therequirementofthedesigntechnicaldocument.
Quantitytobechecked:100%.
Inspectionmethod:Measurebyafeelergaugeandamicrometer.
5.3.7
Thewater-cooledbackingringshallbesubjecttohydrostatictestandflushingtestaccordingto
therequirementofthedesigntechnicaldocument.Incaseofnorelatedrequirementintheabovedocument,
thetestshallmeetthefollowingrequirements:thetestpressureshallbe1.25timesofdesignpressure;
boosterthepressureuptothetestpressureandholdfor10min,andthenlowerittotheworking
pressureandholdfor30min.Thetestisqualifiedifthereisnoleakageandpressurefall.Incaseof
flushingtest,thewatershallbeabletoflowinandoutsmoothlyandfreelyforatleast24h,without
anyleakage.
Quantitytobechecked:100%.
Inspectionmethod:Observe,andchecktherecordsforpressuretestandflushingtest.
ⅡGeneralItems
5.3.8
Theallowabledeviationforassemblydimensionsofbackingringshallcomplywiththe
requirementsinTable5.3.8.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable5.3.8.
Table5.3.8Allowabledeviationforassemblyofbacki专用ngring
Allowable
ItemInspectionmethod
deviation(mm)
Coaxialityoftwotrunnionsofweldedbackingring(withtheCheckwithalaseralignerora
1.50
axisoftrunnionattransmissionsideasthedatumaxis)suspension-wiremicrometer
Localclearanceofmatingfacesbetweenflangesofbackingrings
0.05Feelergauge
connectedwithflanges
5.4FurnaceBody
ⅠDominantItems
5.4.1
Incaseofweldingforassemblyoffurnacebody,theWPQshallbecarriedoutwithreport,
basedonwhichtheweldingprocedureandtheoperationinstructionforweldingshallbedetermined
orprepared.人人文库
Quantitytobechecked:100%.
Inspectionmethod:CheckWPQreportandtheoperationinstructionforwelding.
5.4.2
Theinternalqualityofbuttweldsfromtheassemblyoffurnacebodyshallcomplywiththe
requirementofthedesigntechnicaldocument,orthatofGradeⅢofweldqualitygradingcriteriaof
ConstructionandAcceptanceCodeforWeldingWorkofFieldEquipmentandIndustrial
Pipeline
(GB50236)incaseofnorequirementintheabovedocument.
Quantitytobechecked:100%.
Inspectionmethod:Checktheultrasonicinspectionrecord.
5.4.3
Theappearancequantityofbuttweldsincaseoffurnacebodyassemblyshallmeetthe
·11·
requirementofthedesigntechnicaldocument,orthatofAppendixEoftheCodeincaseofno
requirementintheabovedocument.
Quantitytobechecked:100%.
Inspectionmethod:Observeorcheckwithamagnifier.
5.4.4
Thepostweldheattreatmentofbuttweldsincaseoffurnacebodyassemblyshallmeetthe
requirementofthedesigntechnicaldocument,orthatofAppendixFoftheCodeincaseofno
requirementintheabovedocument.
Quantitytobechecked:100%.
Inspectionmethod:Observeandchecktherecordofheattreatment.
5.4.5Thewater-cooledfurnacemouthmustbesubjecttohydrostatictestandflushingtest
accordingtotherequirementofthedesigntechnicaldocument.Ifnorequirementinthe
document,thefollowingrequirementsshallbecompliedwith:boosteritspressuretothetest
pressurewhichshallbe1.5timesoftheworkingpressureandholdfor10min,andthenlowerit
totheworkingpressureandholdfor30min,andcheckwhetherthereispressurefallorleakage.
Thetestshallbequalifiedincaseofnopressurefallorleakage.Incaseofflushingtest,thewater
shallbeabletoflowinandoutsmoothlyandfreelyforatleast24h,withoutanyleakage.
Quantitytobechecked:100%.
Inspectionmethod:Observe,andchecktherecordsforpressuretestandflushingtest.
5.4.6专用
Theconnectiondeviceforfurnacebodyandbackingringshallbeinstalledaccordingtothe
requirementofthedesigntechnicaldocument.
Quantitytobechecked:100%.
Inspectionmethod:Observe,actuallymeasure,andchecktheinspectionrecord.
ⅡGeneralItems
5.4.7
Theallowabledeviationforfurnaceshellassemblyshallcomplywiththerequirementsin
Table5.4.7.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable5.4.7.
Table5.4.7Allowabledeviationforassemblyoffurnaceshell
ItemAllowabledeviation(mm)Inspectionmethod
Diameteroffurnaceshell±10.0Measurebyaruler
DifferencebetweenthemaximumdiameterD
3/1000Measurebyaruler
andminimumdiamete人人文库roffurnaceshell
H
Heightoffurnaceshell3/1000Measurebyarulerandplumbwire
Verticalityoffurnaceshell*1.0/1000Measurebyarulerandsuspensionwire
DH
Note:1Thesymbolsinthetable""and""refertodesigndiameteranddesignheightoffurnaceshellrespectively.
2*referstoverticalityoftheplaneofmouthandhearthtotheaxisoffurnaceshell.
5.4.8
Theallowabledeviationforfurnaceshellinstallationshallcomplywiththerequirementsin
Table5.4.8.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable5.4.8.
·12·
Table5.4.8Allowabledeviationforinstallationoffurnaceshell
ItemAllowabledeviation(mm)Inspectionmethod
Measurebyarulerand
Longitudinalandhorizontalcenterlinesoffurnacemouth2.0
plumbwire
+1.0
DistancefromplaneoffurnacemouthtoaxisoftrunnionOpticalinstrument
-2.0
Verticalityofaxisoffurnaceshelltobearingsurfaceofbacking
1.0/1000
ring
Measurebyarulerand
Thecenterofwatercoolingdeviceatthefurnacemouthandthe
suspensionwire
furnacemouthcenterofthefurnaceshellshallbeatthesame5.0
verticalline
Note:Thebackingringshallbecheckedat"0"position.
Theactually-measureddistancefromtheplaneoffurnacemouthtotheaxisoftrunnionshall
complywiththerequirementofthefollowingformula:
HH
LL0-K
0=++(5.4.8)
2
L
Where:0—distancefromtheplaneoffurnacemouthtotheaxisoftrunnion(mm);
L
—designdistancefromtheplaneoffurnacemouthtotheaxisoftrunnion(mm);
H
0—heightofassembledfurnaceshell(mm);专用
H
—designheightoffurnaceshell(mm);
KK
—allowabledeviation,-2.0mm≤≤1.0mm.
5.5TiltingDevice
ⅠDominantItems
5.5.1
Thetrunnionandthegearmustbeassembledaccordingtothefollowingrequirement:
1
Themeshofgearholeandtrunnionshallmeettherequirementofthedesigntechnical
document.
2
Incasethegearholeandtrunnionarecylindrical,thegearsendfaceshallbetightly
contactedwiththetrunnionshaftsshoulderwiththelocalclearanceofnotlargerthan0.05mm.
3
Incasethegearholeandtrunnionarecone,theaxialpositioningringshallbetightly
contactwiththeendfaceofthegearandthatofthetrunnionsgroovewiththelocalclearanceof
notlargerthan0.05mm.
Quantitytob人人文库echecked:100%.
Inspectionmethod:Checkwithamicrometer,afeelergaugeandthecoloringmethod.
4
Thecontactareabetweentwoinclinedplanesofeverypairoftangentialkeysaswellasthat
betweentheworkingfaceofkeyandthatofkeywayshallbelargerthan70%.Theinterferencefit
betweenthetangentialkeyandthekeywayshallcomplywiththerequirementofthedesign
technicaldocument.
Quantitytobechecked:100%.
Inspectionmethod:Checkwithafeelergauge,amicrometerandthecoloringmethod.
ⅡGeneralItems
5.5.2
Theallowabledeviationforinstallationoftiltingdeviceshallcomplywiththerequirements
·13·
inTable5.5.2(seeFigure5.5.2).
Quantitytobechecked:100%.
Inspectionmethod:SeeTable5.5.2.
Table5.5.2Allowabledeviationforinstallationoftiltingdevice
ItemAllowabledeviation(mm)Inspectionmethod
Levelness0.10/1000Leveler
Shallconformtothe
PrimaryspeedreducerCentesimalmeter,
Couplingrequirementofthedesigntechnical
feelergaugeandsteelruler
documentorthatofGB50231
Measurebyarulerand
Anti-twistingbaseforLongitudinalandhorizontalcenterlines0.5
plumbwire
hung-typesecondary
Elevation±1.0Opticalinstrument
speedreducer
Levelness0.20/1000Leveler
A
±0.5Measurebyaruler
BearingPositioningB
±1.0Measurebyaruler
dimension
pedestalforC
+1.00Measurebyaruler
torsionbar
Fully-hungtorsionLevelness0.20/1000Leveler
D
barmechanism
PositioningdimensionE±2.0专用Measurebyaruler
forretainingsupport
F
±1.0Measurebyaruler
Levelnessoftorsionbar1.0/1000Leveler
人人文库
Figure5.5.2Schematicdrawingforinstallationoftorsionbarmechanismforfully-hungtiltingdevice
1-bearingpedestalfortorsionbar;2-torsionbar;3-tiltingreducer;
4-bearingpedestalatfixedend;5-trunnion;6-retainingsupport
5.6RemovableGuardBoardandFixedGuardBoard
GeneralItems
5.6.1
Theallowabledeviationforinstallationofremovableguardboardandfixedguardboard
shallcomplywiththerequirementsinTable5.6.1.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable5.6.1.
·14·
Table5.6.1Allowabledeviationforinstallationofremovableguardboardandfixedguardboard
ItemAllowabledeviation(mm)Inspectionmethod
Longitudinalandhorizontalcenterlines10.0Measurebyarulerandplumbwire
Elevation±10.0Opticalinstrument
Measurebyalevelerorwitharulerand
Levelness(orverticality)1.0/1000
suspensionwire
专用
人人文库
·15·
6InstallationofOxygenLanceandSublance
6.1GeneralRequirements
6.1.1
Thischaptershallbeapplicabletothequalityacceptanceforinstallationofcrosstravelling
androtatingoxygenlanceandsublanceaswellasthatofprobemountingmachineandpulling
machineforsublance.
6.2OxygenLance,SublanceandLiftingDevice
ⅠDominantItems
6.2.1Theoxygenlanceandsublancemustbesubjecttoahydrostatictestaccordingtothe
requirementofthedesigntechnicaldocument.
Quantitytobechecked:100%
Inspectionmethod:Observe,andchecktherecordofhydrostatictest.
6.2.2Theparts,componentsandpipelineoftheequipmentcontactwithoxygenmustnotbestained
withoilorgrease.
:专用
Quantitytobechecked100%.
Inspectionmethod:Checktherecordofdegreasing,andcheckviawipingwithwhitefilter
paperorexposingitundertheultravioletlamp.
6.2.3
Theclearancebetweenthejaworfrictionwedgeoftheliftingtrolleysropebreaking(ropeslack)
protectivedeviceandtheguiderailshallcomplywiththerequirementofthedesigntechnicaldocument.
Quantitytobechecked:100%.
Inspectionmethod:Checkwithafeelergauge.
ⅡGeneralItems
6.2.4
Theallowabledeviationforinstallationofliftingdeviceshallcomplywiththerequirements
inTable6.2.4.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable6.2.4.
Table6.2.4Allowabledeviationforinstallationofliftingdevice
ItemAllowabledeviation(mm)Inspectionmethod
ShallconformtotherequirementofMeasurebyarulerand
Straightnessofox人人文库ygenlanceandsublance
thedesigntechnicaldocumentsuspensionwire
Measurebyarulerandplumb
Longitudinalcenterline1.0
wire
Measurebyarulerandplumb
Horizontalcenterline1.0
wire
0.5/1000,≤3.0forthewholeMeasurebyarulerand
FixedguiderailVerticality
lengthsuspensionwire
Jointoff-set0.5Levelingrulerandfeelergauge
+1.0Measurebyarulerandafeeler
Jointclearance
0gauge
·16·
Table6.2.4(Continued)
ItemAllowabledeviation(mm)Inspectionmethod
Measurebyarulerandplumb
Longitudinalcenterline3.0
wire
Measurebyarulerandplumb
Horizontalcenterline3.0
wire
Balancedguiderail
1.0/1000,≤5.0forthewholeMeasurebyarulerand
Verticality
lengthsuspensionwire
Jointoff-set0.5Levelingrulerandfeelergauge
AxesofupperandlowerMeasurebyarulerand
0.5
clamperssuspensionwire
CrosstravellingCenteringthecenterofclamperMeasurebyarulerand
3.0
trolleyandthatoffurnacemouthsuspensionwire
Clearancebetweenidlerpulley+1.0
Feelergauge
andguiderail0
Clearancebetweenmovable+1.0
Feelergauge
guiderailandfixedone0
Off-setbetweenmovableguide
Movableguiderail0.5Measurebyaruler
railandfixedone专用
Measurebyarulerand
Verticalityofguiderail0.5/1000
suspensionwire
6.3Crosstravellingdevice
GeneralItems
6.3.1
Theallowabledeviationforinstallationofsingle-railcrosstravellingdeviceshallcomply
withtherequirementsinTable6.3.1(seeFigure6.3.1).
Quantitytobechecked:100%.
Inspectionmethod:SeeTable6.3.1.
Table6.3.1Allowabledeviationforinstallationofsingle-railcrosstravellingdevice
ItemAllowabledeviation(mm)Inspectionmethod
Longitudinalcenterlineofsingle-railtrack1.0Measurebyaruler
Longitudinallevelnessofsingle-railtrack0.5/1000Leveler
Elevationofsingle-railtrack±1.0Opticalinstrument
A
人人文库1±2.0Opticalinstrument
A
Positioningdimensionofsingle-rail2±2.0Opticalinstrument
B
trackandguiderail1±1.0Measurebyarulerandsuspensionwire
B
2±1.0Measurebyarulerandsuspensionwire
Shallconformtotherequirementof
Settingandtighteningofbaseplatefortrackandbolt
thedesigntechnicaldocument
Shallconformtotherequirementof
Hoistingmechanismofliftingtrolley
thedesigntechnicaldocument
Shallconformtotherequirementof
Crosstravellingmechanism
thedesigntechnicaldocument
·17·
Figure6.3.1Schematicdrawingforinstallationofsingle-railtrackandguiderailforcrosstravellingtrolley
1-lowerguiderail;2-upperguiderail;3-track
6.3.2
Theallowabledeviationforinstallationofdouble-railcrosstravellingdeviceshallcomplywiththe
requirementsinTable6.3.2.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable6.3.2.
Table6.3.2Allowabledeviationforinstallationofdouble-railcrosstravellingdevice
ItemAllowabledeviation(mm)Inspectionmethod
专用Measurebyarulerand
Longitudinalcenterlineoftrack2.0
plumbwire
Longitudinallevelnessoftrack0.5/1000Leveler
Elevationoftrack±1.0Opticalinstrument
Distancebetweenrails+2.00Measurebyaruler
Heightdifferenceoftwotracksatthesamecrosssection2.00Opticalinstrument
+1.0Measurebyarulerand
Jointclearance
0feelergauge
Jointoff-set0.5Measurebyaruler
Shallconformtotherequirementofthe
Settingandtighteningofbaseplatefortrackandbolt
designtechnicaldocument
Shallconformtotherequirementofthe
Hoistingmechanismofliftingtrolley
人人文库designtechnicaldocument
Shallconformtotherequirementofthe
Crosstravellingmechanism
designtechnicaldocument
6.4RotatingDevice
GeneralItems
6.4.1
Theallowabledeviationforinstallationofrotatingdeviceshallcomplywiththerequirements
inTable6.4.1.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable6.4.1.
·18·
Table6.4.1Allowabledeviationforinstallationofrotatingdevice
ItemAllowabledeviation(mm)Inspectionmethod
Measurebyarulerandplumb
Longitudinalcenterline1.0
wire
Measurebyarulerandplumb
Horizontalcenterline1.0
wire
Mastofturretfor
Opticalinstrumentorleveling
oxygenlanceElevation±5.0
ruler,orMeasurebyaruler
Checkwithaleveler,and
0.5/1000,≤3.0forthewhole
Verticalitymeasurebyarulerandsuspension
length
wiregaugeorwitharuler
Clearancebetweenturretforoxygen+0.2
Feelergauge
lanceandidlerpulley0
Measurebyarulerandplumb
Longitudinalcenterline1.0
wire
Measurebyarulerandplumb
MastofturretforHorizontalcenterline1.0
wire
sublance
Opticalinstrumentorleveling
Elevation±2.0
专用ruler,ormeasurebyaruler
Verticality0.10/1000Leveler
/,
WhentheturretforVerticalityofguiderail0.51000≤3.0forthewholemeasurebyarulerand
sublanceisintheforliftingtrolleylengthsuspensionwire
workingpositionShallconformtotherequirement
Guiderailtobelocked
ofsublanceofthedesigntechnicaldocument
6.5NitrogenSealingDevice
ⅠDominantItems
6.5.1
Theorificeofnitrogensealingringshallbeunobstructed
Quantitytobechecked:100%.
Inspectionmethod:Observe.
ⅡGeneralItems
6.5.2
Theallowabledeviationforinstallationofnitrogensealingringshallcomplywiththe
requirementinTab人人文库le6.5.2.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable6.5.2.
Table6.5.2Allowabledeviationforinstallationofnitrogensealingring
ItemAllowabledeviation(mm)Inspectionmethod
LongitudinalcenterlineofnitrogenMeasurebyarulerandplumb
5.0
sealingringforoxygenlancewire
HorizontalcenterlineofnitrogensealingMeasurebyarulerandplumb
5.0
ringforoxygenlancewire
·19·
Table6.5.2(Continued)
ItemAllowabledeviation(mm)Inspectionmethod
LongitudinalcenterlineofnitrogenMeasurebyarulerandplumb
5.0
sealingringforsublancewire
HorizontalcenterlineofnitrogensealingMeasurebyarulerandplumb
5.0
ringforsublancewire
6.6ProbeMountingMachineandPullingMachine
GeneralItems
6.6.1
Theallowabledeviationforinstallationofprobemountingmachineandpullingmachinefor
sublanceshallcomplywiththerequirementsinTable6.6.1.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable6.6.1.
Table6.6.1Allowabledeviationforinstallationofprobemountingmachineandpullingmachine
ItemAllowabledeviation(mm)Inspectionmethod
Longitudinalcenterline1.0专用Measurebyarulerandplumbwire
Horizontalcenterline1.0Measurebyarulerandplumbwire
Elevation±1.0Opticalinstrument
Levelnessorverticality0.10/1000Leveler
人人文库
·20·
7InstallationofHood
7.1GeneralRequirements
7.1.1
Thischaptershallbeapplicabletothequalityacceptancefortheinstallationofremovable
hoodandskirtforconverter.
7.2Skirt
ⅠDominantItems
7.2.1
Aftercompletedinstalled,theskirtshallbeinvolvedinthehydrostatictestofthesystem,
whichshallcomplywiththerequirementofthedesigntechnicaldocument.
Quantitytobechecked:100%.
Inspectionmethod:Observe,andchecktherecordofpressuretest.
ⅡGeneralItems
7.2.2
TheallowabledeviationforskirtinstallationshallcomplywiththerequirementsinTable
7.2.2.
:专用
Quantitytobechecked100%.
Inspectionmethod:SeeTable7.2.2.
Table7.2.2Allowabledeviationforskirtinstallation
ItemAllowabledeviation(mm)Inspectionmethod
Measurebyarulerandplumb
Longitudinalcenterline3.0
wire
Measurebyarulerandplumb
Horizontalcenterline3.0
wire
Measurebyaruleroroptical
SkirtElevation±5.0
instrument
Measurebyarulerand
Levelness1.0/1000
suspensionwire
Clearancebetweenidlerpulleyandvertical+2.0
Feelergauge
guidec人人文库olumn0
HeightdifferenceofcenterofuppercardinalMeasurebyanoptical
3.0
axesforhoistinghydrauliccylinderinstrumentoraruler
Hydraulic
liftskirtThecentersofupperandlowercardinal
Measurebyarulerand
axesforhoistinghydrauliccylindershallbeon2.0
suspensionwire
thesameverticalline
Levelnessofwindingdrumsdriveshaft0.15/1000Leveler
DrumliftskirtShallcomplywiththeCentesimalmeter,feelergauge
Drumcoupling
requirementofGB50231andsteelruler
·21·
7.3RemovableHood
ⅠDominantItems
7.3.1
Aftercompletedinstalled,theremovablehoodshallbeinvolvedinthehydrostatictestof
thesystem,whichshallcomplywiththerequirementofthedesigntechnicaldocument.
Quantitytobechecked:100%.
Inspectionmethod:Observe,andchecktherecordofpressuretest.
ⅡGeneralItems
7.3.2
Theallowabledeviationforinstallationofremovablehoodshallcomplywiththe
requirementsinTable7.3.2.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable7.3.2.
Table7.3.2Allowabledeviationforinstallationofremovablehood
ItemAllowabledeviation(mm)Inspectionmethod
Measurebyarulerand
Longitudinalcenterline3.0
plumbwire
Measurebyarulerand
Horizontalcenterline3.0
RemovableHoodplumbwire
Elevation±5.专用0Opticalinstrument
Measurebyarulerand
Verticalityoflowerinlet1.0/1000
suspensionwire
Concentricity2.0Measurebyaruler
FlangesatjointMeasurebyarulerand
Levelness1.5/1000,and≤3.0
feelergauge
Measurebyarulerand
Longitudinalcenterline2.0
plumbwire
Longitudinallevelness1.0/1000Leveler
Elevation±2.0Opticalinstrument
Track
+2.0
DistancebetweenrailsMeasurebyaruler
Crosstravelling0
trolleyforhoodHeightdifferenceoftwotracks
1.0Opticalinstrument
atthesamecrosssection
人人文库Span±2.0Measurebyaruler
TravellingDiagonal5.0Measurebyaruler
mechanismErrorofwheelspositionunderMeasurebyarulerand
2.0
thesamesidesillplumbwire
·22·
8InstallationofWasteHeatBoiler(VaporizationCoolingDevice)
8.1GeneralRequirements
8.1.1
Thischaptershallbeapplicabletothequalityacceptancefortheinstallationofwasteheat
boilerofconverter.
8.1.2
Thewasteheatboilershallbeinstalledaccordingtoboththerequirementofthischapter
SafetyTechnicalSupervisionCodeforSteamBoiler
andthatof.
8.1.3
Thewasteheatboilersystemshallbethermalinsulatedaccordingtotherequirementofthe
designtechnicaldocument,anditsheat-insulatinglayersshallbewithuniformthickness,firmly
boundandunexposed.
8.2Flue
ⅠDominantItems
8.2.1
Thefinnedtubeoffluemustbeunobstructed.
Quantitytobechecked:100%.专用
Inspectionmethod:Checkthequalifiedcertificateforball-passingtest,andobservewhether
theheaderisfreeofsundriesandthetubeorificeisunobstructed.
8.2.2
Incaseofweldingforflueassembly,theWPQshallbecarriedoutwithreport,basedonwhichthe
weldingprocedureandtheoperationinstructionforweldingshallbedeterminedorprepared.
Quantitytobechecked:100%.
Inspectionmethod:CheckWPQreportandtheoperationinstructionforwelding.
8.2.3
Thequantityofbuttweldsincaseofflueassemblyshallmeettherequirementofthedesign
SafetyTechnicalSupervisionCodeforSteamBoiler
technicaldocumentorthatofincaseofno
requirementintheabovedocument.
Quantitytobechecked:ComplywiththerequirementofSafetyTechnicalSupervisionCodefor
SteamBoiler.
Inspectionmethod:Observeorcheckwithamagnifier,andchecktheultrasonicorradiographic
inspectionrecords.
8.2.4Aftercompletedinstalled,theflueshallbeinvolvedinthehydrostatictestofthesystem,which
shallcomplywith人人文库therequirementofthedesigntechnicaldocument.Ifnorequirementinthe
document,thefollowingrequirementsshallbecompliedwith:boosteritspressuretothetestpressure
whichshallbe1.25timesoftheworkingpressureandholdfor20min,andthenlowerittotheworking
pressureandcheckwhetherthereiswaterleakageorabnormalityduringthetest;thepressureshallnot
change.
Quantitytobechecked:100%.
Inspectionmethod:Observe,andcheckthepressuretestrecord.
8.2.5
Theinstallationofspringsupportforflueshallensurethattheprecompressionlengthofthe
springshallmeettherequirementofthedesigntechnicaldocument,thebearingfaceofthespringshallbe
verticaltoitsforceddirectionandthatvarioussetsofspringsshallbeevenlystressed.
·23·
Quantitytobechecked:Randomlycheckatleastthreegroups.
Inspectionmethod:Observeandchecktheprepressedrecordofsprings.
ⅡGeneralItems
8.2.6
TheallowabledeviationforflueinstallationshallcomplywiththerequirementsinTable
8.2.6.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable8.2.6.
Table8.2.6Allowabledeviationforflueinstallation
ItemAllowabledeviation(mm)Inspectionmethod
Longitudinalcenterline5.0Measurebyarulerandplumbwire
Horizontalcenterline5.0Measurebyarulerandplumbwire
Elevation±5.0Opticalinstrument
Measurebyalevelerorwitharuler
Levelness(orverticality)1.0/1000
andsuspensionwire
Concentricity2.0Measurebyaruler
Flangejoint
Levelness1.5/1000,and≤3.0专用Measurebyarulerandfeelergauge
8.3BoilerBarrel
ⅠDominantItems
8.3.1
Thebaseofboilerbarrelatthemovableendmustbereservedwiththemovementamount
forthermalexpansionofboilerbarrelaccordingtotherequirementofthedesigntechnical
document,anditshallbeconfirmedwhetherthereisobstruction.
Quantitytobechecked:100%.
Inspectionmethod:Observeandcheckwitharuler.
8.3.2ThehydrostatictestofboilerbarrelshallmeettherequirementofArticle8.2.4oftheCode.
ⅡGeneralItems
8.3.3
Theallowabledeviationforinstallationofboilerbarrelandbaseshallcomplywiththe
requirementsinTable8.3.3.
Quantitytobechecked:100%.
Inspectionmethod:SeeTable8.3.3.
人人文库Table8.3.3Allowabledeviationforinstallationofboilerbarrelandbase
ItemAllowabledeviation(mm)Inspectionmethod
Measurebyarulerandplumb
Longitudinalcenterline2.0
wire
Measurebyarulerandplumb
BaseHorizontalcenterline2.0
wire
Levelness1.0/1000Levelmeter
Elevation±3.0Opticalinstrument
·24·
Table8.3.3(Continued)
ItemAllowabledeviation(mm)Inspectionmethod
Measurebyarulerandplumb
Longitudinalcenterline5.0
wire
Measurebyarulerandplumb
BoilerBarrelHorizontalcenterline5.0
wire
Elevation±5.0Opticalinstrument
Longitudinallevelness≤2.0forthewholelengthLeveleroropticalinstrument
8.4PipingforSteamandWaterSystems
ⅠDominantItems
8.4.1
Incaseofpipingwelding,WPQshallbecarriedoutwithcorrespondingreport,basedonwhichthe
weldingprocedureandtheoperationinstructionforweldingshallbedeterminedorprepared.
Quantitytobechecked:100%.
Inspectionmethod:CheckWPQreportandtheoperationinstructionforwelding.
8.4.2
Thequalityofweldsincaseofpipingweldingshallmeettherequirementofthedesign
SafetyTechnicalSupervisionCodeforSteamBoiler
technicaldocument,orthatofincaseofno
requirementintheabovedocument.专用
Quantitytobechecked:Complywiththerequirementofthedesigntechnicaldocumentorthat
SafetyTechnicalSupervisionCodeforSteamBoiler
of.
Inspectionmethod:Observeorcheckwithamagnifier,andchecktheradiographicinspectionrecord.
8.4.3
Thepositionsandformsofpipingsupportsshallconformtotherequirementsofthedesign
technicaldocument.
Quantitytobechecked:100%.
Inspectionmethod:Observe,orcheckwitharuler.
8.4.4ThehydrostatictestofpipingshallmeettherequirementofArticle8.2.4oftheCode.
8.4.5
Aftercompletelyinstalled,thepipingshallbeflushedtoensurethatthecolorandtransparencyof
wateratthesewageoutletisconsistentwiththatofwaterattheinletviavisualinspection.
Quantitytobechecked:100%.
Inspectionmethod:Checktheflushingandpurgingrecord,andobserve.
ⅡGeneralItems
8.4.6
TheallowabledeviationforpipinginstallationshallcomplywiththerequirementsinTable
8.4.6.人人文库
Quantitytobechecked:Randomlycheck10%.
Inspectionmethod:SeeTable8.4.6.
Table8.4.6Allowabledeviationforpipinginstallation
ItemAllowabledeviation(mm)Inspectionmethod
Measurebyarulerand
Longitudinalcenterline15.0
plumbwire
Measurebyarulerand
Horizontalcenterline15.0
plumbwire
Elevation±15.0Opticalinstrument
·25·
Table8.4.6(Continued)
Item
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026日本汽车半导体芯片供应产业现状供需调研和市场未来发展评估
- 2026中国通信设备制造业市场发展全面分析竞争态势与未来发展规划研究报告
- 2026中国食品添加剂行业市场发展现状供需分析及投资评估规划分析研究报告
- 2026中国智能穿戴设备行业市场供需分析与投资规划评估研究
- 2026圣卢西亚旅游业市场现状竞争格局分析及投资风险评估规划研究报告
- 2026中国食品饮料行业市场现状及投资前景分析报告
- 2026食品加工与饮料行业市场情况供需分析及投资评估规划分析研究报告
- 2026软件外包服务供需趋势探讨及应用前景规划分析研究
- 2026汽车座椅设计行业市场研究及消费者偏好分析深度报告
- 2026中国新能源汽车续航技术行业发展前景需求调研投资分析指导资料报告
- (正式版)DB44∕T 2828-2026 城镇燃气安全检查与评估标准
- 2026 文物保护责任监理师《法律法规与工程管理》考试参考题库 800题 -含答案
- 2026年贵州幼儿园教师进城选调考试试题
- 2025年(数据安全管理员)数据安全管理试题及答案
- 2025年度组织生活会个人发言提纲1
- 龟类科普教学课件
- 2026年及未来5年市场数据中国机械硬盘(HDD)行业市场发展数据监测及投资策略研究报告
- 译林版必修一Unit4重难点词汇讲解
- 术中神经电刺激在神经外科推广策略
- 眼科进修汇报课件
- 2025年艺术衍生品品牌联名合同
评论
0/150
提交评论