标准解读

《GB/T 18482-2026 可逆式抽水蓄能机组启动试运行规程》相较于《GB/T 18482-2010 可逆式抽水蓄能机组启动试运行规程》,在多个方面进行了更新和调整。这些变化主要体现在技术要求的细化、安全措施的加强以及对环境影响的关注上。

首先,在技术要求部分,新版本增加了对于数字化与智能化技术的应用指导,比如明确了远程监控系统的技术参数及其安装调试过程中的具体步骤。此外,还对机组性能测试方法进行了详细规定,包括但不限于效率曲线测定、振动噪声水平测量等项目,并且引入了更多现代化检测手段来确保数据准确性。

其次,关于安全措施方面,《GB/T 18482-2026》强调了更加严格的安全操作流程及应急预案制定要求。例如,新增了针对极端天气条件下如何保障设备正常运转的相关内容;同时,也提高了对工作人员职业健康保护的标准,如增加了个人防护装备配置建议等。

再者,考虑到环境保护日益受到重视,《GB/T 18482-2026》特别增加了对生态影响评估的要求。这不仅涉及到施工期间可能产生的污染控制措施,还包括长期运营中如何减少对周边自然环境的影响等方面的规定。

最后,新版标准还对文档记录提出了更高的要求,旨在通过完善的数据收集与管理机制促进整个行业的规范化发展。


如需获取更多详尽信息,请直接参考下方经官方授权发布的权威标准文档。

....

查看全部

  • 现行
  • 正在执行有效
  • 2026-04-30 颁布
  • 2026-04-30 实施
©正版授权
GB/T 18482-2026可逆式抽水蓄能机组启动试运行规程_第1页
GB/T 18482-2026可逆式抽水蓄能机组启动试运行规程_第2页
GB/T 18482-2026可逆式抽水蓄能机组启动试运行规程_第3页
GB/T 18482-2026可逆式抽水蓄能机组启动试运行规程_第4页
GB/T 18482-2026可逆式抽水蓄能机组启动试运行规程_第5页
已阅读5页,还剩35页未读 继续免费阅读

下载本文档

GB/T 18482-2026可逆式抽水蓄能机组启动试运行规程-免费下载试读页

文档简介

ICS27.140

CCSF29

中华人民共和国国家标准

GB/T18482—2026

代替GB/T18482—2010

可逆式抽水蓄能机组启动试运行规程

Codeforstartupandcommissioningofreversiblepumpedstorageunits

2026⁃04⁃30发布2026⁃04⁃30实施

国家市场监督管理总局

国家标准化管理委员会发布

GB/T18482—2026

目次

前言··························································································································Ⅲ

1范围·······················································································································1

2规范性引用文件········································································································1

3术语和定义··············································································································1

4总体要求·················································································································2

5启动前准备··············································································································2

5.1一般要求···········································································································2

5.2文件资料准备·····································································································2

5.3系统和设备检查··································································································3

5.4启动条件确认·····································································································7

6启动试验·················································································································7

6.1一般要求···········································································································7

6.2抽水调相启动试验·······························································································8

6.3抽水调相工况试验······························································································10

6.4抽水工况试验····································································································10

6.5发电启动试验····································································································11

6.6发电工况试验····································································································16

6.7发电调相工况试验······························································································18

6.8其他工况转换试验······························································································19

6.9涉网试验··········································································································19

6.10黑启动试验·····································································································20

6.11试验验收········································································································20

7试运行··················································································································20

8交接·····················································································································21

附录A(资料性)可逆式抽水蓄能机组启动试运行组织机构工作职责和内容····························22

附录B(资料性)启动试运行大纲编制内容······································································24

B.1工程概述·········································································································24

B.2编制依据·········································································································24

B.3启动试运行组织机构及职责·················································································24

B.4机组启动范围···································································································24

B.5机组启动试运行前具备的条件··············································································24

B.6启动试验项目及措施··························································································24

B.7启动试运行安全保证措施····················································································24

GB/T18482—2026

B.8启动试运行试验质量管理····················································································24

B.9启动试运行试验计划安排····················································································24

B.10附件··············································································································24

附录C(规范性)输水系统和机组流道充水······································································25

C.1尾水系统充水···································································································25

C.2蜗壳与尾水管充水·····························································································25

C.3引水系统充水···································································································25

附录D(规范性)电站受电···························································································27

D.1电站受电前应具备的条件····················································································27

D.2电站受电试验的一般程序及要求···········································································27

附录E(资料性)机组首次启动方式选择·········································································29

附录F(规范性)机组动平衡试验··················································································30

F.1一般要求·········································································································30

F.2试验步骤·········································································································30

附录G(资料性)可逆式抽水蓄能机组启动试运行应交接验收的资料目录·······························31

G.1管理性文件······································································································31

G.2资料性文件······································································································31

GB/T18482—2026

前言

本文件按照GB/T1.1—2020《标准化工作导则第1部分:标准化文件的结构和起草规则》的规

定起草。

本文件代替GB/T18482—2010《可逆式抽水蓄能机组启动试运行规程》,与GB/T18482—2010

相比,除结构调整和编辑性改动外,主要技术变化如下:

——更改了标准的适用范围,将可逆式抽水蓄能机组更改为可逆式抽水蓄能定速机组(见第1章,

2010年版的第1章);

——更改了术语和定义(见第3章,2010年版的第3章);

——将“总则”更改为“总体要求”,明确了启动试运行的工作程序(见第4章,2010年版的

第4章);

——将“设备分部调试及启动试运行前的检查”更改为“启动前准备”,删除了设备分部调试的内

容,增加了启动前应完成的工作和文件资料准备(见5.1、5.2,2010年版的6.1);

——增加了检查调速系统压力油罐事故低油压和事故低油位、导叶接力器全开行程和关闭时间及

机械过速动作和失电关闭导叶功能等要求(见5.3.3);

——增加了检查主进水阀压力油罐事故低油压和事故低油位、水压控制装置、工作密封与活门闭

锁功能及机械过速动作和失电关闭主进水阀功能等的要求(见5.3.4);

——增加了检查静态充气压水和回水排气试验的要求(见5.3.5.8);

——增加了检查高压油顶起装置交、直流泵切换功能及机械制动投入和退出故障模拟的要求

(见5.3.6);

——增加了检查静止变频器(SFC)小电流试验要求(见5.3.8);

——增加了检查电气一次、电气二次系统设备与其他机组隔离措施的要求(见5.3.9、5.3.10);

——增加了检查发电电动机气体灭火系统的要求(见5.3.11);

——更改了自用电切换试验的要求(见6.1.2,2010年版的15.5);

——增加了测量机组噪声的要求(见6.1.6);

——增加了检查机组出口开关、灭磁开关联动和拖动机组出口断路器在机组低频时应延时分闸动

作等要求(见6.2.2);

——增加了各工况轴承热稳定试验要求(见6.3.5、6.4.3、6.5.2、6.6.4、6.7.5);

——更改了抽水调相工况停机试验要求(见6.3.7,2010年版的10.7);

——增加了水泵断电、甩负荷试验前验证导叶接力器关闭时间和进行过渡过程计算等要求(见

6.4.3、6.6.3);

——增加了一管双机切泵试验(见6.4.3.10);

——增加了检查各转速开关量信号动作正常的要求(见6.5.2);

——更改了机组过速试验的要求(见6.5.3,2010年版的12.5);

——更改了空载工况下转速摆动相对值的要求(见6.5.4,2010年版的12.3.5);

——更改了发电电动机单相接地保护试验的要求,增加了注入式定子接地保护试验(见6.5.7,

2010年版的12.8.3);

——更改了投入励磁后机端电压的稳定性和超调量要求(见6.5.8,2010年版的12.9.4);

——更改了带主变短路升流要求(见6.5.9,2010年版的12.10.1.5);

——增加了发电工况一管双机甩负荷试验(见6.6.3.4);

GB/T18482—2026

——增加了涉网试验(见6.9);

——删除了变频器冷却系统试验、变频器功率部分和控制部分的检查试验(见2010年版的

9.1.2.1、9.1.2.2);

——删除了从零流量工况至抽水工况过渡过程的检查和试验(见2010年版的11.2);

——增加了尾水系统充水试验(见附录C);

——更改了电站受电的要求(见附录D,2010年版的第7章);

——将“机组启动方式选择”更改为“机组首次启动方式选择”,并调整为资料性附录(见附录E,

2010年版的第5章);

——更改了机组振动和主轴摆度的要求(见附录F,2010年版的9.1.3.9)。

本文件由中国电力企业联合会提出并归口。

本文件起草单位:国网新源集团有限公司、国网新源控股有限公司抽水蓄能技术经济研究院、国网

电力工程研究院有限公司、南方电网储能股份有限公司、国网山东省电力公司电力科学研究院、国网辽

宁省电力有限公司电力科学研究院、国网福建省电力有限公司电力科学研究院、国网冀北电力有限公

司电力科学研究院、水电水利规划设计总院、中国电建集团华东勘测设计研究院有限公司、东方电气集

团东方电机有限公司、哈尔滨电机厂有限责任公司、中国水利水电第五工程局有限公司、中国葛洲坝集

团机电建设有限公司、中国水利水电第十四工程局有限公司。

本文件主要起草人:王胜军、张学清、魏欢、秦俊、苏胜威、葛军强、邓磊、魏春雷、曹坦坦、赵博、田侃、

赵良英、宗万波、赵常伟、周喜军、周攀、刘仁、冯雁敏、郑凯、丛壮、黄琢、关英波、王瑞栋、梁浩、王生瓒、

莫文华、杨庆业、赵志强、李勇、叶飞、陈泓宇、罗胤、陈磊、陈善贵、肖庆华、李成军、张记坤、尚欣、吴在强、

洪旭刚。

本文件及其所代替文件的历次版本发布情况为:

——2001年首次发布为GB/T18482—2001,2010年第一次修订;

——本次为第二次修订。

GB/T18482—2026

可逆式抽

温馨提示

  • 1. 本站所提供的标准文本仅供个人学习、研究之用,未经授权,严禁复制、发行、汇编、翻译或网络传播等,侵权必究。
  • 2. 本站所提供的标准均为PDF格式电子版文本(可阅读打印),因数字商品的特殊性,一经售出,不提供退换货服务。
  • 3. 标准文档要求电子版与印刷版保持一致,所以下载的文档中可能包含空白页,非文档质量问题。

最新文档

评论

0/150

提交评论