建设工程质量安全监督登记书_第1页
建设工程质量安全监督登记书_第2页
建设工程质量安全监督登记书_第3页
建设工程质量安全监督登记书_第4页
建设工程质量安全监督登记书_第5页
已阅读5页,还剩1页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Registration number of supervisor: Quality and safety of the construction projectRecord of supervisorConstruction unit: Liuzhou Investment Holding Co. Ltd.Project Name: Phase V Municipal Road Project of Luowei Industrial Concentration Zone in Liuzhou CitySupervisory Authority: Liuzhou Construction E

2、ngineering Quality and Safety Supervision and Management OfficePrinted by Liuzhou Construction Engineering Quality and Safety Supervision and Management OfficeIn order to ensure the quality and safety of construction projects, according to the regulations of 建设工程质量管理条例, 建设工程安全生产管理条例 and 广西壮族自治区房屋建筑和

3、市政基础设施工程质量安全监督管理规定 (GJZ 2014 No.3), the construction unit is requested to go through the registration formalities of construction project quality and safety supervision with the relevant materials at the local engineering quality and safety supervision institution.I. general situation of the project

4、:Project nameProject addressConstruction area (m2)(or project scale)Structure typeEquipment installation workloadNumber of layersMunicipal engineering workloadProject cost (10,000 yuan)Planned commencement datePlanned completion dateSurvey unitQualification gradeDesign unitQualification gradeConstru

5、ction unitQualification gradeSupervision unitQualification gradeConstruction drawing review agencyQualification gradeII. Application materials:1 建设工程质量安全监督登记书 ; (The original is in quintuplicate, one copy is kept after being sealed by the supervision institution, and the remaining four copies are re

6、turned to the construction unit)2. Construction project planning permit; (check the original and receive a copy)3. Construction and supervision contracts; (check the original and receive a copy)4. Qualification certificates of construction and supervision units; (receive a copy)5. Engineering projec

7、t supervision qualification registration form; (check the original and receive a copy)Safety production license of 6 construction enterprises (including subcontracting enterprises); (receive a copy)7. List of personnel, photos (two-inch white background color photos), signature style and duty divisi

8、on documents of the construction project department and project supervision institution approved by the enterprise legal person; (receive one original)8. The project manager, builder, full-time safety officer, quality inspector, sampler, chief supervision engineer, professional supervision engineer,

9、 witness and other supervision personnels qualification certificate or post certificate, project manager and full-time safety officers safety production assessment certificate and renewal record; (check the original and receive a copy)9. Construction drawing design documents review qualified documen

10、ts and filing documents; (check the original and receive a copy)10. 1 geotechnical engineering investigation report; (check the original and return it to the construction unit)11. Notice of List of Major Hazard Sources in Construction Safety Production and Special Safety Construction Scheme (one ori

11、ginal is received), expert demonstration report of special safety construction scheme of partial projects with greater danger than a certain scale (check the original and receive a copy) and improved scheme (one original is received);12. The newly-built project on the demolition site or the project

12、with underground pipelines in the site to be built, the original pipeline layout of the site, or the certification documents without pipelines in the site; (check the original and receive a copy)13. The construction site layout plan, which mainly includes: the location of the proposed project, the i

13、nstallation location of construction machinery, the stacking location of materials, workers dormitories, the layout of temporary electricity and water, the direction of temporary roads, etc. and the materials, height and location of the enclosure are described in words; (receive one original)14. Cos

14、t plan of construction safety measures; (receive one original)15. Other documents stipulated by laws and regulations and the competent department of urban and rural construction of engineering housing.With the approval of the administrative department of housing and urban-rural construction, the con

15、struction unit shall go through the supervision and registration formalities after meeting the requirements for completing the supervision and registration formalities. In addition to the above information, the construction unit shall provide the following information:1. The inspection report made b

16、y the inspection agency on the quality of the physical structure of the constructed part of the project; (receive one original)2. Application for completing the supervision and registration procedures; (receive one original)3, construction, supervision, survey, design, construction units of the construction part of the project quality evaluation report; (receive one original)4. Quality control data of the constructed part. (check the original and 执业资格证书编号手机号码法定代理人规划指导者项目技术代表六、设计单位项目管理组织人员名单项目名称西方人名的第一个字职称注册证书编号手机号码法定代理人规划指导者道路专业负责人排水专业负责人七、建设单位项目管理机构人员名单项目

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论