版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、A,1,WIRE BOND PROCESS INTRODUCTION,A,2,CONTENTS,ASSEMBLY FLOW OF PLASTIC IC Wire Bond 原理 M/C Introduction Wire Bond Process Material SPEC Calculator DEFECT,A,3,封裝簡介,晶片Die,金線 Gold Wire,導線架 Lead fram,A,4,Wafer Grinding,Die Bonding,Wafer Saw,toaster,Wire Bonding,Die Surface Coating,Molding,Laser Mark,S
2、older Ball Placement,Singulation,Packing,封裝流程,Dejunk TRIM,Solder Plating,Solder Plating,Dejunk TRIM,TRIM/ FORMING,BGA,SURFACE MOUNTPKG,THROUGH HOLE PKG,A,5,Wire Bond 原理,pad,lead,Gold wire,Ball Bond ( 1st Bond ),Wedge Bond ( 2nd Bond ),A,6,Al,B.PRINCIPLE,A,7,銲接條件,HARD WELDING Pressure (Force) Amplify
3、 或著一個Die上出現不同Pad大小那就是以兩個Pad中心距離為BPP,但是一般我們要取一個Die上最小的BPP,Bond Pad Pitch,Bond Pad Open,Bond Pad Open,A,73,Ball Size,Ball Thickness,Ball Size Ball Size = y; Area = (y/2) x/(y/2) = z g/mil,A,77,C,Ball bond,Test specimen,Specimen clamp,Shearing ram,Wire,Bond shoulder,Interfacial contactball bond weld ar
4、ea,Bonding pad,h,(A) Unsheared,C,L,C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Full ball attached towire-except for regionsof intermetallic voiding,Ball separated at bonding pad-Ball interface-residual intermetallic(and sometimes portion of unalloyedball and metal) on pad in bondinterac
5、tion area,(D) Ball bond-bonding pad interface separation (typical Au to Al),C,Test specimen,Specimen clamp,Shearing ram,Wire,Minor fragment of ballattached to wire,Bonding pad,C,L,Ball sheared too high(off line, etc.)only aportion of shoulder andball top removed,Interfacial contactball bond weld are
6、a,(B) Wire (ball top and/or side) shear,C,Ball bond,C,L,Test specimen,Specimen clamp,Bonding pad,Major portionof ball attached to wire,Interfacial contact-ball bond weld areaintact,(C) Below center line shear, ball sheared through (typically Au to Au),C,Ball bond,C,L,Test specimen,Specimen clamp,Bon
7、ding pad,Pad metallizationseparates fromunderlying surface,Residual pad on ballball-pad interfaceremains intact,(E) Bond pad lifts,Test specimen,Specimen clamp,C,Ball bond,C,L,Bonding pad,Bonding pad lifts,taking portion of underlyingsubstrate material with it,(F) Cratering,Residual pad and substrat
8、e attachedto ball,ball-pad interface remainsintact,Shear Failure Modes,A,78,Crater Test,A,79,Calculate (I),UP Time =,(Total Actual Production Times Total Repair Time ),Total Actual Production Time,DOWN TIME RATE=,Total Repair Time,Total Actual Production Times,Total Operator Actual Repair Time,Total
9、 Operator Repair Frequency Stoppages,Total Actual Production Times Total Operator Repair Time,Total Operator Repair Frequency Stoppages,Total Technical Actual Repair Times,Total Technical Repair Frequency Stoppages,MTTS (MEAN TIME TO STOP ) =,MTBS (MEAN TIME BETWEEN STOP)=,MTTA (MEAN TIME TO ASSISTA
10、NCE ) =,A,80,Calculate (II),MTBA (Mean Time Between Assistance) =,Total Actual Production Times Total Technican Repair Times,Total Technical Repair Frequency Stoppages,MTBF(Mean Time Between Failure)=,Total Actual Production Times Total Technician Repair Time,Total Change Parts Repair Frequency Stop
11、page,規格寬度,製程寬度,規格上限 - 規格下限,6 ( 公差),(上限 or 下限 ) - 平均值,三個公差,CP ( 製程能力指標) =,CPK =,=,A,81,Quality,正常品 Material Problem 1st Bond issue (Peeling , Ball Lift , Off Center) 2nd Bond issue (滑針,縫點脫,short tail ) Looping Fail (wire snake wire,sweep wire loop base bent ),A,82,正常品,A,83,Material Problem,A,84,With
12、Ball,Wire,Pad Size,Missing Ball,Wire Broken,Bonding Ball Inspection,Ball Detection,A,85,Ball Size,Pad Center,Ball Center,Ball Placement (X,Y),Ball Off Pad,Bonding Ball Inspection (cont.),Ball Measurement,A,86,Peeling,1st Bond Fail ( I ),A,87,Ball Lift,1st Bond Fail (II),Ball Lift,A,88,Neck Crack,1st Bond Fail ( III ),A,89,Off Center,1st Bond Fail (IV),Off Center Ball,A,90,1st Bond Fail (V),Smash Ball,Smash Ball,A,91,With Weld,Wire,Capillary Mark,Missing Weld,Wire Broken,Lead,Bonding Weld Inspection,Weld Detection,A,92,2nd Bond Fail (
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026信访解决案例面试题及答案
- 2026智慧环保面试题及答案
- 2026专题展览面试题及答案
- 2026电梯导诊员面试题及答案
- 2026非对口专业营销面试题及答案
- 2026湖南导游面试题及答案
- 关于季度工作例会的总结函5篇范本
- 民族团结一家亲共建美好校园小学主题班会课件
- 2026图木舒克市医疗机构劳务派遣人员招聘笔试备考题库及答案详解
- 2026年尼勒克县全额事业编制大学生乡村医生招聘预开始啦考试备考试题及答案详解
- 中国航天科技集团校招面笔试题及答案
- 2025年杭州市西湖区社区工作人员(网格员)考试题库真题及答案
- 审计人员轮岗制度
- 2026年消防员职业技能鉴定题库灭火战术与操作规程
- 2026年国开电大古代诗歌散文专题形考题库200道附答案(夺分金卷)
- 物业管理服务操作手册
- 2026年燃气供应公司客户信息保密管理制度
- 交通安全教育培训课件模板
- 头疗销售实战话术
- 加油站安全隐患排查奖惩制度
- 安全风险辨识分级及管控制度
评论
0/150
提交评论