1、课件:菲迪克条款解读编写人:王平讲师:王平,译采翻译孵化中心培训教程版权所有,第2/4讲,目录,一、菲迪克机构介绍 二、菲迪克合同范本介绍 三、红皮书中主要事项的典型顺序 四、合同各方与条款 五、合同构成文件与条款 六、“工程”术语与条款 七、“施工”术语与条款 八、“工程量清单”术语与条款 九、“验工计价” 术语与条款 十、“缺陷”术语与条款 十一、“仲裁”术语与条款 十二、与“标”相关术语的译法 十三、其它高频使用术语与条款,译采翻译孵化中心培训教程,六、“工程”术语与条款,中文资料中经常出现“工程”和“项目” ,根据具体情况,可以适当处理成:Project, Works, Section
2、, Engineering等。,译采翻译孵化中心培训教程,六、“工程”术语与条款,1. Project 在国际承包业务中,由承包商承建的一个工程(在中文里也称为一个项目)叫做project。,译采翻译孵化中心培训教程,六、“工程”术语与条款,条款解读: The Borrower named in the Bidding Data has applied for or received a loan or credit (hereinafter called“loan”) from the International Bank for Reconstruction and Development
3、 or from the International Development Association (hereinafter interchangeably called “the Bank”) in various currencies equivalent to the amount in U.S. dollars indicated in the Bidding Data towards the cost of the Project specified in the Bidding Data, and the Borrower intends to apply a part of t
4、he proceeds of this loan to eligible payments under the contract for which these bidding documents are issued. 招标资料表中指明借款人已经向国际复兴开发银行或国际开发协会(统称为“世行”)申请/得到了一笔等值于招标资料表所述美元金额的贷款或信贷(下称“贷款”)用以支付招标资料表中规定的工程的费用,借款人拟将此贷款的部分资金用于本招标合同项下的合理支付。,译采翻译孵化中心培训教程,六、“工程”术语与条款,2. Works 每个Project 必然要按照工作性质划分为若干专业工程(或称工序
5、),在英语里叫Work,例如:土方工程(Earth work),混凝土工程(Concrete work),和路面工程(Pavement work)等,不能将Project与Works混淆。另外,Engineering 含有工程、工程设计的意思,在具体的施工建设中,不要到处用这个词。,译采翻译孵化中心培训教程,六、“工程”术语与条款,条款解读: The Employer shall have obtained (or shall obtain) the planning, zoning or similar permission for the Permanent Works, and any
6、other permissions described in the Specification as having been (or being) obtained by the Employer; and the Employer shall indemnify and hold the Contractor harmless against and from the consequences of any failure to do so. 业主应已(或将)为永久工程取得规划、区域划定、或类似的许可,以及在业主要求中所述的业主已(或将)取得的任何其他许可;业主应保障并保持使承包商免受因未
7、能完成上述工作带来的伤害。,译采翻译孵化中心培训教程,六、“工程”术语与条款,3. Section 分部工程系指某一项目的一部分、建筑物的一部分或是某一项专业的设备。,译采翻译孵化中心培训教程,七、“施工”术语与条款,履行施工合同,就是施工。在施工过程中,可能发生或涉及如下情况:施工准备、放线 、开工 、工程实施 、现场作业、暂时停工、拖长的暂停 、复工 、完工 、转让等。,译采翻译孵化中心培训教程,七、“施工”术语与条款,1. 施工准备/退场( Mobilization/demobilization ) 承包商接到监理工程师的开工命令(Commencement order)后就要立即做施工准
8、备,在国际承包工程中,施工准备叫做Mobilization。这里的Mobilization不是中文里的“施工动员”的意思,更不是中国特色的“思想动员”,而是施工现场的清理(Site clearance),施工营地搭建(Camp construction),施工设备和部分施工材料的进场(Equipment mobilization and construction material delivered to site),以及临时设施的搭建(Construction of temporary works)(与临时设施相对应的是永久性工程Permanent works)。在工程完工时将场地清理干净,
9、并将施工设备撤离现场的过程叫Demobilization(退场)。,译采翻译孵化中心培训教程,七、“施工”术语与条款,2. 放线( Setting out ) 是指建设单位或者个人建设单位在建设工程场地平整完毕,规划要求应拆除原有建筑物(构筑物)全部拆除后,委托具有相应测绘资质的单位按城市测量规范,使用黄海平面坐标和高程系统,依据建设工程规划许可证及附件、附图,进行的施工图定位。 换言之,放线是限定建筑物,道路等的建设范围,将施工图反映到施工现场。,译采翻译孵化中心培训教程,七、“施工”术语与条款,条款解读: The Contractor shall set out the Works in
10、relation to original points, lines and levels of reference specified in the Contract or notified by the Engineer. The Contractor shall be responsible for the correct positioning of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. 承包商
11、应按照合同中规定的或工程师通知的原始基准点、基准线和基准标高,给工程放线。承包商应负责对工程的所有部分正确定位,并应纠正在工程的位置、标高、尺寸或定线中的任何差错。,译采翻译孵化中心培训教程,七、“施工”术语与条款,条款解读: The Employer shall be responsible for any errors in these specified or notified items of reference, but the Contractor shall use reasonable efforts to verify their accuracy before they a
12、re used. 业主应对规定的或通知的这几项基准的任何错误负责,但承包商应在使用前,做出合理的努力对其准确性进行验证。,译采翻译孵化中心培训教程,七、“施工”术语与条款,3. 开工 (Commencement of Works ),译采翻译孵化中心培训教程,七、“施工”术语与条款,条款解读: The Engineer shall give the Contractor not less than 7 days notice of the Commencement Date. Unless otherwise stated in the Particular Conditions, the C
13、ommencement Date shall be within 42 days after the Contractor receives the Letter of Acceptance. 工程师应在不少于7天前向承包商发出开工日期的通知。除非专用条件中另有说明,开工日期应在承包商收到中标函后42天内。,译采翻译孵化中心培训教程,七、“施工”术语与条款,4. 工程的实施 (Execution of Works),译采翻译孵化中心培训教程,七、“施工”术语与条款,条款解读: The Contractor shall commence the execution of the Works as
14、 soon as is reasonably practicable after the Commencement Date, and shall then proceed with the Works with due expedition and without delay. 承包商应在开工日期后,在合理可能的情况下尽早开始工程的实施,随后应以正当速度,不拖延地进行工程。,译采翻译孵化中心培训教程,七、“施工”术语与条款,5. 暂时停工 ( Suspension of Works ),译采翻译孵化中心培训教程,七、“施工”术语与条款,条款解读: The Engineer may at an
15、y time instruct the Contractor to suspend progress of part or all of the Works. During such suspension, the Contractor shall protect, store and secure such part or the Works against any deterioration, loss or damage. 工程师可以随时指示承包商暂停工程某一部分或全部的施工。在暂停期间,承包商应保护、保管、并保证该部分或全部工程不致产生任何变质、损失或损害。,译采翻译孵化中心培训教程,
16、七、“施工”术语与条款,6. 拖长的暂停( Prolonged Suspension ),译采翻译孵化中心培训教程,七、“施工”术语与条款,条款解读: If the suspension under Sub-Clause 8.8 Suspension of Work has continued for more than 84 days, the Contractor may request the Engineers permission to proceed. If the Engineer does not give permission within 28 days after bei
17、ng requested to do so, the Contractor may, by giving notice to the Engineer, treat the suspension as an omission under Clause 13 Variations and Adjustments of the affected part of the Works. If the suspension affects the whole of the Works, the Contractor may give notice of termination under Sub-Cla
18、use 16.2 Termination by Contractor. 如果第8.8款暂时停工所述的暂停已持续84天以上,承包商可以要求工程师允许继续施工。如在提出这一要求后28天内,工程师没有给出许可,承包商可以通知工程师,将工程受暂停影响的部分视为根据第13条变更和调整规定的删减项目。若暂停影响到整个工程,承包商可以根据第16.2款由承包商终止的规定发出终止通知。,译采翻译孵化中心培训教程,七、“施工”术语与条款,7. 复工Resumption of Works,译采翻译孵化中心培训教程,七、“施工”术语与条款,条款解读: After the permission or instructi
19、on to proceed is given, the Contractor and the Engineer shall jointly examine the Works and the Plant and Materials affected by the suspension. The Contractor shall make good any deterioration or defect in or loss other Works or Plant or Materials, which has occurred during the suspension. 在发出继续施工的许
20、可或指示后,承包商和工程师应联合对受暂停影响的工程、生产设备和材料进行检查。承包商应负责修复在暂停期间发生的工程或生产设备或材料中的任何变质、缺陷或损失。,译采翻译孵化中心培训教程,七、“施工”术语与条款,8. 完工/竣工 (Completion of Works ),译采翻译孵化中心培训教程,七、“施工”术语与条款,条款解读: These delay damages shall be the only damages due from the Contractor for such default, other than in the event of termination under S
21、ub-Clause 15.2 Termination by Employer prior to completion of the Works. These damages shall not relieve the Contractor from his obligation to complete the Works, or from any other duties, obligations or responsibilities which he may have under the Contract. 除在工程竣工前根据第15.2款由业主终止的规定终止的情况外,这些误期损害赔偿费应是承包商为此类违约应付的唯一损害赔偿费。这些损害赔
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2027届山东省日照市岚山区中考四模物理试题含解析
- 2026年邯郸市中西医结合医院GCP培训考试模拟试卷及答案详解
- 2026年快递员职业技能等级考试模拟题及答案详解
- 2026年吊索吊具培训模拟试题(含答案)
- 公务员国考历年行测试题26年及答案详解
- 2026年房屋租赁复模拟试题目(含答案)
- 2026年资格考试工业工程基础知识备考试题及答案详解
- 2026年儿科小儿腹泻模拟试题(含答案)
- 2026年下颌骨肿瘤模拟题及答案详解
- 2026年下半年幼儿教师资格笔试保教知识与能力模拟题及答案详解
- 2025中国人寿招聘笔试参考题库及参考答案详解
- 2026中国智能渔业养殖系统市场供需格局投资发展规划分析报告
- 2026年马克思主义基本原理概论期末考试试题(含详细答案)
- 地方政府专项债券项目实施方案模板
- 2026年芯片设计DFT工程师高频面试题包含详细解答
- 中粮粮食采购管理制度
- TAVR治疗卒中风险防控实操指南
- 居家药学服务课件
- 交通事故案件追加被告申请书
- 大数据技术毕业论文
- 海绵城市建设专项汇报
评论
0/150
提交评论