版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、2020/7/30,Slide 1,监测 CDM Project Monitoring and Reporting,中国CDM能力建设项目培训讲义Training Material Building Capacity for the CDM in China,2020/7/30,Slide 2,CDM项目流程:The CDM Project Cycle,设计,审定/注册,监测,核查/认证,签发CERs,PP: 项目参与方 DOE:指定经营实体 EB: 执行理事会 CER: 经核证的减排,2020/7/30,Slide 3,监测计划应能过提供并符合认下列事项的所有相关数据: A monitori
2、ng plan shall provide for the collection and archiving of all relevant data necessary for determining: 在计入期内项目边界内温室气体源人为排放量 anthropogenic emissions by sources of greenhouse gases occurring within the project boundary during the crediting period; 在计入期内项目边界内温室气体源人为排放量基准 the baseline of anthropogenic e
3、missions by sources of greenhouse gases within the project boundary during the crediting period; 在计入期内项目边界外重要的并可归因于项目活动而增加的温室气体源人为排放 increased anthropogenic emissions by sources of greenhouse gases outside the project boundary that are significant and reasonably attributable to the project activity
4、during the crediting period. 若项目参与方或东道国认为项目所造成的环境影响较显著,则监测计划应包括收集并符合项目相关的环境影响的信息。 A monitoring plan shall provide for the collection and archiving of information related to the environmental impacts of the project, if those impacts are considered significant by the project parties or the host Party.
5、,监测计划:Monitoring Plan,2020/7/30,Slide 4,监测计划:Monitoring Plan,CDM项目应包括一个收集排放数据的监测计划 基准与监测方法应紧密相关 监测计划是未来项目核查的基础 监测计划应能够监控基准和项目排放的本质风险 基准与监测计划的设计应根据已批准的方法学,如果使用新的方法学应一并提交批准 可使用简化的基准方法学与监测计划,CDM projects must have a monitoring plan to collect accurate emissions data. A strong link should be established
6、 between baseline and monitoring methodologies The monitoring plan is the basis of future verification The monitoring plan should enable to monitor the risks inherent to baseline and project emissions. The baseline and monitoring plan must be designed according to approved methodologies. New baselin
7、e and monitoring methodologies shall be proposed and approved together. Simplified baseline methodologies and monitoring plans can be used.,2020/7/30,Slide 5,监测:Monitoring,监测方法学是否有特殊报告的要求?其要求是否被惯澈 Are there any specific reporting requirements in the monitoring methodology ? Are these being followed?
8、 什么参数应被监测? What factors should be monitored? 排放相关参数:燃料消耗、活动层级等 Emission related factors: fuel consumption, activity levels etc. 数据的可信度:商业、法规及其他 Reliability of data: Commercial, regulated, then others. 基准线参数: (项目计入期) Baseline factors (Credit-based projects): 政治法律、经济、社会发展、技术 Political-legal, economica
9、l, socio-demographic, technology 泄漏参数 Leakage factors 项目边界外直接或间接影响 Indirect or direct effects outside project boundaries,2020/7/30,Slide 6,报告透明性: Reporting transparency,对客户透明性的要求: Requirements for client transparency 项目的开发者应对其陈述的信息保持性,例如项目设计文件、基准研究、监测计划、监测报告、计算方法与假设,以及其他相关项目文件。 The project proponent
10、 shall be transparent in their presentation of information, such as project design documents, baseline study, monitoring plans, monitoring reports, calculation methods and assumptions and/or other relevant project documentation. 项目的执行者必须透明陈述涵盖其佐证减排量确认的审核跟踪的绩效数据 The project operator must be transpare
11、nt in the presentation of performance data that constitute the audit trail which sustain the determination of emission reductions.,透明性对所有涉及方都是必需的,它是产生可信的减排重要手段。Transparency is an imperative for all involved parties, and will be a significant means for creating credible emission reductions,2020/7/30,
12、Slide 7,报告的可比性:Comparability in reporting,在不同的报告期内所有的计量、计算、估算都应建立在同样的假设上。 Measurements, calculations and estimations must be based on the same assumptions over different reporting periods 不同的项目范围、确认方法、现区/流程的改变, 以及其他相关因素都应予以识别并纳入考虑。 Differences in project scope, determination methods, site/process ch
13、anges and any other relevant factors must be identified and taken into consideration,2020/7/30,Slide 8,数据风险 Data Risk,空着等级 Level of Control,低 low,低 low,高 high,高 high,Lack of 1990 data,Non-operated sites,Acquisitions &,divestitures,Inaccuracy of,measurement,Equity share,calculation,Boundary definitio
14、ns,Cultural bias/,gaming,Resources /,training,Data uncertainty,(,esp,Methane),Competence of,staff,Failure to ID,all sources,Original perceived risk level,Increased risk,level,Continuity,of staff,Decreased risk,level,温室气体信息的风险: Risks to GHG Information,2020/7/30,Slide 9,报告风险:Reporting risks,完整性:Compl
15、eteness 排放源的遗漏 Omission of a source 错误的定义边界 Incorrectly defined boundary 泄漏的影响 Leakage effects 精确性:Accuracy 重复计算 Double counting 显著的手抄转关键数据 Significant manual transfer of key data 适用不恰当的排放因子 Inappropriate use of emission factors 缺乏路径审核 Lack of audit trail 缺乏运行控制或对关键计量/监测设备的本质不确定性 Lack of operational
16、 control or inherent uncertainties over key measurement/monitoring equipment 数据管理较差 Poor management control over the data 一致性 Consistency 未文件化/解释方法学变更或其他变更 Undocumented/unexplained methodology changes or other changes,2020/7/30,Slide 10,报告风险减轻:Reporting risk mitigation,可以下列方法减轻报告的风险: Reporting risks can be mitigated by: 完整且精确的监
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 手术室工作专业知识培训
- 妊娠期护理评估及护理诊断
- 新生儿轻度窒息护理查房
- 《UI设计-AIGC驱动赋能界面完美设计》课件 项目三 设计与制作“校缘通”App项目- App图标设计
- 临床药效学评价方法与实践
- 胸部疾病影像学诊断进展
- 小学音乐教资面试结构化问答题库及答案
- 2026年平安银行招聘面试题及答案
- 2026年农夫山泉招聘面试题及答案
- 垃圾填埋场垃圾开挖环境合规培训考试试题及答案
- 认识花生课件
- 【《基于java的美妆商城的设计与实现》13000字】
- 白银市2025-2026学年七年级上学期语文月考测试试卷
- 毕业论文8000字范例学前教育
- 浙江省公路工程监理用表-监理抽检记录2025
- 理想汽车考试试题及答案
- 先心病的介入治疗与护理
- 小学信息技术跨学科教学计划
- 成人高考高起专模拟试题
- 叉车风险分级管控清单
- 新媒体运营PPT完整全套教学课件
评论
0/150
提交评论