文档简介
1、Soft Tech Development Inc.,1,Software Project Tracking,A CMM Level 2 Key Process Area,Soft Tech Development Inc.,天马行空官方博客: ;QQ:1318241189;QQ群:175569632,Soft Tech Development Inc.,2,Purpose,The purpose of Software Project Tracking and Oversight is to provide adequate visibility into actual progress s
2、o that management can take effective actions when the projects performance deviates significantly from the plans. Software Project Tracking and Oversight involves tracking and reviewing the accomplishments and results against documented estimates, commitments, and plans, and adjusting these plans ba
3、sed on the actual accomplishments and results.,天马行空官方博客: ;QQ:1318241189;QQ群:175569632,Soft Tech Development Inc.,3,Goals,Goal 1 Actual results and performances are tracked against the software plans. Goal 2 Corrective actions are taken and managed to closure when actual results and performance devia
4、te significantly from the software plans. Goal 3 Changes to software commitments are agreed to by the affected groups and individuals.,Soft Tech Development Inc.,4,Commitment,A project software manager is designated to be responsible for the projects software activities and results. The project foll
5、ows a written organizational policy for managing the software project.,Soft Tech Development Inc.,5,Ability,A software development plan for the software project is documented and approved. The project manager explicitly assigns responsibility for work products and activities. Adequate resources and
6、funding are provided for tracking the software project. The managers are trained in managing the technical and personnel aspects of the project. First-line managers receive orientation in the technical aspects of the project.,Soft Tech Development Inc.,6,Activities,A documented software development
7、plan is used for tracking the software activities and communicating status. The projects software development plan is revised according to a documented procedure. Software project commitments and changes to commitments made to individuals and groups external to the organization are reviewed with sen
8、ior management according to a documented procedure.,Soft Tech Development Inc.,7,Activities,Approved changes to commitments that affect the software project are communicated to the members of the software engineering group and other software-related groups. The size of the software work products (or
9、 size of the changes to the software work products) are tracked, and corrective actions are taken as necessary. The projects software effort and costs are tracked, and corrective actions are taken as necessary.,Soft Tech Development Inc.,8,Activities,The projects critical computer resources are trac
10、ked, and corrective actions are taken as necessary. The projects software schedule is tracked, and corrective actions are taken as necessary. Software engineering technical activities are tracked, and corrective actions are taken as necessary. The software risks associated with cost, resource, sched
11、ule, and technical aspects of the project are tracked.,Soft Tech Development Inc.,9,Activities,Actual measurement data and replanning data for the software project are recorded. The software engineering group conducts periodic internal reviews to track technical progress, plans, performance, and iss
12、ues against the software development plan. Formal reviews to address the accomplishments and results of the software project are conducted at selected project milestones according to a documented procedure.,Soft Tech Development Inc.,10,Measures,Measurements are made and used to determine the status
13、 of the software tracking and oversight activities. Examples of measurements include: effort and other resources expended in performing the tracking and oversight activities; and change activity for the software development plan, which includes changes to size estimates of the software work products
14、, software cost estimates, critical computer resource estimates, and schedule.,Soft Tech Development Inc.,11,Verification,The activities for project tracking and oversight are reviewed with senior management on a periodic basis. The activities for project tracking and oversight are reviewed with the
15、 project manager on both a periodic and event-driven basis. The software quality assurance group reviews and/or audits the activities and work products for project tracking and oversight and reports the results.,Soft Tech Development Inc.,12,Coverage Goal 1,Actual results and performance are tracked
16、 against the plans,The software group uses the project plan AC 1 and conducts periodic internal reviews AC12 to track: product size AC 5 effort and cost AC 6 critical computer resources AC 7 project schedule AC 8 technical activities AC 9 project risks AC 10,Measurement and re-planning data are reco
17、rded AC 11,Formal reviews are help at key milestones AC 13,Soft Tech Development Inc.,13,Coverage Goal 2,Corrective actions are taken and managed to closure,The following are tracked and corrective actions taken: product size AC 5 effort and cost AC 6 critical computer resources AC 7 project schedul
18、e AC 8 technical activities AC 9,Measurement and re-planning data are recorded AC 11,The project plan is revised using a documented procedure AC 2,Soft Tech Development Inc.,14,Coverage Goal 3,Changes to commitments are agreed,Commitments and changes to commitments with external groups are reviewed with senior managemen
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 家居安装合同范本
- 终止租赁合同范本
- 材料供销合同版本
- 学校商铺租赁合同
- 什么是技术合同认定
- 房屋租赁合同协议范本
- 机床制造指导技术服务合同书
- 2023-2024学年人教版八年级下学期数学期末综合冲刺卷
- 关于商铺租赁合同写
- 心理教案模板7篇
- 智慧电子系统智能制造生产线项目各项安全管理制度、责任制、操作规程
- 2024患者十大安全目标
- 中学教科室工作总结
- 2024金融数据安全数据安全评估规范
- 胸部疾病的影像诊断
- 2024年江苏省吴江区实验初中教育集团九年级下学期一模考试物理试题
- (高清版)DZT 0284-2015 地质灾害排查规范
- 《多晶硅清洗工艺》课件
- 中国近现代史纲要 课程教案全套三
- 大学生职业生涯规划大学生职业生涯规划
- 传统文化与文化传统智慧树知到期末考试答案2024年
评论
0/150
提交评论