版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、investment management contract on _ hydropower station and expansion in zamfara state of nigeria between the zamfara state government and china hope energy investment limited and * partners limited of nigeriainvestment management contract on _ hydropower station and expansion in zamfara state of nig
2、eria between the zamfara state government and china hope energy investment limited and * partners limited of nigeria party a: _ state of nigeriathe consortium of party b (hereinafter: party b): a: china hope energy investment limitedb: * partners limited of nigeria whereas:1. according to nigerias f
3、ederal constitution, party a is an autonomous state government in nigeria. the ownership of _ water conservancy project (hereinafter: water project) and the supporting _ hydropower plant (hereinafter referred to as: _ hydropower plant) in zamfara state of nigeria belongs to party a. the installed ca
4、pacity of hydropower plant is 4.8mw (31.6mw), built by a italian company in the year of 1984, but since the equipments are old and damaged without heavy repair, it has suspended for 15 years. 2. a of party b is mainly engaged in energy, infrastructure and resource investment, general contracting, et
5、c., and has rich experience in international investment, project general contracting, financing, performance, brands, etc. b of party b is mainly engaged in investment and management of energy, real estate and resource operating assets in nigeria.3. nigeria and zamfara state both are short of power.
6、 in order to resume power generation of the _ hydropower plant and take an advantage of rain season to expand.after friendly negotiation, both parties to this contract, hereby agree as follows. i. party b invests in hydropower plant and expand 2.8mw generator units on hydropower plant1. party b inve
7、sts in hydropower plant in zamfara state of nigeria, by discussion of both parties, party b invests to conduct heavy repair and technical renovation of hydropower plant, and then operate, manage and use hydropower plant for 99 years + 99 years totaling 198 years. during the period of party bs invest
8、ing and operating hydropower plant, party a ensures that the water project provides all water used for hydropower plant to generate power as designed.2. the hydropower plant project company registered in zamfara state by party b pays party a $100 thousand usd of hydropower plant asset use fee and ma
9、nagement fee (hereinafter: management fee) each year. the project company pays preceding years hydropower plant management fee to the agency appointed by party a before march 31st of each year. after project company pays the management fee to the agency appointed by party a, project company finishes
10、 the preceding years payment obligation. the operation period and the management fee amount will be started calculating after the hydropower plant completes the heavy repair and renovation.3. after the signing of this contract, a of party b will send experts to the site of hydropower plant to conduc
11、t planning and design for the repair and technical renovation, and they will try to finish the repair and technical renovation in about 15 months for power generation. 4. for the _ hydropower plant, according to relevant policies of the nigerian government, the hydropower plant feed-in tariff is abo
12、ut 17 us cents/kwh (excluding value-added tax). party a will coordinate with the distribution company in zamfara state to sign a 20-year plus 10-year totaling 30-year power purchase agreement (hereinafter referred to as: ppa) with the project company. the distribution company ensures to purchase all
13、 power generated by _ hydropower station. according to the agreement signed by nigerian government and standard bank of south africa, the standard bank of south africa offers guarantee letter for the payment of ppa.5. a of party b invests and holds 70% shares of the project company, where as b of pa
14、rty b invests and holds 30% shares. 6. the project company invests and operates the hydropower plant workshops, generator units and supporting facilities, repairs the damaged workshops, generator units and supporting facilities before operation period expires and then transfers to party a. 7. the pr
15、oject company invests to expand 2.8mw units (hereinafter: expansion units) at hydropower plant. the ownership of workshops, units newly built up by project company belongs to project company perpetually. the ownership of the land occupied for new units and workshops will be sold by party a to the pr
16、oject company according to the price of the same type of land within in the area of the .hydropower plant, party a and party b agree that the price of this land sold to project company is 50 thousand usd. about party a selling the land for expansion units, party a and party b shall sign another agre
17、ement after party b completes the feasibility study of expansion units. party a ensures to supply water for the expansion units to generate power, so that to guarantee the expansion units running safely. party b invests by own on the connections between expansion units and the reservoir. party a use
18、s the water project reservoir to provide water free of charge to the expansion units, 5% of the annual power output generated each year by the expansion units will be used freely for the water project. the expansion units shall sign ppa with distribution company according to the feed-in tariff, ppa
19、of hydropower plant, the standard bank of south africa offers guarantee for the payment of ppa of expansion units. 8. party b shall by most possibly hire the current skillful and healthy employees of the hydropower plant under the same circumstances for investing the hydropower plant and expansion u
20、nits.9. the power consumption of the water project production and daily life will be provided by the party bs investing hydropower plant and expansion units (hereinafter: facilities power consumption), the price shall be paid to the project company by 95% of the on-grid price of the ppa of the proje
21、ct company and power distribution company. the power charge of the facilities power consumption shall be deducted from the hydropower plant 100 thousand usd management fee annually which project company pays to party a. provided that the power charge of the facilities power consumption exceeds the m
22、anagement fee which party b should pay to party a, the excessive power charge will be paid by engineering management institute or party a to project company. 10. party b needs to build supportive offices, employee dormitories and living facilities for party bs investing and operating the hydropower
23、plant and expansion units, party a sells 1 hectare land within the area of the current hydropower plant to party b, price is $20000 us dollar. party b pays the $20000 land fee to party a by once when party a issues the land ownership certificate to party b. party a and party b will sign another agre
24、ement about the 1 hectare land when party b starts to conduct the heavy repair and technical renovation of the hydropower plant. 11. party b authorizes powerchina chengdu engineering corporation limited to epc heavy repair and technical renovation of the hydropower plant and expansion units. 12. the
25、 dynamic investment of investing hydropower plant technical renovation, heavy repair, expansion units and construction shall be $9 million usd. 13. party a and project company shall be respectively responsible for 50% of the expense of the water project dam, access road maintenance and heavy repair.
26、 the expense of maintenance and heavy repair inside the reservoir area will be fully paid by party a. the expense of water project security guards shall be paid by party b. ii. party a offering party b preferential policies of investing and operating hydropower plant and expansion units1. party b co
27、nducts the units overhaul and renovation for hydropower plant and expansion units; party a shall apply to nigerian federal government for the exemption on the custom duties, value-added tax, and business tax of the imported equipments, materials and construction. 2. after the full operation of hydro
28、power plant and expansion units, the corporate income tax will be exempted for 5 years by zamfara state government of nigeria.3. nigerian government, zamfara state government, local government and institutes will not levy water resource fee (tax) or any other administration fee on hydropower plant o
29、r expansion units. 4. party a shall provide help and assistance in full and offer most preferential investment policies for party b to invest hydropower plant and expansion units. iii. hydropower plant and expansion units visa, work visa and greed card for staffs from china or a third countryall the
30、 party bs staffs and their families (hereinafter: project staffs) from china or a third country involving in conducting the hydropower plant overhaul, renovation, operation, expansion units, construction, operation and management, party a shall coordinate with the nigerian federal government and nig
31、erian immigration agency to process the visa, work visa and green card for the project staffs. party a ensures the normal maintenance, construction, management, operation and maintenance of the hydropower plant and expansion units. if it causes losses to the project company due to that the project s
32、taffs could not receive nigerian visa, work visa or greed card on time, party a shall bear the compensation responsibility. iv. the co2 emission reduction right of hydropower plant and new unitsnigeria is one of the developing countries, does not have mandatory index of co2 emission reduction; hydro
33、power plant and expansion units are viewed as small hydropower plant for the cdm used for calculating co2 emission reduction. party a shall provide overall help and support in all possible ways for the project company to obtain co2 emission reduction cdm of hydropower plant and expansion units. v. t
34、he security of the hydropower plant and expansion unitsparty a shall provide no less than 20 militants or police troops for the personal and asset safety of hydropower plant and expansion units, to ensure the security of persons and assets and the safe production of the hydropower plant and expansio
35、n units. any harm or losses to project companys staffs or assets in the plant and expansion units, party a shall bear the compensation responsibility. vi. _ hpp transferafter this contract has been signed and taken effect, during the time party b sending the experts and maintenance company to the si
36、te of _ hpp for maintain and renovation, party a and the current managemeng organization of _ hpp shall deliver all the existing plants, power generation channels, all equipment, facilities of _ hpp owned by party a to party b. then party a officially transfer the right of operation of _ hpp to part
37、y b to operate and use after heavy repair and technical renovation. vii. party a issue the right and interest certificate of _ hpp and expansion units to party b1. party a shall issue the right and interest certificate of _ hpp for 3 copies to party b based on the sixth clause of this contract durin
38、g the transfer. the form of the right and interest certificate of _ hpp is attached as the annex 1 of this contract. 2. party a shall issue 3 original copies of the right and interest certificates of the hydropower plant 2.8mw expansion units. the form of the right and interest certificate of expans
39、ion units is attached as the annex 2 of this contract.viii.confidentialitythe contract is classified. party a and party b shall not disclose the contract and the contents of the contract to any organization or individual except the governments, financial intuitions, lawyers, both partiessenior admin
40、istrative officers, accountants and auditors involved during execution of the contract.ix. market rules1. integrity, responsibility, morality and market economy are the basis for cooperation of both parties. fraud or non-market economy or forced nationalization or party a or any individuals or organ
41、izations of negeria terminated this contract or reduce the operting period of_ hpp, as well as increasing management fee or terminate, pause, reduce the production and on-grid energy (indicated in ppa) of _ hpp and expansion units by any reasons in the process of the project implementation shall be
42、subject to strict punitive damages, which includes direct loss and indirect loss. the compensation amount shall be over 3 times but below 10 times of the loss amounts.2. the clause ninth and clause tenth apply to any other institutions and individuals involved in the implementation of this contract.3. the implementing of the contract shall not be pardoned by sovereignty.x. friendly consultation and arbitrationany dispute between the both parties shall be settled through friendly consultation. if it still cannot be settled through consultation, it shall be coordinated b
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 支气管扩张感染护理的未来发展趋势
- 新生儿早产护理知识普及
- 工程估计(下篇共上下2篇)
- 原液准备老成黄化操作工岗前环保竞赛考核试卷含答案
- 支气管扩张的呼吸功能锻炼
- 应对病痛:病人的心理调适技巧
- 药物检验员岗前基础常识考核试卷含答案
- 紫胶生产工诚信知识考核试卷含答案
- 信息通信网络终端维修员创新意识考核试卷含答案
- 碳二饱和气体回收装置操作工安全风险竞赛考核试卷含答案
- MSA测量系统表格GR-R
- 中国肿瘤整合诊疗指南(2025版)结直肠癌及肛管癌更新要点解读
- 2025年资格考试-注册可靠性工程师历年参考题库含答案解析(5套典型题)
- T-GDWHA 0020-2025 一体化泵闸设计制造安装及验收规范
- 企业科技项目管理办法
- 2025年安徽省高考生物试卷(含答案)
- 干细胞与健康讲座
- 安全员c1证考试试题及答案
- DB32/T 3958-2020化工企业安全生产信息化管理平台建设技术规范
- 陪玩俱乐部合同协议
- T-SMA 0049-2024 巩膜镜设计和验配要求
评论
0/150
提交评论