1、SH/T 3503J319机组试车条件确认记录Machine Train Readiness for Test Run Confirmation Record工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.ModelCapacityDriver TypeRevolutionr/minItemTechnical RequirementConfirmed byDateOwner/ Supervision ContractorGeneral ContractorConstruction Contrac
2、torEquipment ManufacturerEquipment Dismantling InspectionDismantling inspection and restoration shall be completed and recorded as per specification requirements.Auxiliary SystemThe system shall be verified as acceptable.Oil Piping SystemFlushing and pressure test shall be completed and recorded as
3、per specification requirements.Circulating or Lube Oil Applicable requirements shall be met.Electrical FacilityInstallation shall be completed, testing qualified, and records made in accordance with the specification requirements.Instrument Interlock and Control SystemInstallation shall be completed
4、, system testing qualified, and records made as per specification requirements.Process Piping SystemInstallation shall be completed, pressure test and purging (cleaning) qualified, and records made as per specification requirements.Machine Train Test Run Plan Specific and clear test run procedure, m
5、easures and quality acceptance requirements shall be available.Supporting Operation Process and ConditionsPreparation shall be completed as required by the test run plan.Owners Responsible Person for Test Run:Confirmation on Test Run ConditionsReady for test run.General Responsible Person for Test R
6、un: SH/T 3503J3201往复式压缩机试车记录Reciprocating Compressor Test Run Record共()页 第()页 Page of 工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.ModelOperating MediumTest Run TypeNo-load LoadedTest MediumAmbient TemperatureDriver Type Revolution r/min Start-up CurrentAContinuous Runni
7、ng Time hTest Run DateStart-up TimingInspection ItemDesign / Allowable ValueActual ValueRunning Recording TimeLube OilInlet Pressure, MPaInlet Temperature,Outlet Temperature,Cooling WaterInlet Pressure, MPaInlet Temperature,Outlet Temperature,Vibration Speed (Amplitude)mm/s(m)AxialHorizontalVertical
8、Bearing TemperatureFront BearingRear bearingThrust Bearing1st Stage InletPressure, MPaTemperature,OutletPressure, MPaTemperaturePacking Box Temperature,Owner/Supervision ContractorGeneral ContractorConstruction ContractorEquipment ManufacturerDiscipline Engineer:Date:Discipline Engineer:Date:Foreman
9、: Quality Inspector: Discipline Engineer: Date: Site Representative:Date:SH/T 3503J320-2往复式压缩机试车记录(续)Reciprocating Compressor Test Run Record (Continued)工程名称:Project Name:单位工程名称:Unit Name:Inspection ItemDesign/Allowable ValueActual ValueRunning Recording TimeStageInlet Pressure, MPaTemperatureOutlet
10、Pressure, MPaTemperature,Packing Box Temperature,StageInletPressure, MPaTemperature,OutletPressure, MPaTemperature,Packing Box Temperature,StageInletPressure, MPaTemperature,OutletPressure, MPaTemperature,Packing Box Temperature,Test on the protective interlock system:Inspection after test run:Concl
11、usion:SH/T 3503J321-1离心式压缩机试车记录Centrifugal Compressor Test Run Record共()页 第()页 Page of 工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.ModelOperating MediumTest MediumDriver TypeRevolutionr/minStarting CurrentATest Run TypeNo-load LoadedAmbient Temperature Test Run DateCont
12、inuous Running TimehIdling Times Starting TimingInspection ItemDesign/ Allowable ValueActual ValueRunning Recording Time1st StageInletFlow, Nm3/hPressure, MPaTemperature,OutletPressure, MPaTemperature,Bearing Temperature,Front BearingRear BearingThrust BearingVibration Speed (Amplitude), mm/s (m)Fro
13、nt BearingHorizontalVerticalAxialRear bearingHorizontalVerticalAxialShaft Displacement, mmOwner/Supervision ContractorGeneral ContractorConstruction ContractorEquipment ManufacturerDiscipline Engineer:Date:Discipline Engineer:Date:Foreman: Quality Inspector: Discipline Engineer: Date: Site Represent
14、ative: Date:SH/T 3503J321-2离心式压缩机试车记录(续1)Centrifugal Compressor Test Run Record (Continued 1)工程名称:Project Name:单位工程名称:Unit Name:Inspection ItemDesign/Allowable ValueActual ValueRunning Recording Time StageInletFlow,Nm3/hPressure, MPaTemperature,OutletPressure, MPaTemperature,Bearing Temperature,Fron
15、t BearingRear bearingThrust BearingVibration Speed (Amplitude), mm/s (m)Front BearingHorizontalVerticalAxialRear bearingHorizontalVerticalAxialShaft Displacement, mm StageInletFlow,Nm3Pressure, MPaTemperature,OutletPressure, MPaTemperature,Bearing Tempera-ture, Front BearingRear bearingThrust Bearin
16、gVibration Speed (Amplitude), mm/s (m)Front BearingHorizontalVerticalAxialRear bearingHorizontalVerticalAxialShaft Displacement, mmSH/T 3503J321-3离心式压缩机试车记录(续2)Centrifugal Compressor Test Run Record (Continued 2)工程名称:Project Name:单位工程名称:Unit Name:Inspection ItemDesign/Allowable ValueActual ValueRunn
17、ing Recording TimeLube OilPressure, MPaInlet Temperature, Outlet Temperature, Seal Oil Pressure, MPaPower Oil Pressure, MPaAir Seal Pressure, MPaOil CoolerOil Inlet Temperature, Oil Outlet Temperature, Test on the protective interlock system:Inspection after test run:Conclusion:SH/T 3503J322-1汽轮机/燃气
18、轮机试车记录Steam/Gas Turbine Test Run Record共()页 第()页 Page of 工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.ModelRevolution r/minTest Run TypeNo-load LoadedTest Run Date Starting Time Continuous Running Time hAmbient Temperature Test MediumMinimum Operating Speed r/min Rated S
19、peed r/minCritical Speed r/minOverspeed Trip Settingr/minIdling Time sInspection ItemDesign/ Allowable ValueActual ValueRunning Recording Time Speed, r/minInletPressure, MPaTemperature,OutletPressure, MPaTemperature,Condensers Vacuum Degree, MPaBearing TemperatureFront BearingRear bearingThrust Bear
20、ingVibration Speed (Amplitude), mm/s (m)Front BearingAxialHorizontalVerticalRear bearingAxialHorizontalVerticalShaft Displacement, mmControl Oil Pressure, MPaOwner/Supervision ContractorGeneral ContractorConstruction ContractorEquipment ManufacturerDiscipline Engineer:Date:Discipline Engineer:Date:F
21、oreman: Quality Inspector: Discipline Engineer:Date: Site Representative:Date:SH/T 3503J322-2汽轮机/燃气轮机试车记录(续)Steam/Gas Turbine Test Run Record (Continued)工程名称:Project Name:单位工程名称:Unit Name:Inspection ItemDesign/ Allowable ValueActual ValueRunning Recording TimeLube OilInlet Pressure, MPaInlet Tempera
22、ture, Outlet Temperature, CoolerWater Inlet Pressure, MPaReturn Water Pressure, MPaWater Inlet Temperature, Return Water Temperature, Sketch showing locations of check points: Overspeed trip test: Test on the protective interlock system:Inspection after test run:Conclusion:SH/T 3503J323电动机试车记录Motor
23、Test Run Record工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.Motor TypeSpeedr/minTest Run TypeNo-load LoadedTest Run DateStartup TimeAmbient Temperature Continuous Running Time hIdling TimesStartup CurrentAInspection ItemDesign/Allowable ValueActual ValueRunning Recording
24、 TimeVoltage, VCurrent, ABearing Temp.Coupling SideNoncoupling SideVibration Speed (Amplitude), mm/s (m)Coupling Side BearingAxialHorizontalVerticalNoncoupl-ing Side BearingAxialHorizontalVerticalLube Oil Inlet Pressure, MPaInlet Temperature, Outlet Temperature, Cooling WaterInlet Pressure, MPaInlet
25、 Temperature, Outlet Temperature, Conclusion:Owner/Supervision ContractorGeneral ContractorConstruction ContractorEquipment ManufacturerDiscipline Engineer:Date:Discipline Engineer:Date:Foreman: Quality Inspector: Discipline Engineer: Date: Site Representative:Date:Note: This form is used to record
26、the running of the motor of 200kW and above. SH/T 3503J324变速器试车记录Transmission Test Run Record工程名称:Project Name:单位工程名称:Unit Name:Equipment Description Equipment Item No.Equipment ModelTransmission Type Ambient TemperatureTest Run TypeNo-load LoadedContinuous Running TimehTest Run Date Start-up Time I
27、nspection ItemDesign/Allowable ValueActual ValueRunning Recording TimeBearing TemperatureInput ShaftFront BearingRear BearingIntermediate Shaft 1Front BearingRear BearingIntermediate Shaft 2Front BearingRear BearingOutput ShaftFront BearingRear BearingVibration Speed (Amplitude), mm/s (m)Input Shaft
28、Front BearingHorizontalVerticalRear BearingHorizontalVerticalOutput ShaftFront BearingHorizontalVerticalRear BearingHorizontalVerticalConclusion:Owner/Supervision ContractorGeneral ContractorConstruction ContractorEquipment ManufacturerDiscipline Engineer:Date:Discipline Engineer:Date:Foreman: Quali
29、ty Inspector: Discipline Engineer: Date: Site Representative: Date:SH/T 3503J325釜类设备安装检验记录Kettle Type Equipment Installation Inspection Record工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.ItemAllowable ValuemmActual ValuemmDeviation in Elevation of Kettle Body Deviation i
30、n Orientation of Kettle body Vertical Deviation of Kettle body 0/180 90/270Deviation in Levelness of Top Opening Flange Face of Kettle Body 0/18090/270Vertical Deviation of Stirring Shaft 0/180 90/270End Radial Runout of Stirring ShaftAxial Movement of Stirring ShaftRadial Displacement Deviation of
31、Stirring Shaft at Shaft Seal Confirmation on the inside cleanness of the gearbox:Confirmation on the lube system:Confirmation on the cooling system:Confirmation on the sealing system: Conclusion: Owner/Supervision ContractorGeneral ContractorConstruction ContractorDiscipline Engineer:Date:Discipline
32、 Engineer:Date:Foreman: Quality Inspector: Discipline Engineer: Date: SH/T 3503J326立式设备安装检验记录Vertical Equipment Installation Inspection Record工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.Specification Note: h is the distance between two check points, taking mm. Unit: mmI
33、temCheck Point LocationAllowable Value Actual ValueItemCheck Point LocationAllowable Value Actual ValueDeviation in Elevation 0Deviation in Central Position of Support09090180180270270Vertical Deviation0/180Deviation in Orientation 090/270Conclusion:Owner/Supervision ContractorGeneral ContractorCons
34、truction ContractorDiscipline Engineer:Date:Discipline Engineer:Date:Foreman: Quality Inspector: Discipline Engineer: Date: SH/T 3503J327卧式设备安装检验记录Horizontal Equipment Installation Inspection Record工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.Specification Note 1: B、C、D、
35、E shown in the sketch are bench marks for measuring the equipment shell levelness.Note 2: The elevation of equipment installed shall be measured from the baseline on the equipment foundation to the lower surface of the base plate of the equipment support.Note 3: The deviation in axial levelness shal
36、l be in line with the drain direction.Note 4: L is the distance between two end check points, taking mm.Unit: mmItemCheck Point LocationAllowable Value Actual ValueItemCheck Point LocationAllowable Value Actual ValueDeviation in Central Position of Support LongitudinalDeviation in Longitudinal Level
37、ness B-CHorizontalD-EDeviation in Elevation of Support Sliding SideDeviation in Horizontal Levelness B-DFixed SideC-ESliding Tolerance of Saddle at Sliding Side Verified Loosening Status of Nut at Sliding SideNote: The double nut for the anchor bolt at the sliding side shall be loosened after the in
38、stallation of the equipment piping, and then tightened with a certain clearance maintained from the support plate. Conclusion:Owner/Supervision ContractorGeneral ContractorConstruction ContractorDiscipline Engineer:Date:Discipline Engineer:Date:Foreman: Quality Inspector: Discipline Engineer: Date:
39、SH/T 3503J328塔盘安装检验记录Tray Installation Inspection Record工程名称:Project Name:单位工程名称:Unit Name:Equipment DescriptionEquipment Item No.SpecificationTray TypeInspection Item, mmTray Levelness Deviation Tray Support Overflow WeirDowncomer and Seal Pan OthersSpacingLevelnessHorizontal DeviationHeight DeviationVertical DistanceHorizontal DistanceAllowable ValueTray No.Actual ValueActual ValueActual ValueActual ValueActual ValueActual ValueActual Valu
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 院感科室年度工作计划范文2篇
- 2026年会展合规SaaS 服务协议
- 2026年电商检测产品设计协议
- 村文明事事堂工作制度
- 领导小组协调工作制度
- 飞机机组消毒工作制度
- 高铁疫情防控工作制度
- 邵阳市双清区2025-2026学年第二学期五年级语文第七单元测试卷(部编版含答案)
- 克拉玛依市克拉玛依区2025-2026学年第二学期三年级语文第七单元测试卷(部编版含答案)
- 桂林市象山区2025-2026学年第二学期三年级语文期末考试卷(部编版含答案)
- T-CBIA 009-2022 饮料浓浆标准
- 触电应急桌面演练
- 向下管理高尔夫实战训练个案研究
- JTS-131-2012水运工程测量规范
- 剪叉式升降工作平台作业专项施工方案24
- 多联机空调维保方案
- 日产GT-R保养手册
- 费斯汀格法则原文
- 2023年山东春考语文真题
- 用户操作手册-Tagetik合并财务报表系统实施项目
- 青州至胶州天然气管道工程(淄青线潍坊段改造工程)-公示版1
评论
0/150
提交评论