版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、5、流程图(工序图)常用表达 首阶段:at the first/initial stage,+句子the process starts from+n./v.ing during the initial phase+句子at the beginning of the cycle/process+句子the beginning of the whole cycle is marked by +n./v.+ing n./v.ing is the first step in n./v.+ing 第二阶段:the second stage is + n./v.ing 下一阶段:the next step
2、 in the process is +n./v.ing 最后一阶段:n./v.ing is the last step in the procedure.the final phase of the procedure is about n./v.ing in the final phase+句子entering the final phase+句子n./v.+ing is the final stage.传送: 转化: 使用:deliver,send,transfer,transport convert into;transform into utilise;employ,use常用连接词
3、和动词表达时间先后顺序的连接词:Afterwards; subsequently; then; in the next step; after that; next; finally表示先后顺序:before being done; once; untile.g. 先过滤液体黄油,然后将其转化为固体黄油Liquor butter is filtered, before being converted into solid butter. 分词结构Once liquor butter is filtered, it is converted into solid butter. 状语从句Liqu
4、or butter is filtered, until it is converted into solid butter. 状语从句流程图开头段1、是什么流程2、流程一共包含多少步骤流程图1You should spend about 20 minutes on this task.The diagram below shows the process by which bricks are manufactured for the building industry.Summarise the information by selecting and reporting the main
5、 features, and makediggermetal gridsand + waterwire cutterbricksclaycooling chamberrollerkilnmoulddrying ovendeliverycomparisons where relevant. Write at least 150 words.brick manufacturingpackaging开头段1、是什么流程2、流程一共包含多少步骤原题目:The diagram below shows the process by which bricks are manufactured for the
6、 building industry.The diagram shows how the bricks are manufactured in seven stepsfor the building purposes.The diagram shows the process of brick manufacturing in seven stepsfor the building purposes.Band 9:The procedure (by which bricks are manufactured for the building industry)can be outlined i
7、n seven consecutive steps.工序图的叙述步骤第1步:确定材料第2步:确定工具第3步:确定动词分步骤分析第1步diggerclay确定材料:clay 工 具 :digger 动词:digAt the beginning of the process, clay is dug from the ground by a digger.分步骤分析claymetal gridrollersand + water第2步确定材料:clay 工具:metal grid 动词:put确定材料:clay 工具:roller动词:be left on确定材料:clay,sand,water
8、动词:mix;be mixed with be added toThen, the clay is placed on a metal grid, and the filtered clay is left on a roller, after which sand and water are added to make a mixture.分步骤分析wire cuttermouldbricks第3步确定材料:mixture 或 clay 工具:mould, wire cutter 动词:be moulded,be cut,be shapedThe mixture is then either
9、 shaped by a mould or cut by a wire cutter.分步骤分析drying oven第4步确定材料:bricks工具:drying oven动词:place, put, dryAt the fourth stage in the process, the clay bricks are placed in a drying oven for one to two days.分步骤分析cooling chamberkiln第5步确定材料:bricks 工具:kiln,cooling chamber动词:be heated,be cooledNext, the b
10、ricks are heated in a kiln at a moderate temperature (200-900 degree Celsius) and then at a high temperature (up to 1300 degrees), before being cooled in a cooling chamber for two to three days.分步骤分析delivery第 6/7 步 确定材料:bricks 动词:pack,package, deliverpackagingFinally, the finished bricks are package
11、d and delivered.或Once the bricks are cooled down, they get packaged and delivered to building site.ExampleThe process by which bricks are manufactured for the building industry can be outlinedin seven consecutive steps.First the raw material, clay, which was just below the surface of soil in certain
12、 clay-rich areas has to be dug up by a digger. Then the lumps of clay are placed on a metal grid in order to break up the big chunks of clay into much smaller areas, which fall through the metal grid onto a roller, whose motion further segregates the bits of clay. Sand and water are added to make a
13、homogenous mixture, which is then either formed in moulds or cut into brick-shaped pieces by means of a wire cutter.Those fresh bricks are then kept in a drying oven for at least 24 and a maximum of 48 hours, several dozens if not hundreds of bricks at a time. The dried bricks are then transferred t
14、o a so-called kiln, another type of hightemperature oven. First they are kept at a moderate temperature of 200 - 1300 . This process is followed by cooling down the finished bricks for 48 to 72 hours in a cooling chamber.Once the bricks have cooled down and have become hard, they get packaged and de
15、livered to their final destination, be it a building site or storage. (215 words)spend上星 20。S,.圈飞 t-.mJi 刀冒,n 叩仕a _ - 气 r 妇 at Ile a s t 150woms - It C1t 10;n1ductioJmIX巳旦亢1召I s扣(卫剑飞习巨;开头段方法一:The two diagrams show how cement and concrete are produced with different materials and facilities used in f
16、ive steps and one step respectively.方法二:The first diagram demonstrates the process and the equipment used to make cement in five steps, and the second one illustrates how cement and other materials are mixed to manufacture concrete in one step for building purposes.分步骤分析第一幅图:制作水泥第1步确定材料: limestone 和
17、clay 工具: crusher动词: crushAt the first stage, limestone and clay are crushed into powder by the crusher.分步骤分析第一幅图:制作水泥第2步确定材料: powder工具: mixer动词: deliver,mixThe powder is then delivered to the mixer, where it is mixed.常用连接词和动词传送: 转化: 使用:deliver,send,transfer,transport convert into;transform into util
18、ise;employ,use表达时间先后顺序的连接词:Afterwards; subsequently; then; in the next step; after that; next; finally表示先后顺序:before being done; once; untile.g. 先过滤液体黄油,然后将其转化为固体黄油Liquor butter is filtered, before being converted into solid butter. 分词结构Once liquor butter is filtered, it is converted into solid butte
19、r. 状语从句Liquor butter is filtered, until it is converted into solid butter. 状语从句分步骤分析第一幅图:制作水泥第3步确定材料: mixture工具: rotating heater动词: send, heat, rotatethe mixture is subsequently sent to the rotating heater, in which it is heated and rotated.分步骤分析第一幅图:制作水泥第4步确定材料: powder工具: grinder, conveyor belt动词: place, grindpowder is placed on the conveyor belt. Powder is ground by the grinder into cement.In the next step, the powder is placed on th
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 语言艺术教育教学工作计划
- 心包剥脱术中术腔镜辅助技术
- 江苏省盐城市龙冈共同体2027届中考押题物理预测卷含解析
- 肝切除术ERAS临床护理路径的初步构建及应用
- 预制梁安装施工专项方案
- 综合能源站建设工程初步设计
- 小型水力发电项目运营管理方案
- 印染项目申请报告
- 危险化学品储存场所访客管理规范
- 应急避难场所建设方案
- 新版2026年新教材统编版九年级上册道德与法治期末复习全册考点提纲
- 羊绒衫制作工安全操作规程
- 新版2026秋新苏教版小学科学五年级上册全册知识点考点合集
- 2027兴业银行校园招聘笔试参考题库及答案详解
- ASTM D5276-23 中文版(运输包装件自由跌落测试标准 完整原文 + 不同重量跌落高度对照表)
- ASME B31.3-2024 中文版(工艺管道规范 引用 ASME V 卷无损检测要求)
- 武汉产业投资控股集团有限公司招聘笔试参考题库及答案详解
- 2026年海南发展控股公司招聘试题及答案
- 2025年山东公务员考试行测真题完整版(含答案+详细解析)
- 肿瘤类器官模型应用
- 《JBT 20114.4-2009 糖浆剂瓶封口机》专题研究报告
评论
0/150
提交评论