1、First compliance review of the application of the appraisal Committee, only through the compliance review of the application to take part in a detailed review. 8.1 application compliance review: does not meet one of the following conditions, procuratorial Agency to submit application through complia
2、nce reviews, be invalidated: (1) application of the formats, contents, meet the requirements of selected files, powers of Attorney, declarations by the legal representative and the tender agent application to meet the requirements; (2) licence and a bidding agent qualifications meet the requirements
3、; (3) the similar project tendering agency agent number and provide proof of material compliance; (4) the tendering Agency intends to put into this project the number of professionals to meet the requirements; (5) are intended to the agent of the project as a project manager has similar projects the
4、 number of and references to meet the requirements; (6) no fraud case. 8.2 application review in detail the Evaluation Committee through compliance reviews will be selected for detailed review of the application. 8.2.1 tender agent institutions similar project tender performance requirements (16 poi
5、nts) tender agent institutions similar project tender performance 16 points, by two part composition (1) agent similar project of cumulative bid amount scored calculation rules for: Agent water project bid amount (on January 1, 2007 has has bid notice for associate) cumulative each reached 100 milli
6、on Yuan have 2 points, water project cumulative bid amount scored up not over 6 points. In addition, completes a bid worth more than 500 million yuan in total 1 minute, but other items score accumulated winning amount up to a maximum of 6 points. (2) calculation rule for the number of agents similar
7、 projects: proxy bid amount (since January 1, 2007 winning notice shall prevail) bidding projects in more than 50 million Yuan by 2 points, but the Agency projects the number of scores up to 3 minutes. 8.2.2 to be agents of the construction project as a project manager in the same project performanc
8、e (10 points) Project Manager agent performance scores including agents of the bidding agencies of similar projects, as well as in other similar project tendering agency service agent during performance. Total 10 Project Manager agent performance, made up of two parts (1) acting like the accumulated
9、 winning amount calculation rule: agents for water conservancy project bid amount (since January 1, 2007 winning notice for example) cumulative average reached 100 million Yuan 3 but scored no more than 5 minutes. (2) calculation rule for the number of agents similar projects: proxy bid amount (sinc
10、e January 1, 2007 winning notice for example) in the more than 50 million Yuan water conservancy project period of 3 minutes, but scores the number of agents similar projects up to a maximum of 5 points. Project Manager demonstrated to provincial-level and higher peoples Government or the developmen
11、t and Reform Commission published the winning bidder on the designated media publicity shall prevail. 8.2.3 staff requirement (25 points) 1, to the construction project serving personnel, 4 years experience in tendering agent, 2 points per person, 2 years experience in tendering agent .Pig is not a
12、pig. With domestic international market and technology big environment of changes, as China traditional industry of pig production of job way and profit way are requirements related industry for resources integration, to quality security for premise, regulation based farming, and management cost and
13、 the production, and sales cost, go standardization, and scale, and intensive, and market road, fast upgrade whole industry chain of regulation capacity, market competition capacity and anti-risk capacity. First, industry analysis (a) the basic situation in China is a traditional hog production and
14、consumption country, 2008 46.15 million tons of pork, pig stock 462.64 million head by the end pig slaughter 609.6 million. National pig industrys annual production value at around 650 billion yuan, nearly 50% per cent of annual output value of animal husbandry. Sichuan province in 2008 produced 6.5
15、2 million tons of pork, with 694,000 tons of Chengdu city, live pig sell 10.46 million, first 15 Vice-provincial cities in the country. The whole nation advantage regional planning (2008-2015) there are 437 counties (cities), 55, Sichuan, Chengdu has 7 (including in pengzhou). International pig indu
16、stry mainly include the European Union, the United States, and Canada, and Brazil and other absolute scale of animal husbandry industry and technology developed countries. Market 1, the domestic market from Chinas meat consumption habits and economic analysis of the development situation, the emerge
17、nce of new trends in the market of domestic pork and its products. Docking is a pig production and sales more closely. The Yangtze River Delta, Pearl River Delta and the Bohai rim economic developed area industrial structure adjustment gathered pace, two or three industries to the Central and Wester
18、n bias. Second, the rigid domestic consumption growth. For a long period, pork is still the largest variety of meat consumption in China, the absolute consumption continues to grow. Especially in the vast rural market growth potential. Third, market for pork and higher product quality requirements.
19、Pollution-free pork safety and health has shown a very good market prospects. Four is the market changing. Currently, cold meat, more and more varieties of meat and pork meat products, which accounted for a large proportion of pork consumption, stores, chain stores, supermarkets and other marketing
20、methods is on the rise, and transport has been extended to more than 2000 km in RADIUS. Chengdu is an important River pig resource market, the citys commercial rate reaches above 60% of live pigs, pork and raw materials primary processing products in the domestic and international reputation is high
21、. Western hog trading center in Chengdu and provides disease-free areas of construction in order to further accelerate the development of swine industry realizes space and conditions. 2, the international markets at present, annual volume of trade in live pigs in the world year around 18 million, ab
22、out 6 million tons of pork trade. A large net exporter of pork is mainly the EU and North America,-importing countries mainly in Asia, Japan, and Korea, and Singapore, the Philippines, Hong Kong and other countries and regions, as well as Russia, about 3 million tonnes were imported. It is predicted
23、 that the world meat consumption increase of 80% in Asia in the future, our country has obvious geographical advantages, export potential. With the advancement of live pigs superiority industry belt construction, animal disease .京能电力后勤 丰镇发电厂4200MW机组脱硫系统石灰石采购项目投标文件电子版“2015年11月25日之前不得启封”招标方:内蒙古蒙电华能热电股
24、份有限公司丰镇发电厂招标项目名称:丰镇发电厂4200MW机组脱硫系统石灰石采购招标编号:0773-1540GNNM01854开标地点:内蒙古蒙电华能热电股份有限公司丰镇发电厂会议室开标时间:2015年11月25日上午9:00整(北京时间)投标企业:京能电力后勤服务有限公司日 期:2015年11月18日京能电力后勤 副本丰镇发电厂4200MW机组脱硫系统石灰石采购项目投标文件“2015年11月25日之前不得启封”招标方:内蒙古蒙电华能热电股份有限公司丰镇发电厂招标项目名称:丰镇发电厂4200MW机组脱硫系统石灰石采购招标编号:0773-1540GNNM01854开标地点:内蒙古蒙电华能热电股份有
25、限公司丰镇发电厂会议室开标时间:2015年11月25日上午9:00整(北京时间)投标企业:京能电力后勤服务有限公司日 期:2015年11月18日4.1 application of the Chinese language application for proxy bidding agency application system. 4.2 bidding agent applications should be submitted by the Agency included in the 5th chapter of the content, and than select file a
26、sked to provide appropriate documentation. 4.3 proxy application shall affix its official seal coding and page by page in the specified location. Agent a copy of the application shall have to number the pages and signed original copy (copy) (including supporting documents), and copy should be exactl
27、y the same. 4.4 application there shall be no loose pages. 4.5 agent application should be complete with indelible ink (powdered) prints, the agent shall not alter any page of the application. 4.6 bidding agencies offer should be based on the interim measures for the management of tendering agents s
28、ervice charges (meter prices 20021980) rules of the Nineth, tender agent service charges using the difference progressive billing rate. Charges in accordance with the tendering agents service charges and, in conjunction with the provisions of the specific circumstances of the project shall not be fl
29、oating up and down-floating range must not exceed 20%, otherwise the application cannot pass compliance checks, be invalidated. Due to bidding agency selection and principal-agent contracts signed during charging base bid amount has not yet been produced, it can only be according to the rates of pri
30、ce, bid and the bid amount determines after the end, controlled response rates calculated shall pay tender fee (tender agency fee accounts for the actual bidding agent item for fares). Than the selected person tendering agents service charge control the upper and lower limits, Cap for the State Deve
31、lopment Planning Commission of the interim measures for the management of tendering agents service charges (meter prices 20021980) of tendering agents service fees under 100%, the lower limit for the State Development Planning Commission of the interim measures for the management of tendering agents
32、 service charges (meter prices 20021980) of tendering agents service fees under 80%. Tendering agents service charge base should include the following tenders: construction, supervision and material over the above tenders are expected to be important, with each tendering agency entrusted with tender
33、 bid amount as a base for a separate computation of tendering agents service fees. Tendering agents service fee payment in accordance with the General Office of the State development and Reform Commission on tendering agents service charge of notification on the relevant issues (the change price 200
34、3857). Sale of prequalification documents and solicitation documents going to choose all, pricing should be based on the principle of profit not files, must not violate the relevant provisions in the price Department. 4.7 requirements in the form of application proxy application shall be prepared in
35、 the 5th chapter of the format. Application of various supporting documents should be requested by the selection of files grouped by order. Comparison and selection of the bidding agencies must provide supporting documents required by the file; the file you selected does not have the required suppor
36、ting documents, bidding agency acknowledged the need to provide, or you can provide. Proxy application shall be bound, and page-by-page coded in the order. 5th chapter application format notes: bidding agent .目 录第一部分:投标报价部分1.投标承诺函2.开标/投标一览表3.投标综合价格表4.投标价格分项报价表5.货物说明一览表6.投标保证金第二部分:资格证明及技术部分1.投标人对投标的投
37、标函2.法人授权委托书(附法人及委托人身份证复印件)3.投标人资质声明(附企业资信证明复印件)4.公司简介及资质文件4.1公司简介4.2营业执照(副本)4.3组织机构代码证(副本)4.4税务登记证(国地税副本)4.5一般纳税人证明4.6安全生产许可证4.7道路运输经营许可证及机动车行驶证4.8驾驶员相关证件4.9采矿许可证5.制造商资格声明及资质文件5.1制造商资格声明5.2制造商的营业执照(副本)5.3制造商组织机构代码证(副本)5.4制造商的税务登记证(副本)5.5制造商的一般纳税人证明5.6制造商的安全生产许可证6.主要业绩(附部分供销合同复印件)7.财务审计报告8.商务条款偏离表9.技
38、术及质量保证9.1石灰石各成分含量及检测手段(附石灰石检测报告复印件)9.2京能电力后勤服务有限公司察右中旗石灰石矿加工生产设备9.3京能电力后勤服务有限公司察右中旗石灰石矿生产工艺流程9.4京能电力后勤服务有限公司察右中旗石灰石矿生产能力9.5京能电力后勤服务有限公司察右中旗石灰石矿技术人员配备9.6京能电力后勤服务有限公司运输体系9.7京能电力后勤服务有限公司保障措施10.售后承诺书11.技术条款偏离表II第一部分 投标报价部分投标承诺函致: 中金招标有限责任公司 根据贵方为丰镇发电厂4200MW机组脱硫系统石灰石采购项目招标采购货物及服务的投标邀请函0773-1540GNNM01854
39、,签字代表李军维(副经理)经正式授权并代表投标人京能电力后勤服务有限公司提交下述文件:1. 开标/投标一览表2. 投标价格分项报价表3. 货物说明一览表4. 技术规格偏离表5. 商务条款偏离表6. 按投标文件投标人须知和技术规格要求提供的有关文件7. 投标人的资格证明文件8. 由中国光大银行股份有限公司呼和浩特分行营业部出具的投标保证金,金额为。9. 按招标文件要求提供的有关文件据此函,签字代表宣布同意如下:1. 所附投标价格表中规定的应提交和交付的货物和服务投标总价为。2. 投标人将按招标文件的规定履行合同责任和义务。3. 投标人已详细审查全部招标文件。我们完全理解并同意放弃对这方面有不明及
40、误解的权利。4. 本投标有效期为自开标日起120个日历日。5. 在下列情况下,投标保证金将被贵方没收:1) 开标后投标人在投标有效期内撤回投标的;2) 投标人在投标截止日期后对投标文件作实质性修改3) 中标人在规定期限内未能按投标人须知第31条及本招标文件中的相关章节规定签订合同的;4) 中标人在规定期限内未能按投标人须知第32条及本招标文件中的相关章节规定提交履约保证金/函的;5) 中标人在规定期限内未能交纳中标服务费的;6) 投标人有严重违反中华人民共和国招标投标法及国家和/或地方相关法规行为的。1. 投标人同意提供按照贵方可能要求的与其投标有关的一切数据或资料,完全理解贵方不一定接受最低
41、价的投标或收到的任何投标。2. 与本投标有关的一切正式往来信函请寄:地址:内蒙古呼和浩特市赛罕区金桥开发区世纪七路盛海大厦A座十一层电话真子邮件:39582897投标人授权代表主签:投标人名称:授权代表姓名、职务(印刷体):京能电力后勤服务有限公司李军维(副经理)公 章:2开标/投标一览表投标人名称:京能电力后勤服务有限公司 单位:人民币元序号货物名称数量(吨)投标单价(元/吨)交货期交货地点备注1石灰石25000投标方按招标方要求供货,但招标方应提前一天通知投标方供货内蒙古蒙电华能热电股份有限公司丰镇发电厂石灰石料场投标总价(
42、合计)法定代表人或其正式授权人签字并盖公章 注:1. 本表中所报价格必须与投标分项报价表中所报价格相一致。 2开标/投标一览表中只填写各类货物单价和总数量。(招标文件中要求的所有每种类别、型号设备单价和明细等将体现在投标分项报价标中)3、交货日期应以固定日期或日历日计算;3投标综合价格表投标人名称:京能电力后勤服务有限公司 序号货物名称制造商数量单价(元)备注一石灰石京能电力后勤服务有限公司设备出厂总价-0备品备件和专用工具(两年、免费提供)-0技术服务和培训总价-0运输和保险-0 货物运抵现场总价1537500投标人代表签字盖章:注: 1、如果按单价计算的结果与总价不一致,以单价为准修正总价
43、。2、如投标人不提供详细分项报价,则视为没有实质性响应招标文件。 投标人代表签字 4分项价格表投标人名称:京能电力后勤服务有限公司 项目名称:丰镇发电厂4200MW机组脱硫系统石灰石采购 招标编号:0773-1540GNNM01854 序号货物名称规格型号制造商名称原产地单位数量单价(元)总价(元)1石灰石CaCO390.0%,MgO2.5%,CaO50.4%,SiO23.0%,Al2O31.50%,Fe2O31.50%,烧失量40%,粒径0.52 cm, 若需提供石灰石粉,则要求细度达到325目且过筛率90()京能电力后勤服务有限公司内蒙古乌兰察布市察右中旗吨25000投标总价:壹佰伍拾叁万
44、柒仟伍佰元整投标人代表签字盖章: 注: 1、此表应按投标须知的规定密封随第一部分投标价格文件一同递交。 2、如果按单价计算的结果与总价不一致,以单价为准修正总价。3、如投标人不提供详细分项报价,则视为没有实质性响应招标文件。 4、本表应针对技术规范书中设备的供货范围进行报价。5货物说明一览表投标人名称:京能电力后勤服务有限公司 项目名称:丰镇发电厂4200MW机组脱硫系统石灰石采购 投标编号:0773-1540GNNM01854 序号货物名称主要规格/型号数量制造商交货期性能描述备注1石灰石CaCO390.0%,MgO2.5%,CaO50.4%,SiO23.0%,Al2O31.50%,Fe2O
45、31.50%,烧失量40%,粒径0.52 cm, 若需提供石灰石粉,则要求细度达到325目且过筛率90()25000京能电力后勤服务有限公司投标方按招标方要求供货,但招标方应提前一天通知投标方供货CaCO390.0%,MgO2.5%,CaO50.4%,SiO23.0%,Al2O31.50%,Fe2O31.50%,烧失量40%,粒径0.52 cm, 若需提供石灰石粉,则要求细度达到325目且过筛率90()过筛率90()法定代表人或其正式授权人签字并盖公章 注:各项货物详细技术性能描述可附加页;每一个项目一个货物说明一览表。6第二部分 资格证明及技术部分投 标 函致:内蒙古蒙电华能热电股份有限公司
46、丰镇发电厂中金招标有限责任公司l我们收到并研究了贵单位发出的 丰镇发电厂4200MW机组脱硫系统石灰石采购(0773-1540GNNM01854)招标文件,除在投标文件中明确提出的差异外,我们对招标文件的全部内容予以确认接受,愿意按招标文件的规定承担该设备的供应工作,严格执行我们所承诺的责任和义务。2我们承认投标函、投标报价书及根据招标文件所提供的其他所有文件为我们投标文件的组成部分,并愿意根据招标文件修改其中的任何缺陷。3如果我们中标,我们保证按招标文件的要求和业主签订工程承包合同,选派优秀项目经理和具有相应资格、经验的得力人员进驻施工现场,并实施合同。我们保证在接到项目法人开工通知后按期开
47、工,并在投标书附录中规定的时间内完成全部工程,质量优良。4我们同意在投标截止日起【120】天内遵守本投标文件,在此期限期满之前的任何时间,本投标文件一直对我们具有约束力。5我们投标报价总额为【】,我公司可按照贵公司要求供应。我们声明本投标报价己考虑了所有因素,在投标有效期内投标价格保持不变。6在签订和执行正式合同之前,本投标文件、招标文件连同你方书面的中标通知书,应构成我们双方之间有约束力的合同。7我们理解你方不一定必须接受最低报价的投标或你方可能收到的任何投标书的约束,同时也理解,如果我们未中标你方将不负担我们的任何投标费用。8. 我们同意按投标须知的约定向招标代理机构支付招标代理服务费。9
48、. 我们认为你们在授予合同前,有选择或拒绝部分甚至全部投标人的权8利,并同意你们对所采取的行为不做任何解释。10. 如果我们中标,在合同执行阶段不以任何理由(包括原材料涨价)提出涨价、降低标准等影响投资方利益和工程进展的要求。11承诺中标后,投入本工程的主要人员(项目经理、副经理、总工程师及主要技术人员)、主要机械设备及仪器、仪表等要保持相对稳定;如未征得建设单位同意擅自更换上述人员,将扣除最高不超过30%的履约保证金;如确需调整,经业主单位批准同意,可以更换。12. 承诺根据工程进度情况,局部工期可根据建设单位的要求,进行调整,以满足运营需要及总工期的实现,且对由此引起的赶工或窝工等费用不提
49、出索赔要求。13. 明确承诺,严格执行国家有关环境保护、文物保护、水土保持等方面的有关规定,认真做好生态环境保护工作。投标人:京能电力后勤服务有限公司法定代表人(或授权代表)签字: 日期: 年 月 日9法定代表人授权书本授权书声明:注册于 中国内蒙古乌兰察布市凉城县 的 京能电力后勤服务有限公司 在下面签字的 刘国忱董事长 代表本公司授权 京能电力后勤服务有限公司 的在下面签字的 李军维副经理 为本公司的合法代理人,就 丰镇发电厂4200MW机组脱硫系统石灰石采购项目的投标,以本公司名义处理一切与之有关的事务。授权期限:投标工作全部完成后授权书自动撤销。授权代表无权转委托。附:法定代表人和授权
50、委托人身份证。法定代表人签字盖章: 被授权人签字盖章: 10投标人资格声明致:中金招标有限责任公司为响应你方_2015_年_11_月的 丰镇发电厂4200MW机组脱硫系统石灰石采购项目(0773-1540GNNM01854)投标邀请,下述签字人愿参与投标,提供招标文件中规定的营业执照(副本)、组织机构代码证(副本)、税务登记证(国地税副本)、一般纳税人证明、安全生产许可证、道路运输经营许可证及机动车行驶证、驾驶员相关证件、采矿许可证、京能电力后勤服务有限公司察右中旗石灰石矿相关资质,提交下述文件并证明全部说明是真实的和正确的。1) 我方的资格声明,各有 1份正本, 2 份副本。2) 下述签字人
51、在证书中证明本资格文件中的内容是真实的和正确的,同时附上我方银行中国光大银行股份有限公司呼和浩特分行出具的资信证明。投标人 授权签署本资格文件人名称:_京能电力后勤服务有限公司_ 签字:_地址:_内蒙古呼和浩特市金桥开发 签字人姓名、职务(印刷字体)区世纪七路盛海大厦A座 李军维 副经理_ 传真: _ 电话:邮编:_010010_ 13公司简介企业名称京能电力后勤服务有限公司法定代表人刘国忱注册资本叁亿叁仟捌佰陆拾万元成立时间2004年04月28日公司地址内蒙古呼和浩特市金桥开发区世纪七路盛海大厦邮政编码010020电话0471-33337
52、77传工人数总人数:400 公司主要业务概况京能电力后勤服务有限公司是专业的石灰石(粉)供应商,目前为分布在内蒙、山西、宁夏的8家燃煤发电企业供应脱硫用石灰石,分别是岱海发电、京隆发电、京玉发电、宁东发电、京泰发电、康巴什热电、华宁热电公司、赤峰能源、盛乐发电。公司在内蒙古察右中旗和山西右玉拥有两座石灰石矿,同时在内蒙古察右后旗、内蒙古准格尔旗、山西大同、宁夏银川签约4座合作矿山,公司现有制粉站6个,能够稳定、经济的为燃煤发电企业供应高品位的脱硫用石灰石。 16制造商资格声明1. 名称及概况:(1)制造商名称: 京能电力后勤服务有限公司察右中旗石灰石矿 (2)总部地址: 内蒙古呼和浩特市赛罕区金桥开发区世纪七路盛海大厦A座十一层传真电话号码3)成立和或注册日期:2012年10月08日(4)实收资本: 0 (备注:京能电力后勤服务有限公司察右中旗石灰石矿为京能电力后勤服务有限公司的分公司无实收资本。京能电力后勤服务有限公司盈利情况祥见近三年审计报告 (5)近期资产负债表(到 2015 年 10 月 31 日止) 固定资产: 11421673.46
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 保密培训教材
- 预防痢疾的班会课件
- 爱心 传递温暖的主题班会课件
- 防汛抗旱知识教育
- 项目安全生产培训课件
- 乳腺超声分级标准解析
- 医院保洁安全培训
- 2025年爆破设备挖掘机械合作协议书
- 城镇污水管网建设工程招商引资报告
- xx河流排水防涝设施建设项目投资计划书
- GB/T 9074.18-2017自攻螺钉和平垫圈组合件
- 长沙梅溪湖国际新城产业组织与西区土地一级开发
- GB/T 3768-2017声学声压法测定噪声源声功率级和声能量级采用反射面上方包络测量面的简易法
- 临床诊疗指南(急诊医学)
- GB 2811-2007安全帽
- 语言学纲要(新)课件
- 胸腔积液PPT.ppt 课件
- 断指再植术后的切口
- 曾国藩为官之道
- 李中莹心理创伤简快辅导技巧(课堂PPT)
- Q∕GDW 12205-2022 高压柔性直流输电系统控制保护联调试验技术规范
评论
0/150
提交评论