Quality survey form23中英文.doc_第1页
Quality survey form23中英文.doc_第2页
Quality survey form23中英文.doc_第3页
Quality survey form23中英文.doc_第4页
Quality survey form23中英文.doc_第5页
已阅读5页,还剩15页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

hewlett-packardsupplier management processreferencerevision equality surveyrating sheet (品質檢驗表)subsystem ratings(子系統)supplier name:(供應商名稱)date:(時間)survey team leader:(品質檢驗主任)(范圍)無系統明顯缺陷必須改進滿意特優加權加權總數20407085100subsystems (子系統)0214171861. quality system management(質量系統管理)0.22. documentation(文件)0.13. procurement( 取樣)0.14. mfg. and material control ( 生產和原料控制)0.14. final acceptance(最終承認)0.16. calibration( 標度)0.17. quality information( 質量資料)0.18. statistical process control(統計程式控制)0.2system rating 86 - 100 outstanding(極好) 71 - 85 satisfactory( 滿意)system rating (系統級別) 41 - 70 improvement needed (必需改善) 21 - 40 significant deficiency(明顯的不良缺陷) 0 - 20 no system(無系統)previous system rating(以前的系統級別)(date: 時間 )quality survey(品質調查)element # 1: quality management(要素# 1:質量管理)factor rating ( r )(要素級別)company: _(公司名稱)date: _(日期)surveyor: _(檢驗員)無系統明顯缺陷必須改進滿意極好可用要素點(0或4 點)得分no.description012341.are quality objectives and responsibility clearly stated, widely distributed, and understood through the company.(品質目標和義務 觀念是否全面地深入公司的每一個職員,讓他們透徹地理解其內涵?)42.to what extent are quality objectives used to guide planning?(品質目標用來指導預防要達到什麼程度?)43.do all support organizations understand their role in achieving total customer satisfaction?(公司所有的支持部門是否意識到他們在能夠滿足客戶過程中所發揮的作用?)supplier/(一口鉗子)44.are the quality procedures and policies current and available at the point of application?品質程序和方針是否切實可行?45.are continuous improvement principles understood by all levels of management?(可持續性改善品質原則是否被各平級管理部所理解?)46.to what extent does management solicit and accept feedback from the work force?(管理要求和生產車間工人的反饋如何?)47.does a comprehensive training program exist?(是否有系統化品質培訓方案?)48.are the quality and reliability goals aggressive relative to customer expectations and targeted at continuous improvement?(與客戶積極期望的 可信賴品質目標是否按目標進行可持續的改進?)49.how technically informed are the people who are responsible for promoting continuous improvement? ( 促進品質改進的品質人員的技能程度如何?)410.does management have a defect prevention attitude to achieve continuous quality improvement?(在可持續性品質改進中管理人員是否具有品質預防的理念?)4total available points(可用要素得分點累計)40element rating (要素級別) = (tot. score / tot. avail. pts.)(總得分/可用要素得分累計)quality survey(品質調研)element # 2: documentation(要素# 2:文件)factor rating ( r )(要素級別)company: _(公司名稱)date: _(日期)surveyor: _(檢驗員)無系統明顯缺陷必須改進滿意極好可用要素點(0或4點)得分no.description(描述)012341.to what extent are manufacturing product, process, and configuration documents under issue control?(在品質系統控制中對產品,及其生產流程還有配置文件做何要求?)42.to what extent are preliminary and special product specs controlled?(在品質系統控制中對試產的和特殊品種的規格控制又做何要求?)43.how well does the system ensure that the most current customer specifications are available to the manufacturing personnel?(為確保目前的可用的客戶規格書品質系統又 如何要求我們的生產工人怎樣做才好呢?)44.to what extent does the system ensure that the most current material specifications are available to the procurement function?(系統為確保我們產品性能的正常發揮對來料要求做如何規定?)45.to what extent are incoming orders reviewed for revisions and issue changes?(系統對採購訂單的變更做何要求?)46.how well is conformance to customer specifications assured before an order is accepted?(在接單前與客戶的規格書要求 一致程度是否很好?)47.to what extent are critical characteristics classified?(系統對於臨界的產品品性做何要求?)48.to what extent are customers informed of changes made to products controlled by customer drawings or specifications?(對按照客戶的圖示和規格的產品有所 變更的品質系統做何要求?)49,is there an effective internal deviation control procedure and are customer requested deviations documented and followed?(是否有完全相迥異的且客戶文件化的可遵守的內部控制程序?)410.do new product development procedures exist and are they followed in the design process?(是否有可更新產品程序且它們遵守產品外觀流程?4total available points(可用要素點得分總計)40element rating(要素級別 )= (tot. score / tot. avail. pts.)(總得分/可用要素得分累計)quality survey(品質調研)element # 3: procurement(要素# 3:獲得)factor rating ( r )(要素級別)company: _公司名稱)date: _(日期)surveyor: _(檢驗員)無系統明顯缺陷必須改進滿意特優(可用要素點(0或4點)得分no.description012341.to what extent is quality history considered along with price, delivery, and service when making sourcing decisions?(當我們根據產品價格,交貨和服務做決定時,產品質量所要求的記錄要做何要求?)42.are purchased material requirements adequately specified?(採購的原料的要求是否有特別的說明?)43.are suppliers expected to conform exactly to requirements and are statistical tools used in sub-supplier control?(供應商是否與所真正的要求產品相符合且 統計工具是應用在子供應商控制中?)44.to what extent does the company have appropriate technical communications with its suppliers?(系統對公司與供應商的有什麼適當的技術聯系方式 做何要求?)45.does an effective procured material and services quality improvement program exist including sub-suppliers?(子供應商是否採取有效的原料和服務品質改進方案?)46.are receiving inspection facilities and equipment adequate and properly maintained?(是否正在接受適當的檢驗 和維修儀器和設備?)47.how well are receiving inspection procedures documented and followed?(是否正在實施文件化且可遵循化品質檢驗程序?)48.are receiving inspection results used for corrective and preventive action?(是否正在接收以糾正和預防的品質異常的結果?)49.how effective are the procedures for storage and timely disposition of discrepant purchased material?(關於預防庫存和 採購原料時間的差異 程序有效程度如何?)410.is there an effective supplier certification program and is it verified by independent checking?(有沒有有效的供應商証明方案由此可以獨立的檢查?)4total available points(可用要素得分點累計)40element rating(要素級別) = (tot. score / tot. avail. pts.)(總得分點/可用要素得分累計)quality survey(品質調研)element # 4: manufacturing and material control(要素# 4:生產和原材料控制)factor rating ( r )(要素級別)company: _公司名稱)date: _(日期)surveyor: _(檢驗員)無系統明顯缺陷必須改進滿意特優(可用要素點(0或4點)得分no.description(描述)012341.are process capabilities established and maintained on all major processes? (critical parameters)(對已建立和維護的品品質程式是否為主要流程式?(主要的參數)42.are in-process inspections, test operations, and processes properly specified and performed?(內置檢驗程式,實驗操作是否有正確說明和實際操作表演?)43.how adequate are in-process inspection facilities and equipment?(內置檢驗儀器和設備是否適當?)44.are the results of in-process inspections used in the promotion of effective corrective and preventative action?(內置檢驗結果是否應用在有效的產品異常預防和糾正中?)45.to what extent is preventative maintenance performed on the equipment and facilities?(在儀器和設備的維護中可預防且可實行程度如何?)46.are housekeeping procedures adequate and how well are they followed?(家務管理程序是否適當且他們應用怎麼樣?47.are procedures and facilities for storage, release, and control of material adequate?(所有關於庫存,出貨和來料控制的程序和儀器是否正確?)48.are in-stores and in-process materials properly identified and controlled?(內庫存和內原料是否能夠被正確識別和控制?)49.is in-process material protected from corrosion, esd, eos, deterioration, or damage?( 內產原料是否防腐,防靜電,eos,防變質和損害?)410.are process management plans established and for critical parameters followed?品質管理流程管理方案是否建立且它有最主要的且遵守的參數?)4total available points(可用要素點得分總計)40element rating(要素級別) = (tot. score / tot. avail. pts.)(總得分/可用要素得分累計)quality survey(品質調研)element # 5: final acceptance(要素# 5:最終承認)factor rating ( r )(要素級別)company: _(公司)date: _(日期)surveyor: _(檢驗員)無系統明顯缺陷必須改進滿意特優(可用要素點(0或4點)得分no.description(描述)012341.how well are statistical techniques used in determining the acceptability of finished goods to customer requirements (identify methods for sampling)?(應用在決定按照客戶要求的成品可承受力的統計技術如何?)42.are in-process inspection results used properly in final acceptance decisions?(內置流程檢驗結果是否最終可以接受?)43.how adequate are final acceptance facilities and equipment?(最終可接受儀器和設備適應程度如何?)44.are final product acceptance procedures documented and followed?(最終產品的可接受程序是否文件化且可遵守?)45.are final acceptance inspection results used for corrective and preventative action?(最終可接受結果是否應用於糾正和預防措施中?)46.to what extent are packing and order checking procedures documented and followed?(包裝和訂單檢驗是否文件化且可遵循?)47.are periodic tests conducted to audit the reliability and environmental performance of the final product?(對於成品可靠性實驗和環境管理是否定期地實施?)48.are quality procedures and controls adequate to allow product to be directly shipped to hp customers?(適當的品質檢驗程序和控制是否允許產品直接船運給hp客戶?)49.is root cause failure analysis performed on internal and external failures and appropriate corrective action implemented?(關於對不良品能內外失敗分析所得的產生不良缺陷的根本原因 的總結是否以後採取適當的糾正措施並加以實施?)410.are test/inspection personnel adequately trained in the procedures of their operations and are those procedures being followed?(所有測試和檢驗人員是否按照可文件化操作程序適當進行培訓?)4total available points(可用要素得分點累計)40element rating(要素級別) = (tot. score / tot. avail. pts.)(總得分點/可用要素得分點累計)quality survey(品質調研)element # 6: calibration(要素# 6:標度)factor rating ( r )(要素級別)company: _(公司)date: _(日期)surveyor: _(檢驗員)無系統明顯缺陷必須改進滿意特優可用要素點(0或4點)得分no.description(描述)012341.are calibration and maintenance facilities adequate?(校正和維修儀器是否適當?)42.are calibration and preventative maintenance programs fully documented?(校正和預防維護方案是否完全文件化?)43.are calibration and maintenance personnel fully qualified and in sufficient quantity?(實驗室儀器維修人員是否完全資格化且人員數量是否充夠?)44.to what extent is traceability to nist maintained?(對於nistr 追溯程度做何規定?)45.is calibration & maintenance up-to-date, effective, and sufficiently integrated with production equipment?( 校正和維修儀器是否最新的,有效且是否與產品設備配套?)46.is all calibration and maintenance equipment properly documented?(校正和維修儀器是否正確地文件化?)47.are all tools and fixtures that are used as media of inspection fully qualified and identified?(所有被用來作為媒體檢驗的工具和固定設備是否得到認証?)48.has repeatability of measuring devices and inspection or testing processes been established and is it monitored? note: are gauge capability studies conducted and gr&r ratios acceptable ( 1.5 and targeted at 2.0?(對於用來測量和監控的機器且cpks 1.5 目標是2.0 和關鍵性的流程能力良好嗎?)44.are incapable processes or machines targeted for improvement or replacement?(無用的程序和機器是

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论