交工文件214-225试验记录报告表.doc_第1页
交工文件214-225试验记录报告表.doc_第2页
交工文件214-225试验记录报告表.doc_第3页
交工文件214-225试验记录报告表.doc_第4页
交工文件214-225试验记录报告表.doc_第5页
已阅读5页,还剩8页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

表214起 重 机 械 安 装工序质量控制表Quality control table for installing procedures of crane项 目: Project装 置:Unit工 号:Section位 号Location No.型 号Model执行标准Standard for execution名 称Name起重能力Lifting capacity检 查 项 目Inspection item等级Grade签 名/日 期Signature/date施工单位Subcontractor监理单位建设单位Owner机械及附件接收Acceptance of machine accessoriesC基础复查Check of foundationC轨道及车档安装Installation of rail buffer blockC桥架组装Assembling of bridge frame C小车组装Assembling of trolleyC拆检及内部清洁度确认Disassembling inspecting interior cleanlinessB加注润滑油(脂)Filling oil (grease)C扶梯、走道、护栏检查Check of stair, walkway guardrailC主梁上拱度测量Measurement of main girder camberC试 运 转 Test run空负荷Idle loadingAR满负荷Full loading( )倍静负荷(测主梁上拱量)( )times static loading (measuring of main girder camber)额定负荷主梁下挠度Deflection of main girder under rated loading附注:Remarks表215容器、换热器安装工序质量控制表Quality control table for installing procedures of vessel and heat-exchanger项 目: Project装 置:Unit工 号:Section位 号 Location No. 名 称Name规 格Specification材 质Material工作介质Medium压 力 MPaPressure温 度 Temperature执行标准Standard for execution检 查 项 目Inspection item等级Grade签 名Signature施工单位Subcontractor监理单位建设单位Owner设备及附件接收Acceptance of machine accessoriesC基础复检Check of foundationC找正AlignmentC灌浆前检查Inspection before groutingAR内件安装Installation of imternalsA严密性试验Air-tightness testAR抽芯试压Core withdrawal and pressure testAR附件安装Installation of accessoriesC平台、扶梯、护栏安装Erection of platform stairguardrailC卧式设备滑动端检查Check of sliding end of horizontal equipmentB附注: Note: 表216分段塔组对工序质量控制表Quality control table for assembling sectioned column项 目:Project装 置:Unit工 号:Section位 号 Location No. 设备名称Name of equipment规 格Specification材 质Material设计压力Design pressure MPa设计温度Design temp.工作介质Medium执行标准Standard for execution检 查 项 目Inspection item等级Grade签 名Signature组对记录Assembling record施工单位Subcontractor监理单位建设单位Owner设备材料验收Acceptance of equipment materialC方位偏差Orientation deviation焊接及焊工资格认Welding process welders qualificationB直线度偏差Straightness deviation组对检查 Assembling inspectionCR焊缝外观Visual inspection of weldB长度偏差Length deviation无损检测Non-destructive testingAR焊缝热处理Heat-treatment of weldBR最大错边量Max. edge mismatch压力试验Pressuretest介质MediumAR压力 (MPa)pressure圆度偏差Roundness deviation时间 (Min)Duration附注:Note:表217塔 类安装工序质量控制表Quality control table for column type equipment项 目:Project装 置:Unit工 号:Section位 号 Location No. 名 称Name 规 格Specification材 质Material工作介质Medium压 力Pressure MPa温 度Temperature执行标准Standard for execution检 查 项 目Inspection item等级Grade签 名Signature垂直偏差 (mm)Vertical deviation施工单位Subcontractor监理单位建设单位Owner设备及附件验收Acceptance of equipment accessoriesC基础复查Check of foundationC0180方位确认 Affirmation of orientationC找正AlignmentCR90270灌浆前检查Inspection before groutingAR塔盘安装Installation of column trayAR附件安装Installation of accessoriesC平台、护梯、护栏检查Check of platform ,stairguardrailC装填料Packing of fillersAR封闭前检查Inspection before enclosingA基础沉降观测Observation of foundation settlementAR 备 注: Remarks:表218塔盘安装记录Record for installing column tray项 目:Project装 置:Unit工 号:Section位 号 Location No. 工作介质Medium名 称Name 设计压力Design pressure MPa规 格Specification设计温度Design temp.材 质Material执行标准Standard for execution塔盘编号TrayNo.塔盘支撑圈水平度Levelness Of tray supportingring (mm)降液板至塔板间距Distance from liquid dropping board to column tray (mm)塔盘水平度Levelness of column tray(mm/m)溢流堰高偏差Spillway height deviation(mm)溢流堰水平度Levelness of spillway(mm/m)塔盘充水鼓泡试验结果Result of bubbling test with water filling备注Remar-ks允许值Allo- wable value实测值Mea- sured value允许值Allo- wable value实测值Mea- sured value允许值Allo- wable value实测值Mea- sured value允许值Allo- wable value实测值Mea- sured value允许值Allo- wable value实测值Mea- sured value监理单位代表施工单位Subcontractor施工人Operator建设单位代表Owner representative检查员Inspector表219设备填充记录Packing record of equipment项 目:Project装 置:Unit工 号:Section 位 号Location No.名 称Name填充部位Packing Location填充物Packing规格/型号Specification/model材 质Material数 量Quantity填 充 方 法Packing method 备 注:Remarks:监理单位代表施工单位Subcontractor施工人Operator建设单位代表Owner representative检查员Inspector表220火炬、排气筒安装工序质量控制表Quality control table for erection of flare and exhaust shaft项 目:Project装 置:Unit工 号:Section位 号Location No.名 称Name规 格Specification材 质Material设计温度Design temp执行标准Standard for execution检 查 项 目Inspection item等级Grade签 名/日 期Signature/date施工单位Subcontractor监理单位建设单位Owner材料接收Acceptance of materialC焊接工艺及焊工资格认定Welding process and welders qualificationB基础复查Check of foundationC钢架几何尺寸检查Inspection of dimensions of steel frameCR焊接前检查before weldingC焊缝外观检查Visual Inspection of weldC焊缝无损检测Non-destructive testing of weldAR钢架焊接检查Welds of steel frameC火炬头检查Inspection of flare headA 安装Erection吊装前检查Inspection before hoistingC标高中心线方位确认Affirmation of elevation center-line orientationC垂直度检查Inspection of verticalityCR灌浆前检查Inspection before grouting AR附注:Remarks表221大型储罐组装工序质量控制表Quality control table for assembling large storage tank 项 目:Project装 置:Unit工 号:Section位 号Location No.名 称Name规 格Specification材 质Material工作介质Medium设计压力Design pressure MPa设计温度Design temp执行标准Standard for execution检 查 项 目Inspection item等级Grade签 名/日 期Signature/date施工单位Subcontractor监理单位建设单位Owner材料接收 Acceptance of materialC焊接工艺及焊工资格认定Welding process and welders qualificationB基础复查Check of foundationC几何尺寸检查Geometric dimensions CR开孔方位检查Opening orientationC焊缝外观检查Visual Inspection of weldC无损检测Non-destructive testing AR梯子、平台、栏杆、附件检查Ladder. platform, handrail accessoriesC封闭前检查Inspection before enclosingA安全阀、呼吸阀检查Safety breathing valve B罐底严密性试验Air-tight test of tank bottom BR罐体强度试验Tank body strength test BR罐体严密性试验Air-tight test of tank body BR单盘板、内浮盘板严密性试验Air-tight test of single tray and inner floating tray BR船舱严密性试验Air-tight test of cabin BR焊缝试漏检查leakage test of weld BR稳定性试验Stability test B升降试验Ascending descending test AR基础沉降观测Observation of foundation settlement AR几何尺寸检查记录 Inspection record of geometric dimensions (mm)检查部位Inspection location允差Tolerance偏差Deviation罐体高度Tank height 罐底底圈水平半径Radius of tank bottom circle罐底局部凹凸度Tank bottom local unevenness罐壁垂直度(mm/m)Tank wall verticality罐壁内表面局部凹凸度Internal wall surface unevenness单顶浮盘板局部凹凸度Single roof floating tray local unevenness内浮顶内浮盘板局部凹凸度Internal floating roof inner floating tray local unevenness拱顶局部凹凸度Dome roof local unevenness备注:Remarks表222气柜组装工序质量控制表Quality control table for assembling procedures of gas holder 项 目:Project装 置:Unit工 号:Section位 号Location No.工作介质Medium名 称Name设计压力Design pressure MPa规 格Specification设计温度Design temp 材 质Material执行标准Standard for execution 等 级检 查 项 目Inspection itemGrade签 名/日 期Signature/date施工单位Subcontractor监理单位建设单位Owner材料及配件接收 Acceptance of material componentsC焊接工艺及焊工资格认定Welding process welders qualificationBR基础复查Check of foundationC底板严密性试验Air-tight test of bottom plateAR几何尺寸检查Geometric dimensions CR开孔方位检查Opening orientationC导轨预制、安装Prefabrication installation of guide railC焊缝外观检查Visual Inspection of weldC无损检测Non-destructive testing BR梯子、平台检查Ladder and platform,C封闭前检查Inspection before enclosingA安全装置检查Safety deviceB水槽注水试验Water filling test of water tankAR钟罩、中节气密试验Air-tight rest of bottom plateAR快速升降试验Fast ascending descending test A基础沉降观测Observation of foundation settlement AR几何尺寸检查记录 Inspection record of geometric dimensions (mm)允 差Tolerance罐 底Holder bottom水槽壁Water tank wall中 节Intermediate section钟 罩Dome1234直径偏差Diameter deviation垂直度偏差Verticality deviation局部凹凸度Local unevenness备注:Remarks表223管式工业炉安装工序质量控制表Quality control table for installingprocedures of tubular industrial furnace 项 目:Project装 置:Unit工 号:Section位 号Location No.名 称Name能 力Capacity设计温度Design temp 设计压力Design pressure MPa燃料种类Kind of fuel执行标准Standard for execution检 查 项 目Inspection item等级Grade签 名/日 期Signature/date施工单位Subcontractor监理单位建设单位Owner设备材料接收 Acceptance of material componentsC基础复查Check of foundationC炉体(或柱)找正Alignment of furnace bodyC柱灌浆前检查Inspection of column footing before groutingA墙板安装Erection of wall panelB予焊件焊接Welding of prewelded componentB焊接工艺及焊工资格认定Welding process welders qualificationBR辐射管安装Installation of radiation tubeC集气管安装Installation of headerC对流管安装Installation of convection tubeC无损检测Non-destructive testingAR焊缝热处理Heat-treatment of weldBR吊架调整Adjustment of hangerC胀 管Expanding tubeCR压力试验Pressure testAR烧嘴及其它辅件安装Installation of burner and accessoriesC烘炉前检查Inspection before drying of furnaceA试验部位Test location强度试验Strength test严密性试验Air-tight test结 果Result日 期Date介 质Medium压 力Pressure(MPa)时 间Duration(min)介 质Medium压 力Pressure(MPa)时 间Duration(min)备注:Remarks表224胀 管 记 录Record of expanded tube项 目:Project装 置:Unit工 号:Section位 号Location No.名 称Name部 位Location管材Tube material硬度Hardness选定胀管率范围Selected range of expansion rate板材Plate material硬度Hardness执行标准Standard for execution编号Code No.管板Tube palte炉管boiler tube胀 管Expanded tube 内壁检查

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论