课件参考教程16ut presentaion_第1页
课件参考教程16ut presentaion_第2页
课件参考教程16ut presentaion_第3页
课件参考教程16ut presentaion_第4页
课件参考教程16ut presentaion_第5页
已阅读5页,还剩22页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、PD PRESENTATION FOR PFIZER DIAMOND PROJECT Energy and UtilityJune 8th-2015 CATALOG- General instruction-Energy and utility capacity summary-Energy resources from CUB-Energy resources from other building-HVAC system and equipmentA- Birds view rendering B-Functional site plan layoutC-Building list for

2、 site planD-Energy and utility systems in site- General instruction A-Birds view rendering Picture B-Functional site plan layout Picture No.NameA01Head BlockP02ProductionW03Warehouse & CUBG05East GuardhouseG06North GuardhouseS07Chemical STF08Pump Room & WWTB10Bike Shed C-Building list for site plan

3、D-Energy and utility systems in siteNo.System Description EquipmentRemark1Power supplyPower transformer2Fire protection power supplyDual feeder3Emergency power supplyThe standby power supply (10kv)two road 10 kv are 100% spare4Emergency power supply for emergency lighitngEPS 80KVA5Emergency power su

4、pply for ITUPS 175KVA6Air condition system45 sets MAUs or AHUs7Dust collect system10 sets dust collector8General ventilationSeveral Fans D-Energy and utility systems in siteNo.System Description EquipmentRemark9Smoke extraction Several Fans10Potable water for life(for toilet stool)Municipal(gray wat

5、er)gray water for toilet stool11Potable water for productionProduction water pumpsone work,one standby12Cooling water systemProduction Cooling water system;Warehouse Cooling water system;13Hot water systemHot water for life;Hot water for production;Solar hot water system14Water pondFire water pond;F

6、ire protection emergency pool;Production emergency pool D-Energy and utility systems in siteNo.System Description EquipmentRemark15Water for irrigationReclaimed water from storm16Process compressed air systemOil free compressor, adsorption dryer, stainless tank, filter17General steam systemMunicipal

7、18Clean steam systemMunicipal, second steam generator19Chilled water systemChiller, pump20Hot water systemSteam-water heat exchanger unitFor W03/A01/P02 HVAC21Compressor heat-recycle systemCompressor, heat-recycle module,water-water heat exchanger unit - Energy and utility capacity summaryNo.System/

8、 equipment descriptionEquipment Capacity Total CapacityRemark1Power transformer4x2000kVA8000kVALoad factor 89%,86%,79%,79%2Fire protection power supplyDual feeder3Emergency power supplyThe standby power supply (10kv)two road 10 kv are 100% spare4EPS P02: 60kVA A01:15kVAW03:5kVA 80kVA5UPSP02: 1x40kVA

9、 + 7x15kVa A01:2x10kVAW03:10 kVA 175kVA - Energy and utility capacity summaryNo.System/ equipment descriptionEquipment Capacity Total CapacityRemark6MAU+AHUCooling load :6200kwHeating load:3100kwHumidification : Clean Steam:0.85T/h Municipal Steam:0.3T/hP02:0.85T/h A01,W03 :0.3T/h 7Dust Collector10

10、sets (A01:1 set;P02:9 set)P02:39500 CMHA01:2000 CMH8General ventilationSeveral FansA01:8000 CMH P02:64450 CMHW03:810 CMH9Smoke extraction Several FansA01:50000 CMHP02:293400 CMHW03:245000 CMH10Cooling towerTower: Q=500m/h, P=18.5kw 3 set Pump: Q=490m/h, H=28m, P=55kw 4 set 3+0+03+1+0W03 - Energy and

11、 utility capacity summaryNo.System/ equipment descriptionEquipment Capacity Total CapacityRemark11Cooling towerTower:110m/h, P=5.5kW,1set Pump:35m/hx3, H=30m, P=7.5kw 3 set1+0+02+1+0P0212Hot water for lifeSupply Pump:Q=11.6m/h, P=1.5kw 2 set; Circulate Pump:Q=1.5m/h, P=0.55kw,2 set 1+1+01+1+0P0213Ho

12、t water for productionSupply Pump:30m/ h, P=3kw, 2 setCirculate Pump, Q=2.5m/ h, P=0.55kw,2 set 1+1+01+1+0P0214Fire protection emergency pool 1300m1300mP02 B115Production emergency pool1000m1000mP02 B1 - Energy and utility capacity summaryNo.System/ equipment descriptionEquipment Capacity Total Capa

13、cityRemark16Fire water pond2 750m 1500 m3F0817Storm water collection : /Outdoor18Solar hot water system:Heat collector on the roof Supply pump:Q=2m/h,,P=1.1kw; 2 setCirculate pump:Q=5m/h,P=2.2kw; 4 set1+1+02+2+0A0119Waste water treatment system andgray water /F08 - Energy and utility capacity summar

14、yNo.System/ equipment descriptionEquipment Capacity Total CapacityRemark20Automatic booster production waterSupply pump:Q=30m/h,,P=7.5kw; 2 set1+1+0F0821Compressor3x36m/min108m/min2+1+1P0222Adsorption dryer3x40m/min120m/min2+1+1P0223Stainless tank10m,3m,8m13bar21mP0224Primary air filter3x40m/min120m

15、/min2+1+1P02 - Energy and utility capacity summaryNo.System/ equipment descriptionEquipment Capacity Total CapacityRemark25Medium air filter3x40m/min120m/min2+1+1P0226After air filter2x40m/min80m/min1+1+1P0227Compressor heat recycle module3x200kW600kW2+1+1P02supplied by compressor manufacturer28Wate

16、r-water heat exchanger unit600kW600kWFor compressor heat recycle system;P02 - Energy and utility capacity summaryNo.System/ equipment descriptionEquipment Capacity Total CapacityRemark29Steam-water heat exchanger unit2200kW2200kWFor P02 HVAC hot water;P0230Chiller3x650RT1950RT3+0+1W0331Water-water h

17、eat exchanger unit2300kW2300kWWinter energy saving heat exchanger;W0332Cooling water pump4x490m/h1960m/h3+1+2W03 - Energy and utility capacity summaryNo.System/ equipment descriptionEquipment Capacity Total CapacityRemark33Chilled water pump(primary)4x340m/h1360m/h3+1+2W0334Chilled water pump(second

18、y)3x300m/h900m/h2+1+1W032x110m/h220m/h1+1+0W032x190m/h380m/h1+1+0W032x150m/h300m/h1+1+0W03 - Energy and utility capacity summaryNo.System/ equipment descriptionEquipment Capacity Total CapacityRemark35Steam-water heat exchanger unit600kW600kWFor W03 HVAC hot water;W0336Steam-water heat exchanger uni

19、t600kW600kWFor A01 HVAC hot water;A0137General steamP02 process 3.3t/hP02 HVAC heating 3.8t/hA01 HVAC heating and humidification 1.2t/hW03 HVAC heating and humidification 0.9t/hF08 heating 7t/h;16.2t/hFrom municipal38Secondy steam generator2x450 kg/h0.9t/hFor P02 HVAC humidification -Energy resource

20、s from CUBNo.Equipment NameDescriptionRemark1Power supplyPower transformer,4x2000kVA2Fire protection power supplyDual feeder3Emergency power supplyThe standby power supply (10kv)two road 10 kv are 100% spare4Cooling towerAdopt open reverse-flow cooling tower which is certified by FMIn/out temp=32/37

21、,tower:110m/h,P=5.5kW,1setpump:35m/hx3,h=30m,p=7.5kw 3set2+1+05ChillerCapacity=650RT,Power=400kWChilled water in/out temp=12/6,Cooling water in/out temp=32/373+0+16Water-water heat exchanger unitCapacity=2300kW,Primary side in/out temp=4/9,Secondy side in/out temp=12/6winter energy saving heat excha

22、nger -Energy resources from CUBNo.Equipment NameDescriptionRemark7Cooling water pumpFlow rate=490m/h,head=28mFluid temp=32,Power=55kW3+1+28Chilled water pump(primary)Flow rate=340m/h,head=18mFluid temp=12,Power=30kW3+1+29Chilled water pump(secondy)Flow rate=300m/h,head=22mFluid temp=6,Power=37kW2+1+

23、1Flow rate=110m/h,head=40mFluid temp=6,Power=22kW1+1+0Flow rate=190m/h,head=22mFluid temp=6,Power=18.5kW1+1+0Flow rate=150m/h,head=18mFluid temp=6,Power=15kW1+1+010Steam-water heat exchanger unitCapacity=600kW,Primary side 0.4MPa steam,Secondy side in/out temp=40/50Pump:flow rate=30m/h,head=22m,Unit

24、 Power=16kWFor W03 HVAC IV -Energy resources from other buildingsNo.Equipment NameDescriptionRemark1FAN Ventilation for storge2SPILT CONDITIONERAdopted in guard house3Storm water collection : Collect rainwater from the roof of warehouse and prodcution building and used as irrigation water and sight

25、water; located in the east and north of siteoutdoor4Solar hot water system:Hot water for life in Head Block is produced by solar energy as well as electricity A015Waste water treatment system andgray water Treat production wastewater and flushing wastewater;Treated gray water is used as toliet- flus

26、hing water and supplement water for cooling towerF086automatic booster production waterWater consumption for half day is stored;only used when municipal pressure is underpressure. F08 IV -Energy resources from other buildingsNo.Equipment NameDescriptionRemark7Cooling towerAdopt open reverse-flow coo

27、ling tower which is certified by FMP028hot water for lifeAdopt PHE, heat soucre is steam condensation water, supply temp. is 55-60 Supply pump:Q=11.6m/h,P=1.5kw 2 set; Circulate pump:Q=1.5m/h,P=0.55kw,2 set P029hot water for productionAdopt PHE, heat soucre is steam condensation water, supply temp.

28、is 55-60 Supply pump:30m/h,P=3kw, 2 setCirculate pump:Q=2.5m/h,P=0.55kw,2 set 10Fire water pondone time water consumption 1500 m311Fire protection emergency pool 1300m,fire protection wastewater is stored.P02 B1 IV -Energy resources from other buildingsNo.Equipment NameDescriptionRemark12Production

29、emergency pool1000m Store production wastewater when theres malfunction in wwtP02 B113CompressorOil free,Flow rate=36m/min,Pressure=7.5bar,Power=200kW2+1+1P0214Adsorption dryerFlow rate=40m/min,Pressure =7.5bar,PDP-40,Power=24kW2+1+1P0215Primary air filterFlow rate=40m/min,Pressure=7.5barOil0.1ppm,d

30、ust1.0m2+1+1P0216Medium air filterFlow rate=40m/min,Pressure=7.5bardust0.45m2+1+1P0217After air filterFlow rate=40m/min,Pressure=7.5bardust0.22m1+1+1P02 IV -Energy resources from other buildingsNo.Equipment NameDescriptionRemark18Compressor heat recycle moduleCapacity=200kW,Pump:flow rate=6m/h,head=35m,Unit Power=5kW2+1+1P02supplied by compressor manufacturer19Water-water heat exchanger unitCapacity=600kW,Primary side in/out temp=75/45Secondy side in/out temp=40/50Pump:flow rate=30m/h,head=22m,Unit Power=16kWFor P02 HVAC20Steam-water heat exchanger unitCapacity

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论