工程名称:,,,,,,,,,,,,,,,表10-11-1,

序号,负荷名称,电压(kV),单机容量(kW),设备台数,,设备容量,,需用系数KC,cos(φ),tg(φ),设备计算容量,,,年利用小时数,电耗(kW.h),附注

,,,,总计,工作,总计(kW),工作(kW),,,,有功功率(kW),无功功率(kvar),视在功率(kVA),,,

一,井下,,,,,,,,,,,,,,,

(一),中央变电所,,,,,,,,,,,,,,,

,胶带机配电室,,,,,,,,,,,,,,,

1,中央水泵房水泵(正常涌水),10,500,3,1,1500.00,500.00,0.95,0.85,0.62,475.00,294.38,558.82,4000,1900000,

2,中央水泵房水泵(最大涌水),10,500,3,2,1500.00,1000.00,0.95,0.85,0.62,950.00,588.76,1117.65,4000,3800000,

3,上仓胶带输送机,10,400,1,1,260.00,260.00,0.70,0.80,0.75,182.00,136.50,227.50,5280,960960,

4,2号煤1#胶带输送机,0.69,51,1,1,51.00,51.00,0.70,0.80,0.75,35.70,26.78,44.63,5280,188496,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.22,

5,2号煤2#胶带输送机,0.69,138,1,1,138.00,138.00,0.70,0.80,0.75,96.60,72.45,120.75,5280,510048,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.60,

6,2号煤3#胶带输送机,0.69,260,1,1,260.00,260.00,0.70,0.80,0.75,182.00,136.50,227.50,5280,960960,

,选用变压器,,,,,,,,,,,,,一台315kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.72,

,合计(正常涌水时),,,7,5,2209.00,1209.00,,,,1425.00,883.14,1676.47,,8320465,

,合计(最大涌水时),,,7,6,2209.00,1709.00,,,,1425.00,883.14,1676.47,,,

1,井下主运输系统,0.69,,7,7,229.60,229.6,0.70,0.80,0.75,160.72,120.54,200.90,5280,848602,

2,中央水泵房,0.69,,21,19,452,188,0.75,0.85,0.62,141.00,87.38,165.88,4000,564000,

3,主井井底,0.69,,8,8,113,113,0.70,0.70,1.02,79.10,80.70,113.00,2000,158200,

4,副井井底,0.69,,2,2,55.4,55.4,0.70,0.70,1.02,38.78,39.56,55.40,2000,77560,

5,蓄电机车充电室,0.69,,,,30.00,30.00,0.80,0.85,0.62,24.00,14.87,28.24,3000,72000,

6,电力牵引机车,0.69,110,2,2,220.00,220.00,0.70,0.80,0.75,154.00,115.50,192.50,5280,813120,

,合计(正常涌水时),,,40,38,1100.00,836.00,,,,597.60,458.56,753.26,,2533482,

,合计(最大涌水时),,,40,38,1100.00,836.00,,,,597.60,458.56,753.26,,,

,选用变压器,,,,,,,,,,,,,两台630kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.89,

(二),2煤采区变电所,,,,,,,,,,,,,,,

,2号煤综采工作面一,,,,,,,,,,,,,,,

1,采煤机,1.20,312,1,1,312.00,312.00,0.65,0.70,1.02,202.80,206.90,289.71,5280,1070784,

,选用变压器,,,,,,,,,,,,,一台315kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.92,

2,刮板输送机,1.20,75,2,2,150.00,150.00,0.70,0.70,1.02,105.00,107.12,150.00,5280,554400,

3,转载机,1.20,75,1,1,75.00,75.00,0.60,0.70,1.02,45.00,45.91,64.29,5280,237600,

4,乳化液泵,1.20,75,2,1,150.00,75.00,0.60,0.70,1.02,45.00,45.91,64.29,5280,237600,

5,喷雾泵,1.20,22,2,1,44.00,22.00,0.60,0.65,1.17,13.20,15.43,20.31,5280,69696,

,合计(正常涌水时),,,7,5,419,322,,,,208.2,214.372302,298.84,,1099296,

,合计(最大涌水时),,,7,5,419,322,,,,208.2,214.372302,298.84,,,

,选用变压器,,,,,,,,,,,,,一台500kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.60,

6,可伸缩胶带机,1.20,90,2,2,180.00,180.00,0.70,0.70,1.02,126.00,128.55,180.00,5280,665280,

7,破碎机,1.20,110,1,1,110.00,110.00,0.70,0.70,1.02,77.00,78.56,110.00,4000,308000,

,合计(正常涌水时),,,3,3,290.00,290.00,,,,203,207.1014244,290.00,,973280,

,合计(最大涌水时),,,3,3,290.00,290.00,,,,203,207.1014244,290.00,,,

,选用变压器,,,,,,,,,,,,,一台500kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.58,

8,注水泵,0.69,30,2,1,60.00,30.00,0.70,0.70,1.02,21.00,21.42,30.00,5280,110880,

9,探水钻,0.69,22,2,1,44.00,22.00,0.60,0.65,1.17,13.20,15.43,20.31,5280,69696,

10,移动式注氮设备,0.69,90,1,1,90.00,90.00,0.60,0.65,1.17,54.00,63.13,83.08,5280,285120,

,合计(正常涌水时),,,5,3,194.00,142.00,,,,88.20,99.99,133.33,,465696,

,合计(最大涌水时),,,5,3,194.00,142.00,,,,88.20,99.99,133.33,,,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.67,

11,小水泵,0.69,15,2,2,30.00,30.00,0.60,0.65,1.17,18.00,21.04,27.69,5280,95040,

12,注水钻机,0.69,22,1,1,22.00,22.00,0.60,0.65,1.17,13.20,15.43,20.31,5280,69696,

13,回柱绞车,0.69,22,2,2,44.00,44.00,0.70,0.80,0.75,30.80,23.10,38.50,5280,162624,

,合计(正常涌水时),,,16,12,574.00,470.00,,,,292.40,322.69,435.46,,327360,

,合计(最大涌水时),,,16,12,574.00,470.00,,,,292.40,322.69,435.46,,,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,2.18,

14,无极绳连续牵引车,0.69,110,1,1,110.00,110.00,0.70,0.80,0.75,77.00,57.75,96.25,5280,406560,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.48,

15,调度绞车,0.69,11.4,4,4,45.60,45.60,0.70,0.80,0.75,31.92,23.94,39.90,5280,168538,

,选用变压器,,,,,,,,,,,,,一台100kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.40,

,2煤巷综掘工作面(2个),,,,,,,,,,,,,,,

1,可伸缩胶带机,1.20,80,2,2,160.00,160.00,0.70,0.70,1.02,112.00,114.26,160.00,5280,591360,

2,掘进机,1.20,140,2,2,280.00,280.00,0.65,0.70,1.02,182.00,185.68,260.00,5280,960960,

3,桥式胶带转载机,1.20,11,2,2,22.00,22.00,0.70,0.70,1.02,15.40,15.71,22.00,5280,81312,

,合计(正常涌水时),,,6,6,462.00,462.00,,,,309.40,315.65,442.00,,1633632,

,合计(最大涌水时),,,6,6,462.00,462.00,,,,309.40,315.65,442.00,,,

,选用变压器,,,,,,,,,,,,,一台630kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.70,

1,小水泵,0.69,15,2,1,30.00,15.00,0.60,0.65,1.17,9.00,10.52,13.85,5280,47520,

2,锚杆打眼安装机,0.69,11,2,1,22.00,11.00,0.70,0.70,1.02,7.70,7.86,11.00,5280,40656,

3,调度绞车,0.69,11.4,4,3,45.60,34.20,0.70,0.80,0.75,23.94,17.96,29.93,5280,126403,

4,探水钻,0.69,22,2,1,44.00,22.00,0.60,0.65,1.17,13.20,15.43,20.31,5280,69696,

5,井底车场调度绞车,0.69,11.4,4,4,45.60,45.60,0.70,0.80,0.75,31.92,23.94,39.90,5280,168538,

6,连续牵引车,0.69,110,3,3,330.00,330.00,0.70,0.80,0.75,231.00,173.25,288.75,5280,1219680,

8,湿式除尘器,0.69,42.5,2,2,85.00,85.00,0.70,0.80,0.75,59.50,44.63,74.38,5280,314160,

9,煤电钻,0.13,1.2,4,2,4.80,2.40,0.60,0.65,1.17,1.44,1.68,2.22,5280,7603,

,合计(正常涌水时),,,23,17,607.00,545.20,,,,377.70,295.26,479.41,,1994256.00,

,合计(最大涌水时),,,23,17,607.00,545.20,,,,377.70,295.26,479.41,,,

,选用变压器,,,,,,,,,,,,,一台630kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.76,

1,局部通风机,0.69,11,4,4,44.00,44.00,0.70,0.80,0.75,30.80,23.10,38.50,5280,162624,

,选用变压器,,,,,,,,,,,,,两台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.19,

(三),11煤采区变电所,,,,,,,,,,,,,,,

,11煤巷综掘工作面(1个),,,,,,,,,,,,,,,

1,可伸缩胶带机,1.20,80,1,1,80.00,80.00,0.70,0.70,1.02,56.00,57.13,80.00,5280,295680,

2,掘进机,1.20,140,1,1,140.00,140.00,0.65,0.70,1.02,91.00,92.84,130.00,5280,480480,

3,桥式胶带转载机,1.20,11,1,1,11.00,11.00,0.70,0.70,1.02,7.70,7.86,11.00,5280,40656,

,合计(正常涌水时),,,3,3,231.00,231.00,,,,154.70,157.83,221.00,,816816,

,合计(最大涌水时),,,3,3,231.00,231.00,,,,154.70,157.83,221.00,,,

,选用变压器,,,,,,,,,,,,,一台315kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.70,

1,小水泵,0.69,15,1,1,15.00,15.00,0.60,0.65,1.17,9.00,10.52,13.85,5280,47520,

2,锚杆打眼安装机,0.69,11,1,1,11.00,11.00,0.70,0.70,1.02,7.70,7.86,11.00,5280,40656,

3,调度绞车,0.69,11.4,2,2,22.80,22.80,0.70,0.80,0.75,15.96,11.97,19.95,5280,84269,

4,探水钻,0.69,22,2,2,44.00,44.00,0.60,0.65,1.17,26.40,30.87,40.62,5280,139392,

5,湿式除尘器,0.69,42.5,1,1,42.50,42.50,0.70,0.80,0.75,29.75,22.31,37.19,5280,157080,

6,煤电钻,0.13,1.2,1,1,1.20,1.20,0.60,0.65,1.17,0.72,0.84,1.11,5280,3802,

,合计(正常涌水时),,,8,8,136.50,136.50,,,,89.53,84.37,123.02,,472718.40,

,合计(最大涌水时),,,8,8,136.50,136.50,,,,89.53,84.37,123.02,,,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.62,

5,井底车场调度绞车,0.69,11.4,4,4,45.60,45.60,0.70,0.80,0.75,31.92,23.94,39.90,5280,168538,

6,连续牵引车,0.69,110,3,3,330.00,330.00,0.70,0.80,0.75,231.00,173.25,288.75,5280,1219680,

,合计(正常涌水时),,,7,7,375.6,375.6,,,,262.92,197.19,328.65,,1388218,

,合计(最大涌水时),,,7,7,375.6,375.6,,,,262.92,197.19,328.65,,,

,选用变压器,,,,,,,,,,,,,一台500kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.66,

,11煤巷普掘工作面(1个),,,,,,,,,,,,,,,

1,湿式除尘器,0.69,42.5,1,1,42.50,42.50,0.70,0.80,0.75,29.75,22.31,37.19,5280,157080,

2,锚杆打眼安装机,0.69,11,1,1,11.00,11.00,0.70,0.70,1.02,7.70,7.86,11.00,5280,40656,

3,井底车场调度绞车,0.69,11.4,1,1,11.40,11.40,0.70,0.80,0.75,7.98,5.99,9.98,5280,42134,

5,调度绞车,0.69,11.4,2,2,22.80,22.80,0.70,0.80,0.75,15.96,11.97,19.95,5280,84269,

6,小水泵,0.69,15,1,1,15.00,15.00,0.60,0.65,1.17,9.00,10.52,13.85,5280,47520,

7,探水钻,0.69,22,1,1,22.00,22.00,0.60,0.65,1.17,13.20,15.43,20.31,5280,69696,

8,喷射机,0.69,5.5,1,1,5.50,5.50,0.60,0.65,1.17,3.30,3.86,5.08,5280,17424,

9,搅拌机,0.69,3,1,1,3.00,3.00,0.70,0.80,0.75,2.10,1.58,2.63,5280,11088,

10,煤电钻,0.13,1.2,2,2,2.40,2.40,0.60,0.65,1.17,1.44,1.68,2.22,5280,7603,

,合计(正常涌水时),,,11,11,135.6,135.6,,,,90.43,81.19,121.53,,477470,

,合计(最大涌水时),,,11,11,135.6,135.6,,,,90.43,81.19,121.53,,,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.61,

11,可伸缩胶带输送机,1.20,80,1,1,80.00,80.00,0.70,0.80,0.75,56.00,42.00,70.00,5280,295680,1

12,桥式胶带转载机,1.20,11,1,1,11.00,11.00,0.70,0.80,0.75,7.70,5.78,9.63,5280,40656,2

,合计(正常涌水时),,,2,2,91,91,,,,63.7,47.775,79.63,,336336,

,合计(最大涌水时),,,2,2,91,91,,,,63.7,47.775,79.63,,,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.40,

1,11#普掘局部通风机,0.69,60,4,2,240.00,120.00,0.70,0.80,0.75,84.00,63.00,105.00,5280,443520,

2,11#综掘局部通风机,0.69,30,4,2,120.00,60.00,0.70,0.80,0.75,42.00,31.50,52.50,5280,221760,

,合计(正常涌水时),,,8,4,360,180,,,,126,94.5,157.50,,665280,

,合计(最大涌水时),,,8,4,360,180,,,,126,94.5,157.50,,,

,选用变压器,,,,,,,,,,,,,两台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.79,

,11号煤综采工作面,,,,,,,,,,,,,,,

1,采煤机,1.20,600,1,1,600.00,600.00,0.65,0.70,1.02,390.00,397.88,557.14,5280,2059200,

,选用变压器,,,,,,,,,,,,,一台1000kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.56,

2,刮板输送机,1.20,110,2,2,220.00,220.00,0.70,0.70,1.02,154.00,157.11,220.00,5280,813120,

3,破碎机,1.20,110,1,1,110.00,110.00,0.70,0.70,1.02,77.00,78.56,110.00,4000,308000,

4,乳化液泵,1.20,250,1,1,250.00,250.00,0.60,0.70,1.02,150.00,153.03,214.29,5280,792000,

5,喷雾泵站,1.20,55,1,1,55.00,55.00,0.60,0.70,1.02,33.00,33.67,47.14,5280,174240,

,合计(正常涌水时),,,5,5,635.00,635.00,,,,414.00,422.36,591.43,,2087360,

,合计(最大涌水时),,,5,5,635.00,635.00,,,,414.00,422.36,591.43,,,

,选用变压器,,,,,,,,,,,,,一台800kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.74,

6,可伸缩胶带机,1.20,125,1,1,125.00,125.00,0.70,0.70,1.02,87.50,89.27,125.00,5280,462000,

7,转载机,1.20,132,1,1,132.00,132.00,0.60,0.70,1.02,79.20,80.80,113.14,5280,418176,

,合计(正常涌水时),,,2,2,257.00,257.00,,,,166.70,170.07,238.14,,880176,

,合计(最大涌水时),,,2,2,257.00,257.00,,,,166.70,170.07,238.14,,,

,选用变压器,,,,,,,,,,,,,一台315kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.76,

8,探水钻,0.69,22,1,1,22.00,22.00,0.60,0.65,1.17,13.20,15.43,20.31,5280,69696,

9,小水泵,0.69,15,2,2,30.00,30.00,0.60,0.65,1.17,18.00,21.04,27.69,5280,95040,

10,注水钻机,0.69,22,1,1,22.00,22.00,0.60,0.65,1.17,13.20,15.43,20.31,5280,69696,

11,注水泵,0.69,30,2,2,60.00,60.00,0.60,0.65,1.17,36.00,42.09,55.38,5280,190080,

12,回柱绞车,0.69,22,2,2,44.00,44.00,0.70,0.80,0.75,30.80,23.10,38.50,5280,162624,

,合计(正常涌水时),,,8,8,178.00,178.00,,,,111.20,117.10,161.48,,587136,

,合计(最大涌水时),,,8,8,178.00,178.00,,,,111.20,117.10,161.48,,,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.81,

13,调度绞车,0.69,11.4,2,2,22.80,22.80,0.70,0.80,0.75,15.96,11.97,19.95,5280,84269,

14,无极绳连续牵引车,0.69,110,1,1,110.00,110.00,0.70,0.80,0.75,77.00,57.75,96.25,5280,406560,

,合计(正常涌水时),,,3,3,132.80,132.80,,,,92.96,69.72,116.20,,490829,

,合计(最大涌水时),,,3,3,132.80,132.80,,,,92.96,69.72,116.20,,,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.58,

15,调度绞车,0.69,11.4,2,2,22.80,22.80,0.70,0.80,0.75,15.96,11.97,19.95,5280,84269,

16,移动式注氮设备,0.69,90,1,1,90.00,90.00,0.60,0.65,1.17,54.00,63.13,83.08,5280,285120,

,合计(正常涌水时),,,3,3,112.80,112.80,,,,69.96,75.10,102.64,,369389,

,合计(最大涌水时),,,3,3,112.80,112.80,,,,69.96,75.10,102.64,,,

,选用变压器,,,,,,,,,,,,,一台200kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.51,

,,,,,,,,,,,,,,,,,

,井下合计(正常涌水时),,,181,159,9725,7966,,,,5946,5099,7832.75,,30156289,

,井下合计(最大涌水时),,,181,160,9725,8466,,,,5946,5099,7832.75,,,

,,,,,,,,,,,,,,,,,

二,地面,,,,,,,,,,,,,,,

,变电所及配电室,,,,,,,,,,,,,,,

,(一)副井场地变电所,,,,,,,,,,,,,,,

1,锅炉房,0.38,230,1,1,230.00,230.00,0.65,0.75,0.88,149.50,131.85,199.33,5280,789360,

2,副井井口房,0.38,66.8,1,1,66.80,66.80,0.70,0.70,1.02,46.76,47.70,66.80,3000,140280,

3,副井提升机,0.38,315,1,1,1260.00,1260.00,0.85,0.85,0.62,1071.00,663.75,1260.00,8700,9317700,

4,加压泵房,0.38,120,1,1,120.00,120.00,0.75,0.80,0.75,90.00,67.50,112.50,1750,157500,

5,井下水处理站,0.38,130,1,1,130.00,130.00,0.70,0.70,1.02,91.00,92.84,130.00,1750,159250,

6,生活污水处理站,0.38,15.5,1,1,15.50,15.50,0.70,0.70,1.02,10.85,11.07,15.50,1750,18988,

7,工业场地水源井,0.38,110,2,2,220.00,220.00,0.70,0.70,1.02,154.00,157.11,220.00,1750,269500,

8,主井井口房,0.38,100,1,1,100.00,100.00,0.70,0.70,1.02,70.00,71.41,100.00,1750,122500,

9,主井空气加热室,0.38,55,1,1,55.00,55.00,0.60,0.65,1.17,33.00,38.58,50.77,1750,57750,

10,副井空气加热室,0.38,55,1,1,55.00,55.00,0.60,0.65,1.17,33.00,38.58,50.77,1750,57750,

11,联合建筑,0.38,300,1,1,300.00,300.00,0.70,0.70,1.02,210.00,214.24,300.00,1750,367500,

12,照明,0.38,30,1,1,30.00,30.00,0.65,0.75,0.88,19.50,17.20,26.00,1750,34125,

,,,,,,,,,,,,,,,,,

,小计,,,13,13,2582.30,2582.30,,0.79,,1978.61,1551.83,2514.57,,11492203,

,静电电容器补偿,,,,,,,,,,,-850.00,,,,

,补偿后,,,,,,,,0.94,,1978.61,701.83,2099.40,,,

,选用变压器,,,,,,,,,,,,,两台1600kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.90,

,(二)主井提升机房配电室,,,,,,,,,,,,,,,

1,带式输送机,10,315,2,2,630.00,630.00,0.70,0.80,0.75,441.00,330.75,551.25,5280,2328480,

,,,,,,,,,,,,,,,,,

,小计,,,2,2,630.00,630.00,,0.80,,441.00,330.75,551.25,,2328480,

,(三)机修车间变电所,,,,,,,,,,,,,,,

1,铆焊工段,0.38,192.15,14,14,192.20,192.20,0.30,0.65,1.17,57.66,67.41,88.71,3000,172980,

2,液压支架修理工段,0.38,292.3,15,15,292.30,292.30,0.30,0.65,1.17,87.69,102.52,134.91,3000,263070,

3,机加工段,0.38,58.51,9,9,58.51,58.51,0.30,0.65,1.17,17.55,20.52,27.00,3000,52659,

4,矿电修工段,0.38,154,16,16,154.00,154.00,0.30,0.65,1.17,46.20,54.01,71.08,3000,138600,

5,木材加工房设备,0.38,40.85,6,6,40.85,40.85,0.30,0.65,1.17,12.26,14.33,18.85,3000,36765,

6,办公楼用电,0.38,200,1,1,200.00,200.00,0.50,0.65,1.17,100.00,116.91,153.85,3000,300000,

,小计,,,61,61,937.86,937.86,,0.65,,321.358,375.709134,494.40,,964074,

,选用变压器,,,,,,,,,,,,,一台630kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.78,

,(四)地面生产系统变电所,,,,,,,,,,,,,,,

1,101带式输送机,0.38,132,1,1,132.00,132.00,0.70,0.80,0.75,92.40,69.30,115.50,3500,323400,

2,102电磁除铁器,0.38,4,1,1,4.00,4.00,0.70,0.80,0.75,2.80,2.10,3.50,500,1400,

3,103分级筛,0.38,45,1,1,45.00,45.00,0.70,0.80,0.75,31.50,23.63,39.38,3000,94500,

4,104捡矸带式输送机,0.38,22,1,1,22.00,22.00,0.70,0.80,0.75,15.40,11.55,19.25,2000,30800,

5,105破碎机,0.38,132,1,1,132.00,132.00,0.70,0.80,0.75,92.40,69.30,115.50,1500,138600,

6,106带式输送机,0.38,45,1,1,45.00,45.00,0.70,0.80,0.75,31.50,23.63,39.38,2500,78750,

7,107带式输送机,0.38,160,1,1,160.00,160.00,0.70,0.80,0.75,112.00,84.00,140.00,3500,392000,

8,108配仓刮板输送机,0.38,45,1,1,45.00,45.00,0.70,0.80,0.75,31.50,23.63,39.38,3500,110250,

9,电动闸门,0.38,0.8,8,8,6.40,6.40,0.70,0.80,0.75,4.48,3.36,5.60,3500,15680,

10,109配仓刮板输送机,0.38,45,1,1,45.00,45.00,0.70,0.80,0.75,31.50,23.63,39.38,3500,110250,

11,电动闸门,0.38,0.8,8,8,6.40,6.40,0.70,0.80,0.75,4.48,3.36,5.60,3500,15680,

12,110-119振动给煤机,0.38,6.6,12,12,79.20,79.20,0.70,0.80,0.75,55.44,41.58,69.30,3500,194040,

13,120矸石仓下给煤机,0.38,6.6,1,1,6.60,6.60,0.70,0.80,0.75,4.62,3.47,5.78,3500,16170,

14,121矸石带式输送机,0.38,22,1,1,22.00,22.00,0.70,0.80,0.75,15.40,11.55,19.25,3500,53900,

15,黄泥灌浆站,0.38,71,1,1,71.00,71.00,0.70,0.80,0.75,49.70,37.28,62.13,3500,173950,

15,行政生活区水源井,0.38,110,1,1,110.00,110.00,0.70,0.80,0.75,77.00,57.75,96.25,3500,269500,

16,电动葫芦,0.38,14.6,1,1,14.60,14.60,0.70,0.80,0.75,10.22,7.67,12.78,3500,35770,

17,电动葫芦,0.38,13.8,1,1,13.80,13.80,0.70,0.80,0.75,9.66,7.25,12.08,3500,33810,

,,,,,,,,,,,,,,,,,

,小计,,,43,43,960.00,960.00,,0.80,,672.00,504.00,840.00,,2088450,

,选用变压器,,,,,,,,,,,,,两台630kVA变压器,,

,负荷率β,,,,,,,,,,,,,,0.67,

,(五)压风机房配电室,,,,,,,,,,,,,,,

1,空气压缩机,10,250,4,3,1000.00,750.00,0

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论