




已阅读5页,还剩36页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Development and Results of theFirst Canadian Infrastructure Report CardDr. Guy Flio, P.Eng.OFNTSC RamaOctober 25, 2012BACKGROUNDProject Objective Develop a rigorous, repeatable assessment process for the condition of Canadas infrastructure to raise the awareness of the public, decision-makers and other stakeholders about current infrastructure issues and future trends. The results of this process would be published as a factual Infrastructure Report Card, not an advocacy document Project Started in July 2010 and report card expected to be published in September 2012.International Perspective Several countries, including the USA, the UK and Australia have produced, and continue to create on a regular basis state-of-the-infrastructure report cards. Although there are variations in how the letter grading is assigned, they all use a school type report to communicate the results. Most state of the infrastructure reports are aimed at awareness (the target audience may vary but in general includes the public and elected decision makers). The second main common objective of these studies is to influence senior government decisions. In terms of lessons learned, three key issues stand out: There needs to be rigorous evaluation (i.e., process) criteria from the beginning. Multidimensional stakeholder involvement (i.e., from regions, sectors, professions, etc.) is essential. No one should expect 100% accuracyInternational Perspective (continued)Canadian Examplessome elements show general signs of deterioration that require attention. A few elements exhibit significant deficiencies.WastewaterSystemsGOOD: ADEQUATE FOR NOWThe infrastructure in the system or network is in good to very good condition; some elements show general signs of deterioration that require attention. A few elements exhibit significant deficiencies.StormwaterSystemsVERY GOOD: FIT FOR THE FUTUREThe infrastructure in the system or network is generally in very good condition, typically new or recently rehabilitated. A few elements show general signs of deterioration that require attention.MunicipalRoadsFAIR: REQUIRES ATTENTIONThe infrastructure in the system or network is in fair to good condition; it shows general signs of deterioration and requires attention. Some elements exhibit significant deficiencies.Replacement costsAverage Median(2-lane km) (2-lane km)Highway $ 1, 854,000
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 教师招聘之《幼儿教师招聘》能力提升试题打印含答案详解【完整版】
- 教师招聘之《幼儿教师招聘》每日一练附答案详解(轻巧夺冠)
- 2025年教师招聘之《小学教师招聘》通关题库附答案详解【巩固】
- 渔业养殖疾病防控服务创新创业项目商业计划书
- 绿色汽车设计理念推广创新创业项目商业计划书
- 押题宝典教师招聘之《小学教师招聘》题库附参考答案详解(黄金题型)
- 动物保健品数字化营销平台创新创业项目商业计划书
- 教师招聘之《小学教师招聘》能力提升题库附参考答案详解【培优b卷】
- 2025年教师招聘之《小学教师招聘》综合提升测试卷及完整答案详解(典优)
- 2025内蒙古维拉斯托矿业有限公司招聘6名考试备考及答案详解(典优)
- YY/T 0719.10-2022眼科光学接触镜护理产品第10部分:保湿润滑剂测定方法
- YC/T 320-2009烟草商业企业管理体系规范
- GB/T 12755-1991建筑用压型钢板
- 燃气轮机介绍课件
- 2023年南京江宁交通建设集团有限公司招聘笔试模拟试题及答案解析
- 消防安全检查申报表
- 海飞丝销售策划书模板
- YYT 1244-2014 体外诊断试剂用纯化水
- 工程技术研究中心(重点实验室)可行性研究报告
- 城市轨道交通综合监控系统整套课件汇总完整版电子教案(全)
- 部编版五年级上册第一单元集体备课
评论
0/150
提交评论