




已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
翻译部分英文原文high productivity -a question of shearer loader cutting sequencesk.nienhaus,a.k.bayer & h. haut, aachen university of technology, ger1. abstractrecently, the focus in underground longwall coal mining has been on increasing the installed motor power of shearer loaders and armored face conveyors (afc) ,more sophisticated support control systems and longer face length , in order to reduce costs and achieve higher productivity .these efforts have resulted in higher output and previously unseen face advance rates. the trend towards “bigger and better ” equipment and layout schemes, however, is rapidly nearing the limitations of technical and economical feasibility. to realize further productivity increases, organizational changes of longwall mining procedures looks like the only reasonable answer. the benefits of opti-mised shearer sequences, leading to better performance, are discussed in this paper.2.introductionstraditionally, in underground longwall mining operations, shearer loaders produce coal using either one of the following cutting sequences: uni-directional or bi-directional cycles.besides these pre-dominant methods , alternative mining cycles have also been developed and successfully applied in underground hard coal mines all over the world. the half-web cutting cycle as e.g. utilized in rag coal internationals twenty mile mine in colorado, usa, and the “opti-cycle” of matlas south african shortwall operation must be mentioned in this context. other mines have also tested similar but modified cutting cycles resulting in improved output, e.g. improvements in terms of productivity increases of up to 40% are thought possible.whereas the mentioned mines are applying the alternative cutting methods according to their spe-cific conditions, e.g. seam height or equipment used, this paper looks systematically at the differ-ent methods from a generalized point of view. a detailed description of the mining cycle for each cutting technique, including the illustrations of productivitve and non-productive cycle times, will be followed by a brief presentation of the performed production capacity calculation and a summary of the technical restrictions of each system. standardised equipment classes for different seam heights are defined, after the most suitalble and most productive mining equipment for each class are selected .besides the technical parameters of the shearer loader and the afc ,the length of the long-wall face and the specific cutting energy of the coal are the main variables for each height class in the model . as a result of the capacity calculations, the different shearer cutting methods can be graphically compared in a standartdised way showing the productivity of each method. due to the general character of the model potential optimizations (resulting from changes in the cutting cycle and the benefits in terms of higher productivity of the mining operation) can be derived.3. state-of-the-art of shearer loader cutting sequences the question “why are different cutting sequences applied in longwall mining?” has to be answered , before discussing the significant characteristics in terms of operational procedures. the major constraints and reasons for or against a special cutting method are the seam height and hardness of the coal, the geotechnical parameters of the coal seam and the geological setting of the mine influencing the caving properties as well as the subsidence and especially the length of the longwall face. for each mining environment the application of either sequence results in different production rates and consequently advance rates of the face. the coal flow onto the afc is another point that varies like the loads on the shearer loader, especially the ranging arms and the stresses and the wear on the picks. a thorough analysis is necessary to choose the best-suited mining cycle ; therefore, general solutions do not guarantee optimal efficiency and productivity .a categorization of shearer loader cutting sequences is realized by four major parameters. firstly, one can separate between mining methods, which mine coal in two directions meaning from the head to the tailgate and on the return run as well or in one direction only. secondly, the way the mining sequence deals with the situation at the face ends, to advance face line after extracting the equivalent of a cutting web, is a characteristic parameter for each separate method. the necessary travel distance while sumping varies between the sequences, as does the time needed to per-form this task , too. another aspect defining the sequences is the proportion of the web cutting coal per run. whereas traditionally the full web was used, the introduction so modern afc and roof support automation control systems allows for efficient operations using half web methods. the forth parameter identifying state of the art shearer loader cutting sequences is the opening created per run. other than the partial or half-opening method like those used in matlas “opti-cycle”, the cutting height is equal to the complete seam height including parting s and soft hanging or footwall material.bi-directional cutting sequence the bi-directional cutting sequence, is characterized by two sumping operations at the face ends in a complete cycle, which is accomplished during both the forward and return trip. the whole longwall face advances each complete cycle at the equivalent of two web distances by the completion of each cycle. the leading drum of the shearer cuts the upper part of the seam while the rear drum cuts the bottom coal and cleans the floor coal. the main disadvantages of this cutting method are thought to be the unproductive time resulting from the face end activities and the complex operation. therefore, the trend in recent years was to increase face length to reduce the relative impact of sumping in favour of longer production time.uni-directional cutting sequencein contrast to the bi-directional method, the shearer loader cuts the coal in one single direction when in uni-directional mode. on the return trip, the floor coal is loaded and the floor itself cleaned. the shearer haulage speeds on the return trips are restricted only by the operators movement through the longwall face, or the haulage motors in a fully automated operation. the sumping procedure starts in near the head gate .the low machine utilization because of cutting just one web per cycle is the main disadvantage of the uni-directional cutting sequence. besides the coal flow can be quite irregular depending on the position of the shearer in the cycle.half web cutting sequence the main benefit of half web cutting sequences is the reduction of unproductive times in the mining cycle, which results in high machine utilization. this is achieved by cutting only a half web in mid face with bi-directional gate sequences. the full web is mined at the face ends, with lower speeds allowing faster shearer operation in both directions in mid seam. beside the realization of higher haulage speeds, the coal flow on the afcis more balanced for shearer loader trips in both directions.half-partial-opening cutting sequence the advantage of the half or more precisely, partial opening cutting sequence is the fact that the face is extracted in two passes. figure 2b shows that the upper and middle part of the seam is cut during the pass towards the tailgate. whereas the last part of this trip for the equivalent of a machine length the leading drum is raised to cut the roof to allow the roof support to be advanced .on the return trip the bottom coal is mined with the advantage of a free face and a smaller proportion of the leading drum cutting coal ; consequently leading to less restrictions of the haulage speed due to the specific cutting energy of the material . the shearer sumps in mid seam near the head gate to the full web without invoking unproductive cycle time. like for the trip the tailgate the leading drum has to be lowered a machine length ahead of the main gate.4.production capacity calculationsa theoretical comparison of the productivity between different mining methods in general , or in this case between different shearer loader cutting cycles, is always based on numerous assumptions and technical and geological restrictions. as a result , this production capacity calculation does not claim to offer exact results, although it does indicate productivity trends and certain parameters for each analyzed method. the model works with so-called height classes varying the seam thicknesses between 2m and 5m in steps of 50cm. equipment is assigned to each class, having been selected by looking at the best-suited technical properties available on the market. apart from the defined equipment , it is assumed that the seam is flat and no undulations or geological faults occur. in the model ,the ventilation and the roof support system represent no restrictions to the production. since the aim of this model is to show ways to further increases in longwall productivity ,the calculation is based on a fully automated system with no manual operators required at the face . the haulage speed of the shearer is therefore only restricted by that afc capacity ,the cutting motors and the haulage motors respectively. the variable parameters in this comparison of the four cutting sequences are ,the specific cutting energy of the coal to be cut and the length of the longwall face . the former varying between 0.2 and 0.4, the latter between 100m and 400m in 50m intervals. the 100m shortwalls were deliberately selected, since they are coming more into focus for various reasons. geotechnical aspects, like e.g. the caving ability of the hanging wall and faults, restrict long-wall panels in many places to maximum face lengths of 150m or less, like in south africa and great britain . for this reason , a detailed analysis of the potential of such longwalls is deemed appropriate.seam heightshearer loadercutting motor powerdrum diameterclearance area of slafcwidthconveying areamotor power2.0msl3002x480kw1500mm0.401332mm3x800kw2.5msl3002x480kw1600mm0.601332mm3x800kw3.0msl300/ sl5002x480kw2x750kw1800mm0.751332mm3x800kw3.5msl5002x750kw2000mm0.751332mm3x1000kw4.0msl5002x750kw2300mm1.01532mm3x1000kw4.5msl5002x750kw2500mm1.01532mm3x1000kw5.0msl5002x750kw2700mm1.01532mm3x1200kw sl5004.0m5. conclusionsin recent years much effort has been put into the optimization of longwall operations to increase productivity and efficiency. in many cases the emphasis of these improvement was mainly focused on the equipment , e.g. increased motor power or large dimensions of afcs .the organizational aspect has sometimes been neglected or did not rank as high on the agenda as other topics . in this paper , it has been demonstrated that the selected mining method has a significant impact on the achievable productivity.for each seam or height class a defined ser of equipment was used with consistent restraints. though each mine is unique ,some general conclusions can be drawn analyzing the capacity model . under the restrictions of the model the half web cutting sequences offers the highest output of all analysed methods followed by the half-opening mode . depending on the face length ,the bi-directional cutting method has advantages compared to the uni-dirctional sequence in terms of higher productivity. 中文译文高效生产一个关于采煤机截割次序的问题1 摘要目前,井下长壁采煤法致力于增加安装在采煤机和刮板输送机的电机功率,以及更先进的支架控制系统和增加工作面长度,以达到建设费用和取得较高的生产效率的目的。这种努力已经造成较高的开支和前所未有的设备费用增长速度。现在趋向于“更大和更好”的仪器和装备,然而这种趋势在技术上和费用上的可行性已经达到极限。为了要实现进一步促进生产力的增加,合理、有机地规范长臂采煤法的工序应该是解决提高生产率问题的唯一合理答案。在本文中论述了通过合理安排采煤机的截割次序以实现提高采煤机工作效率。2简介 传统上,在井下长臂采煤法操作方便,采煤机挖掘过程中,使用以下截割次序之一:反方向的或双方向的循环。除了这两种主要的方法,交替循环采煤也已经应用在地下的硬煤层开采中,它成功地推广在全世界的采掘过程中。就半边切断循环举例来说,在科罗拉多,美国在二十里煤矿使用,而且matla的南非短巷道操作的开采也在这被应用。其他类似的采掘已经通过验证改进截割次序能提高开采产量,举例来说,它大约能够在产量上增加40%。然而提到应用在采煤上根据特殊情况而改变切割的方法,用煤层高度和设备的使用举例说明,论文系统地论述通过从不同的角度采取不同的方法。详细描述了采矿的每种切割方法,包括能生产的和不能生产的循环,以下将会给出一个简短的关于采煤机生产能力的计算和每个系统在技术上受到约束的概要说明。根据煤层的厚度采用不同标准的设备和合适的装置。此外采煤机和刮板输送机,工作面的长度和特定采煤机截割方式等技术参数在本模型中根据不同的煤层厚度而改变。根据采煤的产量,不同采煤机截割的方法可以通过一个标准化方法绘制产量图来反映不同截割方法的优劣。根据模型的特征,最优的结果(通过改变截割方式而得到的不同的采煤产量)就能获得。3采煤截割次序的说明“为什么长壁采煤法应用的不同切割次序?”这个问题是必须回答的,在以讨论操作工序的主要规则之前,切割方法主要受到煤层的厚度和煤层硬度等因素的限制,就像煤层的物理参数和矿的地址学条件影响煤的崩落能力一样,同样也会影响长壁采煤法工作面的煤层塌方。对于不同的地质条件,不同的截割次序都会得到不同的生产效率和不同质量的工作面。煤送入刮板输送机之上正如采煤机截割,是采煤中的另外一个问题,尤其是在截齿上受到的屈服应力和疲劳应力。一个对于选择最合适的截割次序的全面分析是必要的,而且适合采矿的替换;因为,一般性的解答分类是通过是不能保证最佳的效率和产量。对于一个采煤机截割次序的分类是通过四个主要的参数来规定的。第一,能在采矿方法之间分开,向矿井的两个方向即从头到尾。第二,根据截割次序,在达到工作面尾部,预先在选取一个等价的线切断网,是区分截割方法的一个独立参数。必须有一定的距离空间以改变截割次序,因为做这些需要一定的时间。定义截割次序的另外一个方面是网状断煤的轨迹。然而传统地完整的使用,现代的刮板输送机和液压支架系统允许使用有效率的一半网方法操作。区分截割工艺的以前那些参数就可以把不同的截割方式区分。除了部分或半开口像被用在matla的循环截割中的那些一样的方法,切断高度分别包括柔软悬吊装置和采煤机的高度,它和煤层厚度相等。双方向的截割次序在图中描述的双方向的截割次序,是表示工作面两点之间的特点,在一个完全的截割操作周期中,是在两者的向前和返回期间是完成的。整个长壁采煤法每个周期的
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年炼钢高级工考试必-备知识点
- 2025年初创公司市场营销策略模拟题与答案详解集合
- 2025年外贸业务员面试技巧及模拟题
- 2025年特岗教师招聘笔试备考策略与实战模拟题集
- 2025年初入股市投资者必修课股市实战模拟题库
- 创意绘画教学课件
- 2025年特岗教师招聘考试初中历史模拟试题详解
- 2025年新闻编辑高级职位面试模拟题及应对技巧解析指南
- 2025年特岗教师招聘初中心理健康科目知识点梳理与模拟题训练
- 2025年机械设计工程师面试宝典与预测题
- 2025年留疆战士考试题库及答案
- 2025年高考英语新课标Ⅱ卷点评及2026备考方向 课件
- GB/T 7757-2009硫化橡胶或热塑性橡胶压缩应力应变性能的测定
- 龙应台《放学》记叙文阅读训练及答案
- 智能客服趋势发展白皮书:智能客服预见未来课件
- 2009-2022历年江苏省镇江市丹阳市事业单位考试《综合知识和能力素质(计算机类岗位)》真题含答案2022-2023上岸必备带详解版3
- 工业园区消防安全标准化
- 项目造价咨询计划表
- 人教版高中化学必修一离子方程式双线桥单线桥专项练习
- 幼儿园玩教具操作与活动指导
- 敏捷项目管理实践指南
评论
0/150
提交评论