




已阅读5页,还剩15页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
安徽朗迪2#厂房招标文件摘 要工程项目招标文件是招标单位编制发布的进行工程项目招标极为重要的文件,它既是投标单位编制投标文件的依椐,也是招标单位与中标单位签定合同的依据,该文件中提出的各项要求,对甲乙双方都具有约束力,招标文件是合同的重要组成部分,是工程计价最重要的依据。同时,工程量清单也是编制招标文件的核心部分。招标文件编制的成功与否,往往决定着招标工作能否顺利进行和承包商投标中的各项工作的顺利开展。因此,深刻理解和编制好招标文件有着十分重要的意义,这就需要我们要有过硬的基本功,良好的职业道德。本毕业设计研究的课题是对安徽朗迪2#厂房工程量清单和招标文件的编制,设计课题来源于生产实践,结合施工图纸和地区特点,编制工程项目的施工招标文件,具有较强的实践性,目的是培养学生综合运用四年所学的专业知识和相关的实践操作技能解决工程实际问题的能力。课题选题符合专业培养目标及教学基本要求,能够让学生得到综合的训练和提高。毕业设计课题难度适中,具有一定的深度和广度。本毕业设计是对建筑面积为5820.96平方米,建筑高度为8.150米,建筑长度为84米,建筑宽度为74米,黄海标高为15.000米,抗震设防烈度为6度,耐火等级为二级的钢结构丙类厂房的安徽浪迪叶轮机械2#厂房编制招标文件。希望通过对该招标文件的编制,逐渐掌握招标的过程和招标的各项工作流程及各个需要注意的事项。本课题的具体内容包括:首先熟悉图纸,通过手工或工程造价软件计算工程量,编制工程量清单,编制标底,根据工程信息编制该工程项目的招标文件等。关键词:招标文件;工程量清单;编制;招标Anhui enlightens the 2# workshop tender document brightlyAbstract The engineering project tender document is the tender unit establishes the issue to carry on the engineering project tender extremely important document, it bids the unit to establish the bid document to depend on the tree, also is the tender unit with is selected the unit to evaluate the contract the basis, in this document proposed each request, both has the binding force to armor second grade both sides, the tender document is the contract important constituent, is the project counts the price most important basis.At the same time, the resilience detailed list also is establishes the tender document the core part.The tender reference system success or not, was often deciding whether the tender works carries on smoothly with the contworksmoothdevelopment.Therefore, understood profoundly and establishes the good tender document to have the extremely vital significance, this needs the basic skills which we must have stand up to the most rigorous test, good occupational ethics.This graduation project research topic is enlightens the 2# workshop resilience detailed list and the tender document establishment brightly to Anhui, the design topic originates from the production practice, the union construction blueprint and the local characteristic, the establishment engineering project construction tender document, has the strong practicality, the goal is trains the student to synthesize utilizes the specialized knowledge and correlation practice operation skill solution project actual problem ability which four years institute studies.The topic selected topic conforms to the specialized raise goal and the teaching basic request, can let the student be under the synthesis training and the enhancement.The graduation project topic difficulty is moderate, has certain depth and the breadth.This graduation project is to the floor space is 5820.96 square meters, the construction is highly 8.150 meters, the construction length is 84 meters, the construction width is 74 meters, the Yellow Sea elevation is 15.000 meters, the earthquake resistance fortification intensity is 6 degrees, the fireproof rank is two level of steel structure third kind of workshop Anhui wave enlightens the impeller machinery 2# workshop establishment tender document. The hope through to this tender document establishment, grasps the tender gradually the process and the tender each work flow and each need attention item.This topic concrete content includes: First is familiar with the blueprint, through the handwork or the project construction cost software computation resilience, the establishment resilience detailed list, the establishment minimum acceptable bid, establishes this engineering project according to the project information the tender document and so on.Key words: Tender document; Resilience detailed list; Establishment; Tender第一章 工程招标的研究意义、现状及发展趋势1.1选题的研究意义本毕业设计课题来源于生产实践,结合施工图纸和地区特点,编制工程项目的施工投标文件,具有较强的实践性,目的是培养学生综合运用四年所学的专业知识和相关的实践操作技能解决工程实际问题的能力。课题选题符合专业培养目标及教学基本要求,能够让学生得到综合的训练和提高。毕业设计课题难度适中,具有一定的深度和广度,难点在学生对工程实践中常用的施工方法、工艺、相关的规范、手册、标准等不熟,在具体的指导过程中可适当加强,反复训练,以达到毕业设计的最终目的。招标文件作为整个招投标过程中比较重要的信息,其编制的好坏,决定着招投标活动的成败和招标项目的实施。通过对朗迪2#厂房的招标文件和工程量清单的编写,能充分运用我们在大学里学到的知识,做到从理论到实践的跨越,是对我们学习的总结,也是对我们以后工作打下了良好的基础。编制本次招标文件有着重要的意义:1)通过本次招标文件的编制,能够让我们更好的理解和掌握在大学期间所学的有关理论知识。在编制的过程中,我们会通过查阅相关资料,对招标中的各种事项从不知到了解甚至到掌握。2)在编制招标文件的过程中,我们会遇到很多问题,在问题中不断学习,能够更牢固的掌握到平时不太注意的知识,从而做到劳逸结合。3)本次毕业设计,是我们从理论到实践的一次跨越。因此,编制好这次招标文件,对我们以后能更好更早的进入工作状态有着很大的帮助。1.2 选题的研究现状1.2.1 我国的招标现状改革开放以来,招标一直作为经济体制改革的有效措施之一而在各行各业加以推行:首先是农村的土地承包经营招标,后来是企业,商业的竞争招标承包,到近年来的反腐败运动,强调减少政府行政审批制度,扩大招标的运用范围。西方国家一般没有专门的招标代理机构,而是政府采购代理机构或政府采购执行机构。目前,西方一些国家已经逐渐接受企业参与政府采购代理的观念。它是基于竞争和公平两个核心。代理机构在政府采购操作过程中扮演着两种角色:首先,以经营者的身份从事政府采购,与卖方直接联系和对话。其次,以政府部门的身份从事政府采购活动。因此,政府采购执行机构及代理即使是企业性质,也必须接受政府部门行政,法规的管理和制约,政府采购执行部门和代理也要保证其行为具有透明度和信息公开。实践证明,招投标制度是比较成熟而且科学合理的工程承发包方式,也是保证工程质量、加快工程进度的最佳办法。但由于机制不完善,法制不健全,致使当前的招投标现状仍存在不少不容忽视的问题:1)陪标现象:由于现今基本建设管理体制还没有完全从“计划”为中心转移到以“项目”为中心。一些部门滥用权利,将建设工程内定给某些施工单位中标,其他单位只是陪衬;或者是投标人之间进行串标,相互约定提高或压低投标报价,而获取中标资格,使招投标成为徒具形式的空壳,无法做到公开、公平、公正。2)承包单位转包问题:“转包”现象的存在是现今“豆腐渣工程”存在的一个根源。有的企业中标后,直接转包或违法分包给其他单位,从中收取管理费,以包代管,而对工程质量、安全不从事管理、不负责任。这种转包的现象,使得一些资质不够,没有施工经验的企业,进入施工现场,为质量安全问题埋下隐患。3)评标办法不够科学,专家水平有待提高:目前我们还没有建立起一套科学的评标办法,以至于有些单位,单纯着重报价高低,且整个评分方法重定性评分,轻定量评分.专家评标水平和职业素质有待提高。4)招标代理机构的行为有待进一步规范:由于我国招标代理业务起步晚,招标代理市场发育尚不完善,一些相关的配套制度还不健全,致使一些代理机构在实际工作中缺乏自律,步入误区,利用自己的特殊身份帮助业主选择有倾向性的选择中标单位的结果。其次对于代理机构的工作成果,还没有一个很好的可操作、量化的评价标准。5)对招投标过程中的违法、违纪现象执法监察力度不大。随着公开招标和招标投标法的深入实施,建设市场必将形成政府依法监督,招投标活动当事人在建设工程交易中心依据法定程序进行交易活动,各中介组织提供全方位服务的市场运行新格局,我国的招标投标制度也必将走向成熟,它是招标投标发展的必然趋势。建设市场规则将趋于规范和完善。市场规则是有关机构制定的或沿袭下来的由法律、法规、制度所规定的市场行为准则,其内容包括:市场准入规则:市场的进入需遵循一定的法规和具备相应的条件,对不再具备条件或采取挂靠、出借证书、制造假证书等欺诈行为的应采取清出制度,逐步完善资质和资格管理,特别应加强工程项目经理的动态管理。市场竞争规则:这是保证各种市场主体在平等的条件下开展竞争的行为准则,为保证平等竞争的实现,政府必须制定相应的保护公平竞争的规则。1.2.2 国外招投标现状在国外招投标主要体现了公开竞争的原则。针对这一原则采取了相应的措施:1)坚持公开招标制度。欧盟、美国、英国、意大利、瑞士等国都规定使用公共资金必须采取公开招标方式。实行招标制度的目的是为了保证公开竞争原则能够有效贯彻。公开招标制度要让采购招待人特别是政府采购的官员的行为要“象金鱼缸里的鱼一样”透明,得到有前机构的监督,以保证招标采购既经济节省又能使公共利益的重大实现。2)明确招标步骤和程序。有标准的招标公告格式、标书格式、规范和合同样本,对招投标的管理人员进行定位,确定不同的人员在招标过程中的工作范围。3)明确强制招标的主体范围。强制招标。任何政府部门、机关的主体范围包括三类:第一类是政府及所属机构或任何下属机构,除法律规定外,都应当实行招标采购。第二类是为公共利益而设定,受国家资助的机构。第三类是由政府机构授专营权的公用企业或者属于具有自然垄断性质企业。4)明确强制招标的限额。世界各国和国际组织关于物质采购和工程,服务项目招标,都有限额规定。低于限额的可以不招标。5)明确招标方式。主要有三种:a.公开招标,也称“无限竞争性招标”;b.选择性招标,也称“有限竞争性招标”;c.限制性招标,也称“单一招标”,对那些没有人应标的特殊项目,选择有条件的一两家企业参加。6)明确招标信息的发布。规定招标信息发布主要包括两个方面:一是发布招标公告,要对投标者进行资格预审的,要公告审查标准和程序:二是提供招标文件:编写投标文件的说明;投标者为证明其资格而必须提交有关的资料;提交投标担保的要求;开启投标书的时间、地点和程序;对投标的评审程序和确定中标的标准等等。7)明确评标和中标的标准。评标要求客观、公正、公平、公开,防止串标,防止不公平交易。中标标准主要有两条,在保证招标项目质量的前提下:a.标价最低的投标中标;b.最低的中标。1.3 选题的发展趋势1)招标投标法规建设将继续被高度重视为维护建筑市场秩序,保证招标投标当事人的合法权益,促进社会主义市场经济发展,建立健全招标投标法规日趋迫切而且必要。中华人民共和国建筑法和中华人民共和国招标投标法是这个领域的基本法,有着极其重要的地位和作用。与这两部法律相配套的法规、规章和建设工程发包承包管理条例等也是招标投标法律体系不可缺少的组成部分。在高度重视立法的同时,加大招标投标执法力度也日益引起关注,对该招标而不招标、不按程序招标、串通投标等现象将被及时查处,以维护招标投标工作的严肃性。2)建设交易中心将进一步规范交易中心管理的规章、制度和运行规则将陆续出台,以规范发包方、承包方、中介方和管理部门的行为;交易中心技术装备水平和现代化管理水平也将进一步提高,将广泛应用计算机处理各类信息数据,实现工程报建、招标信息、投标企业档案、场内办理手续等的微机管理;交易中心的功能和管理将日趋完善,逐步成为信息中心、管理中心、交易中心、咨询服务中心。除提供各种信息咨询服务外,其主要职责是能保证招标全过程的公开、公平和公正,确保进场交易各方主体的合法权益得到保护,特别是要保障法律规定的必须进行招标项目的程序规范合法。3)建设市场规则将趋于完善和规范市场规则是有关机构制定的或沿袭下来的由法律、法规、制度所规定的市场行为准则,其内容包括:a,市场交易规则:交易必须公开(涉及保密和特殊要求的工程除外)、交易必须公平、交易必须公正;b,市场竞争规则:这是保证各种市场主体在平等的条件下开展竞争的行为准则,为保证平等竞争的实现,政府必须制定相应的保护公平竞争的规则。招标投标法、建筑法、反不正当竞争法等以及与之配套的法规和规章都制定了市场公平竞争的规则,并通过不断的实施将更加具体和细化;c,市场准入规则:市场的进入需遵循一定的法规和具有备相应的条件,对不再具备条件或采取挂靠、出借证书、制造假证书等欺诈行为的应采取清出制度,逐步完善资质和资格管理,特别应加强工程项目经理的动态管理。4)招投标机制将会不断创新招投标制度是动态的,其目的就是面对市场进步中的困惑,不断调整机制防止招投标竞争属性被扭曲,滋养公平正义,凝聚市场的和谐发展。因此,招投标市场的健康发展需要制度的不断有效突破和创新,规范市场积极有为:a完善机制,保障招标成效、减少招标过程的人为干扰,维护市场的竞争秩序。b健全机制,加大不正当竞争的成本和难度,有效遏制违规行为的发生。c建立机制,实现建设项目的源头管理。一是对国有投资项目,积极探索国有投资项目的“代建制”,按照建设项目投资、建设、使用、监督分离的要求,推行“政府项目代建制、代建单位招标制、代建风险包干制”。二是继续打造诚信市场,深化信用体系建设,限制有不良记录的企业参与政府投资项目,促进招投标市场的持续健康发展。三是建立协同管理的工作机制,市场必将形成政府部门依法监督,招投标双方依据法定程序进行公开、公平、公正的交易活动,各中介组织提供规范全方位服务的市场运行新格局,我国的招标投标制度也必将走向成熟,它是招标投标发展的必然趋势。第二章 论文的研究方案及工作计划招标投标制是在社会主义计划经济向市场经济过渡,国家迅速发展,建设管理体制步入改革后开始实行的,是一项能够充分体现工程承发包交易行为公开、公平、提高工程质量、发挥投资效益、防止腐败和不正当竞争等方面均起到了很好的促进作用,并为企业深化改革,挖掘内部潜力,参与市场竞争提供了良好契机,尤其是在政府对建筑业发展的宏观调控上发挥着极其重要的作用。2.1 本论文拟采用的研究方案2.1.1 本论文的编制的重点在招标文件中,工程量清单的编制是招标文件的核心,他决定着标底和招标文件编制的成败与否,因此也是编制招标文件的重点。工程量清单是工程计价的基础,其主要作用如下:1)为投标人的投标竞争提供了一个平等和共同的基础;2) 是建设工程计价的基础;3)是工程付款和结算的依据;4)是调整工程量进行工程索赔的依据;2.1.2 本论文编制的难点工程量清单是招标文件的核心部分,同时也是编制招标文件的难点。工程量清单编制的成败与否决定着招标文件的成败,因此,认真完成好工程量清单的编制至关重要。但编制工程量清单,不仅耗时耗力,而且容易出错,稍不留神就会漏算等。工程量清单的编制有如下难点:1)施工图不详细,工程容易变更,导致工程量不容易计算。2)使用新材料、新工艺中暂估价值的确定时,工程量和工程价格计算的不确定。3)建筑及结构构造中的次要构件容易漏项的项目容易忽略。2.1.3 拟采用的研究方法本毕业设计先是通过与指导教师和同学间的讨论,确定研究的目标。然后自己在平时的设计中,通过自己的不断摸索与对有关资料和文献的查阅,对图纸和有关规范的不断掌握,从而达到理论与实践的结合。而工程量清单的编制是招标文件的核心部分,所以,首要工作是努力编制好工程量清单。2.2 本论文的工作计划安排由于初次编制招标文件,对很多要做的工作都不是很熟练。因此,必须要安排好每周甚至是每天的工作任务,才能在预定的时间范围内完成这次招标文件的编制。以下是我对毕业设计时间的细化,安排如下:1)外文资料翻译、调研并收集相关工程资料、复习相关主干课程、确定毕业论文题目寒假、第1周;(寒假期间至2月23日)2)学生提交开题报告第1周;(2月24日至3月2日)3)课外实习实践,整理论文素材,提交论文提纲,开始撰写论文第24周;(3月3日至3月23日)4)毕业论文初稿第59周;(3月24日至4月28日)5)毕业论文中期检查,修改初稿第1011周;(4月29日至5月12日)6)修改论文并定稿第1214周;(5月13日至6月2日)7)电子版毕业设计文件的输入、打印和装订第15周;(6月3日至6月9日)8)指导教师审核,评阅教师审核,毕业设计答辩第16周;(6月10日至6月16日)第三章 参考文献 1 尚峰利.工程造价的动态管理J. 交通世界(建养.机械),2008(08) 2 闫瑞娟.工程造价风险管理方法研究D.重庆大学,2003 3 宋静艳.工程造价工程量清单计价方法的理论与应用研究D.西南交通大学,2009 4 徐清凤.工程项目的全过程造价控制J.科技创新导报,2010(08) 5 刘丽华.关于工程造价全过程控制J.河北建筑工程学院学报,2005(12) 6 项纯.国内外工程造价管理情况分析与借鉴J.铁道工程学报,2009(06) 7 张玉红.建筑工程招标存在的问题及对策探讨J.中小企业管理与科技(上旬刊),2009(07) 8 玉才.建设工程招标工作中存在的若干问题与对策J.中国招标,2008(05) 9 H.Wittfoht.Prestressed Concrete Bredge Construaction with Stepping Formwork E-quipment,Detroit:ACIPublication,1969 10 L.H.Martin,J.A.Purkiss,Structuraldesignofsteelworkto EN1993andEN1994,Orubuzpress,2008第四章 参考外文文献Architectural engineering tender system improvementAbstract Introduced our country present two kind of main form of tender, analyzed from several different angle contrasts had the minimum acceptable bid tender and the non-minimum acceptable bid tender good and bad points, and how to consummated these two kind of form of tender to propose some suggestions, caused by the time to incur the bid work to be able the effective implementation.Key words: Tender; Has the minimum acceptable bid; Does not have the minimum acceptable bid The project tender is a comprehensive technical economic activity, the affected area broad, the procedure is complex, although our country has appeared Tender Tender and the necessary laws and regulations, but tenders the unit in the implementation process strictly according to not to incur the bid law laws and regulations execution, incurs in the bid work the capriciousness big, the fair fairness is bad, lacks the unification standard, the camera operation is relatively serious, the administrative intervention is big, the corruption is serious, has many problems.The our country present tender mainly has the minimum acceptable bid tender and the non-minimum acceptable bid tender.Has the minimum acceptable bid bid is refers first or it entrusts by the owner to have the qualifications organization of consultation basis design paper, the tender document and the profession budget fixed quantity, establishes a construction budget to take the minimum acceptable bid in advance, then when evaluation of tenders, the compound minimum acceptable bid which obtains as the evaluation of tenders base standard rate or the minimum acceptable bid weighting takes the minimum acceptable bid the evaluation of tenders base standard rate, according to the above and carries on the appraisal to many tenderers quoted price one tender method.The non-minimum acceptable bid tender is refers in the process which the owner tenders does not suppose the minimum acceptable bid or even if supposes the minimum acceptable bid not to take the evaluation of tenders standard, the owner only must propose an appraisal standard and the method then one tender way.First chapter The contrast analyzes two kind of forms of tender1.1 project qualities In this sense, had the minimum acceptable bid to tender manifests its merit, it could look after the construction the benefit, caused the construction establishment in the reasonable profit foundation, but guaranteed the project quality fully.To an engineering project, most important is can guarantee the project the quality, the tender unit before the tender, organizes the personnel to act according to the current fixed quantity to establish the project the approximately investment, according to this took the tender the minimum acceptable bid, each bid unit also all according to national the fixed quantity, and unifies oneself enterprise the strength and the management level, in the realization certain profit foundation proposed a reasonable quoted price takes the marked price, is selected the enterprise has the guarantee project quality ability.If carries on the tender according to the non-minimum acceptable bid bid, some enterprise strength is not strong, in order to be selected, does not hesitate to reduce the quoted price, but in order to reduce the loss, cheats on labor and materials, finally has affected the project quality.1.1.1 project construction costs The non-minimum acceptable bid tender may reduce the project construction cost to a certain extent, saves the construction investment.Incurs in the tender procedure, decided is selected or not the most important factor is the project construction cost, quotes price in the reasonable construction cost scope lowly, is selected the opportunity is bigger.In has the minimum acceptable bid to tender, as a result of the minimum acceptable bid the fixed quantity promulgation time, establishment of strengths level as well as the construction craft influence and the limit, cannot represent the outstanding construction enterprise to the engineering project lowest quoted price, in order to be selected, the outstanding enterprise can not but formulate the close minimum acceptable bid quoted price according to the fixed quantity, causes the project investment enlargement.Very obviously, choice construction craft advanced, management level high construction enterprise, its construction cost should be lowest, the project total construction cost corresponding also is lowest.1.1.2 move of bid management The non-minimum acceptable bid bid lacks a set of perfect tender policing method, enables the non-minimum acceptable bid tender project the implementation process to have many loopholes.Some are selected the human in the project implementation process, through methods and so on change, claim, enable the final project the settlement price to have the minimum acceptable bid to tender the project to be also higher than; Also lacks to constructions prestige restraint as well as to the construction process management by supervision.Has the minimum acceptable bid to tender has a set of complete move of bid procedure, may cause to incur tender procedure methodical march.Second chapter perfect measure2.1 definite minimum acceptable bids Uses the material object method establishment minimum acceptable bid, the carrying out resilience detailed list tender.To has the minimum acceptable bid tender is the evaluation of tenders basis, to the non-minimum acceptable bid bid is prevented the low price is selected reference.At present our country minimum acceptable bid establishment uses the idea price way all is take budgets the fixed quantity as the foundation, but this idea price way reflected the price level only can be the social average level, or is some stage productivity level, cannot construct enterprises own level on behalf of at present, causes the enterprise to bid is not depends on the enterprise the comprehensive competitive power, but is comparing the construction cost computation level. In view of this kind of situation this article suggested may use the material object method establishment minimum acceptable bid, the carrying out resilience detailed list tender.The material object method is calculates the sub-item resilience separately according to the construction blueprint, then applies mechanically the corresponding budget man-power, the material and the mechanical stage classs fixed quantity amount used, again separately was multiplied by the project locus computation man-power, the material and the mechanical stage classs actual unit price then, extracted the unit project the man-power, the material and the construction machinery working cost, and compiled the summation, then obtained the direct engineering cost, finally pressed the stipulation idea to take other general expenses, and compiled obtains the unit project construction drawing computation construction cost.Uses the material object method establishment minimum acceptable bid to be able really to reflect comprehensively the construction product the value, can the Journal of Propulsion Technology be progressive.The carrying out resilience detailed list tender can further promote the enterprise to strengthen own management, enhances the synthesis strength and competitive ability.2.2 uses the reasonable evaluation of tenders method Using “the non-minimum acceptable bid tender, has the minimum acceptable bid evaluation of tenders”, the synthesis applies two tender ways.In the evaluation of tenders process, all is quotes price low take all tenders in as the standard (perfect score), other tenderers quoted price according to the deviation percentage computation corresponding score which determined in advance, this must prevent is lower than the cost the low price to be selected.This request in the evaluation of tenders process, uses the more reasonable evaluation of tenders method. In view of this kind of situation this article suggested may use “the non-minimum acceptable bid tender, has the minimum acceptable bid evaluation of tenders”.Uses the non-minimum acceptable bid tender first, each enterprise may act according to own strength, the management level as well as the market conditions determined a reasonable quoted price, may prevent the reso
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 安徽省池州一中2026届化学高三第一学期期末学业质量监测试题含解析
- 情景歌课件教学课件
- 全新学校清明节扫墓活动方案
- 陕西省西安市新城区西安中学2026届高一化学第一学期期中经典试题含解析
- 高校大学生联谊活动策划方案
- 幼儿园家园共庆端午节活动方案
- 恐龙大迁移课件
- 现代物业面试题及答案
- 海关监制考试题及答案
- 福建莆田秀屿下屿中学2026届化学高二上期末预测试题含答案
- 2025年静宁县城区学校选调教师考试笔试试卷【附答案】
- 2025年乒乓球二级裁判考试题及答案
- 2025年乐清辅警考试题库及答案
- 血标本采集考试试题附有答案
- 浙江省温州市龙湾区2024-2025学年七年级下学期学业水平期末检测数学试题
- 北京卷2025年高考语文真题
- 2025年工业和信息化部所属事业单位招聘28人笔试模拟试题及答案详解一套
- GB/T 45938-2025医疗保障信息平台便民服务相关技术规范
- 养老护理员培训课件模板
- 2024-2025学年北京市西城区统编版三年级下册期末考试语文试卷【含答案】
- DB31∕T 444-2022 排水管道电视和声呐检测评估技术规程
评论
0/150
提交评论