毕业论文范文——某建筑空调工程设计_第1页
毕业论文范文——某建筑空调工程设计_第2页
毕业论文范文——某建筑空调工程设计_第3页
毕业论文范文——某建筑空调工程设计_第4页
毕业论文范文——某建筑空调工程设计_第5页
免费预览已结束,剩余63页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

河南理工大学本科毕业设计(论文) Abstract摘要本设计为焦作市某建筑空调工程设计,本工程为地上三层拥有地下储物室的别墅,总建筑面积为1370,空调面积为580。本设计采用溴化锂吸收式制冷机进行夏季供冷,冬季供热。采用卧式安装风机盘管,每个房间设带温控三速开关。冷热源采用风冷式冷热水机组。需要时壁挂式电锅炉作为辅助热源,兼供生活热水。根据建筑的用途,全楼采用风机盘管系统,新风有门窗余隙等自然补给,卫生间、厨房、烧炉间设独立排风系统,卫生间通风统一由排风扇排出,在末端安装止回阀。水系统采用闭式机械循环,利用空调机组内和燃气壁挂炉内的循环泵提供循环动力。关键词:风机盘管系统 溴化锂吸收式制冷机组河南理工大学本科毕业设计(论文) AbstractAbstractJiaozuo City, the design of a building air conditioning engineering design, the project is on the ground three underground storage room of the villa has a total construction area of 1370, 580 air-conditioned area. This design uses lithium bromide absorption chiller for summer cooling and winter heating. Horizontal installation of fan coil units, each room set up with three-speed temperature control switch. Cold source is air-cooled chiller. Wall-mounted electric boiler when needed as an auxiliary heat source, and for domestic hot water.According to the construction of purpose, the whole building by fan coil system, the new wind and other natural supplies clearance doors and windows, bathroom, kitchen, burning furnace are located separate ventilation system, bathroom exhaust fan ventilation and unified by the discharge valve at the end of the installation. Closed mechanical loop water system, the use of air conditioning units and gas boiler in the circulation pump to provide cycle power.Keywords:KywordskkyFan coil system Lithium bromide absorption chiller朗读显示对应的拉丁字符的拼音河南理工大学本科毕业设计(论文) 目录目录第一章 绪论11.1 课题题目11.2 课题意义11.3 国内研究现状1第二章 负荷计算42.1 夏季冷负荷计算52.1.1 外墙形成的冷负荷52.1.2 窗户形成的冷负荷52.1.3 冷负荷计算52.2 夏季湿负荷的计算26第三章 空调系统的选择283.1 空调系统选择283.2.1风机盘管系统的特点:283.2.2 空调水系统的比较293.2.3溴化锂吸收式制冷机特性31第四章 空调系统设备的确定324.1 送风处理过程及送风量的确定324.2 厨房餐厅卫生间排风量确定344.3 风机盘管选择354.3.1 风机盘管机组的选型要求:354.3.2 风机盘管台数的确定354.3.3 各房间风机盘管型号的选择35第五章 气流组织的计算385.1 风机盘管风口选型385.2 各房间风口大小选择39第六章 空调系统水力计算416.1 各房间水流量的确定416.2设计的主要原则如下416.3供回水系统管径确定及水力计算416.4 凝结水管水力计算48第七章 空调系统的消声减震507.1 空调系统的噪声源507.2空调系统噪声自然衰减507.3消声措施517.4 空调系统中消声器消声量的确定527.5 空调系统的减震537.5.1减振器使用应注意的问题537.5.2 各种减振措施的使用要求54第八章 机房及其设备的设计558.1 机房冷热源选择558.1.1 制冷机组种类特点558.1.2 制冷机组选择558.2 膨胀水箱选择568.3 冷冻水泵选择578.3.1 设备的阻力578.3.2 冷冻水泵扬程578.4 冷却塔的选择598.4.1 冷却塔型号598.4.2 冷却塔的布置:59第九章 总结60参考文献61致谢621河南理工大学本科毕业设计(论文) 第一章 绪论第一章 绪论1.1 课题题目某建筑空调工程设计1.2 课题意义使建筑内全年空气参数满足人体舒适度要求,合理布置机组、管线及末端工作系统,使系统能承担建筑负荷的同时不影响建筑美观。特殊用途房间设独立的排风系统,使房间满足人身安全及洁净度要求。1.3 国内研究现状设计方案对暖通空调工程设计的成败优劣关系重大。近年来,随着科学技术的迅速发展以及对节能和环保要求的不断提高,暖通空调领域中新的设计方案大量涌现,针对同一个设计项目,往往可以有几种、十几种甚至几十种不同的设计方案可以选择,设计人员不得不进行大量的方案比较和优选的工作,设计方案技术经济性比较正在成为影响暖通空调设计质量和效率的一项重要工作。暖通空调设计方案的评价因素很多,一些因素很难定量表述,许多因素又不具可比性,每种设计方案往往都有各自的优缺点,面对众多的设计方案,由于考虑问题的角度不同,各方的看法往往各不相同,甚至大相径庭。目前在设计方案比较中存在的一些混乱状况使设计人员无所适从。如何对暖通空调设计方案进行科学的比较和优选,是暖通空调设计人员在实际设计工作中经常遇到的一个重要技术难题。能够满足使用要求,这是方案可行性应考虑的主要问题。设计方案应符合国家和当地政府有关法规和规范的要求,包括有关环境保护的要求;设计方案应能满足有关方面的要求(如供电、供气、供水、供热等),并应特别顾及这些条件的长期、变化情况。例如采用水源热泵设计方案时应考虑当地地质情况、地下水资源的现状和变化趋势、冬季热负荷和夏季冷负荷不平衡所产生的热(冷)蓄积效应等问题。对于温湿度等参数要求较高或比较特殊的工艺性暖通空调设计项目,应对设计方案进行全年工况分析,以确保其在全年各种室外气1象条件下的适应性。对于一些无法采用标准设备的特殊情况,对非标准设备应提出详细的参数要求,并且所提出的参数要求应合理可行。能否有足够的机房面积也是评判设计方案可行性必须考虑的问题,尤其是对于一些改造工程和建筑面积比较紧张的情况。对于一些要求全年保证室内空气参数的重要工程以及空调系统故障停机将产生严重损失的场所,如航天发射场,应考虑系统中设备的工作可靠性和备份问题,进行系统工作可靠性分析。在这种情况下,室外气象参数和安全系数的确定也应特殊考虑。经济性比较是目前暖通空调方案比较中考虑最多的一个问题。在经济性比较时首先应注意比较基准必须一致。应采用相同的设计要求、使用情况、设备档次、能源价格、舒适状况、美观情况等基准条件进行比较,这样才能保证方案比较结果的科学性和合理性。如果对采用名牌设备和采用低档设备的方案进行经济性比较,显然是不合理的;如果不考虑舒适性的区别,对有新风供应和没有新风供应的方案进行经济性比较,显然不可能做出正确的选择;如果不考虑美观性和舒适性进行经济性比较,对集中式空调方案显然是不公平的。一次投资是投资方最为关注的一个参数,在计算投资时应全面准确、不能漏项。暖通空调设计方案的一次投资不仅包括各种设备、管道、材料的投资,而且应包括各种相关收费(如热力入网费、用电设备增容费、天然气的气源费等),相应的安装、调试费用,相关的工程管理等各种收费,相关水处理和配电与控制投资,机房土建投资与相应室外管线的费用,而这些在实际设计工作中容易被遗漏。由于同一种设备的生产厂家较多,价格各异,因此在不同方案经济性计算比较时各种设备的价格应采用平均价格。以上都是直接费用,在一些情况下间接效益也应综合考虑。如宾馆、饭店、写字楼的空调机房节省的面积,作为商业用房可产生的效益。如果采用贷款进行建设,全面的经济性比较还应考虑贷款利率和还贷期限等动态因素。运行能耗和运行费用是暖通空调设计方案技术经济性比较必须考虑的重要参数。运行能耗除了应计算暖通空调主机(锅炉和制冷机等)的能耗外,还应计算其他辅助设备(如风机和水泵等)的能耗。不能简单按照设备铭牌功率和2运行时间的乘积来计算能耗而应考虑在全年季节变化的情况下,建筑物实际负荷的变化,同时应考虑设备非标准状态下的效率。办公楼、教学楼、写字楼和游泳馆等建筑物的暖通空调设备通常间歇运行,其运行时间应为扣除停机时间后的实际运行时间。在计算过程中应注意不同地区、不同时期、不同时段各种能源的价格可能不同。由于影响因素和不确定因素较多,如何准确地计算建筑物暖通空调设备全年的实际能耗和运行费用,目前仍然是一个没有完全解决的技术难题。在设计方案经济性比较时应综合考虑投资、运行费用以及设备的使用寿命,以相同的使用周期为基准,进行综合经济性的计算比较,而不能简单地根据设备报价进行比较。对于同时有供暖和空调要求的项目,应考虑冬季和夏季设备综合利用问题,进行冬夏季综合经济性比较。对于可以兼供生活热水的工程,应综合考虑生活热水供应的投资和能耗。3河南理工大学本科毕业设计(论文) 第二章 负荷计算第二章 负荷计算本设计为焦作市某三层组合住宅型别墅为了计算方便,气象参数参照郑州。房间进行编号,如图1所示: 一层二层三层图1 各楼层空调房间编号2.1 夏季冷负荷计算采用谐波反应法计算围护结构形成的冷负荷。2.1.1 外墙形成的冷负荷 (2-1)外墙选择空气调节附录2-9中序号48的加气混凝土复合板墙体传热系数: 2.1.2 窗户形成的冷负荷玻璃窗选择6mm原普通玻璃=0.47,窗内遮阳为浅蓝色布帘=0.6,根据民用建筑热工设计规范选择窗的传热系数为窗户瞬变传导得热形成的冷负荷 (1-2)窗户日射得热形成的冷负荷 (1-3)有效面积系数=0.752.1.3 冷负荷计算考虑别墅整体不大,卫生间、烧炉间、厨房设独立排风风扇,室内维持正压,使用时间一般不在建筑最大冷负荷时间。建筑较小,照明设备及人员密度低,在本设计中忽略内维护结构冷负荷及灯光人体负荷。门按玻璃窗处理,一层外维护结构面积:西南面墙面积:F=32西南面窗面积:F=0西北面墙面积:F=35西北面窗面积:F=58东北面墙面积:F=32东北面窗面积:F=0东南面墙面积:F=37东南面窗面积:F=421)外墙体冷负荷计算加气混凝土面墙:传热系数K焦作地区的气候参数与郑州的气象参数比较接近,选用郑州的数据作为参考。由课本附录2-9序号48查得衰减系数=0.36,衰减度=2.2,延迟时间=8.4h。从附录2-10查得扰量作用时刻t-时的各个方向外墙负荷温差逐时值,即可按式(2-58)算出外墙的逐时冷负荷。计算结果如下:64计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:008910111213131313131312111110K1.26F32CLQt322.6362.9403.2443.5483.8524.2524.2524.2524.2524.2524.2483.8443.5443.5403.2表2-1 西南面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00789101112121313121211111010K1.26F35CLQt308.7352.8396.9441485.1529.2529.2573.3573.3529.2529.2485.1485.1441441表2-2西北面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00101011111112121111111010998K1.26F32CLQt403.2403.2443.5443.5443.5483.8483.8443.5443.5443.5403.2403.2362.9362.9322.6表2-3东北面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:001111121212131212121211111099K1.26F37CLQt512.8512.8559.4559.4559.4606.1559.4559.4559.4559.4512.8512.8466.2419.6419.6表2-4东南面墙冷负荷2)门、窗冷负荷计算内墙选择混凝土墙查房间类型和放热特性可知房间类型为重型。由附录2-13中查得各计算时刻的负荷强度Jj.t,有效面积系数为0.85。 西南及东北面无窗此处不作计算。由空气调节附录2-12中查得各计算时刻负荷温差,计算结果列于下表。计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:002.73.84.9677.78.38.78.88.68.17.36.55.64.9K3.6F58CLQt563.8793.41023.11252.81461.61607.817331816.61837.41795.71691.31524.21357.21169.31023.1表2-5 西北面门窗瞬时传热冷负荷由附录2-13中查得各计算时刻的负荷强度Jj.t,有效面积系数取Xg=1,窗户遮阳系数Cn=0.6,玻璃遮挡系数Cs=0.83,按式(2-61)计算,结果列于下表。(修正系数为0.99)计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00Jj.t51647484889012117922823720282635545F58Cn0.6Cs0.47Xg0.75CLQt619.3777.2898.71020.11068.710931469.62173.92768.92878.22453.1995.8765.1641.2546.5表2-6西北面门窗日射得热冷负荷 注:CLQt为经修正后的数值同上东南面外门窗的负荷计算如下:计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:002.73.84.9677.78.38.78.88.68.17.36.55.64.9K3.6F42CLQt408.2574.6740.9907.21058.41164.212551315.41330.61300.21224.71103.8982.8846.7740.9表2-7 东南面门窗瞬时传热冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00Jj.t19322723420816313412311298806044383228F42Cn0.6Cs0.47Xg0.75CLQt1714.42016.42078.61847.71447.91190.31092.6994.9870.5710.6533390.9337.6284.3248.7表2-8东南面门窗日射得热冷负荷 计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00西南墙322.6362.9403.2443.5483.8524.2524.2524.2524.2524.2524.2483.8443.5443.5403.2西北墙308.7352.8396.9441485.1529.2529.2573.3573.3529.2529.2485.1485.1441441东北墙403.2403.2443.5443.5443.5483.8483.8443.5443.5443.5403.2403.2362.9362.9322.6东南墙512.8512.8559.4559.4559.4606.1559.4559.4559.4559.4512.8512.8466.2419.6419.6西北门窗负荷传热563.8793.41023.11252.81461.61607.817331816.61837.41795.71691.31524.21357.21169.31023.1日射619.3777.2898.71020.11068.710931469.62173.92768.92878.22453.1995.8765.1641.2546.5东南面门窗负荷传热408.2574.6740.9907.21058.41164.212551315.41330.61300.21224.71103.8982.8846.7740.9日射1714.42016.42078.61847.71447.91190.31092.6994.9870.5710.6533390.9337.6284.3248.7总计49525820.36544.36915.27008.47198.67646.88401.28907.887417871.55899.65200.44608.54145.6表2-9 一层外围护结构各项冷负荷计算汇总其他楼层计算方法同上,此处忽略具体步骤。二层外围护结构面积如下:西南面墙面积:F=32西南面窗面积:F=0西北面墙面积:F=58西北面窗面积:F=22东北面墙面积:F=32东北面窗面积:F=0东南面墙面积:F=37东南面窗面积:F=42计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:008910111213131313131312111110K1.26F32CLQt322.6362.9403.2443.5483.8524.2524.2524.2524.2524.2524.2483.8443.5443.5403.2表2-10 西南面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00789101112121313121211111010K1.26F38CLQt335.2383430.9478.8526.7574.6574.6622.4622.4574. 6574. 6526.7526.7478.8478.8表2-11西北面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00101011111112121111111010998K1.26F32CLQt403.2403.2443.5443.5443.5483.8483.8443.5443.5443.5403.2403.2362.9362.9322.6表2-12东北面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:001111121212131212121211111099K1.26F37CLQt512.8512.8559.4559.4559.4606.1559.4559.4559.4559.4512.8512.8466.2419.6419.6表2-13东南面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:002.73.84.9677.78.38.78.88.68.17.36.55.64.9K3.6F22CLQt213.84300.96388.08475.2554.4609.84657.36689.04696.96681.12641.52578.16514.8443.52388.08表2-14 西北面门窗瞬时传热冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00Jj.t51647484889012117922823720282635545F22Cn0.6Cs0.47Xg0.75CLQt234.9294.8340.9386.9405.4414.6557.4824.61050.31091.7930.5377.7290.2253.4207.3表2-15西北面门窗日射得热冷负荷 注:CLQt为经修正后的数值计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:002.73.84.9677.78.38.78.88.68.17.36.55.64.9K3.6F42CLQt408.2574.6740.9907.21058.41164.212551315.41330.61300.21224.71103.8982.8846.7740.9表2-16东南面门窗瞬时传热冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00Jj.t19322723420816313412311298806044383228F42Cn0.6Cs0.47Xg0.75CLQt1714.42016.42078.61847.71447.91190.31092.6994.9870.5710.6533390.9337.6284.3248.7表2-17东南面门窗日射得热冷负荷 计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00西南墙322.6362.9403.2443.5483.8524.2524.2524.2524.2524.2524.2483.8443.5443.5403.2西北墙335.2383430.9478.8526.7574.6574.6622.4622.4574. 6574. 6526.7526.7478.8478.8东北墙403.2403.2443.5443.5443.5483.8483.8443.5443.5443.5403.2403.2362.9362.9322.6东南墙512.8512.8559.4559.4559.4606.1559.4559.4559.4559.4512.8512.8466.2419.6419.6西北门窗负荷传热213.84300.96388.08475.2554.4609.84657.36689.04696.96681.12641.52578.16514.8443.52388.08日射234.9294.8340.9386.9405.4414.6557.4824.61050.31091.7930.5377.7290.2253.4207.3东南面门窗负荷传热408.2574.6740.9907.21058.41164.212551315.41330.61300.21224.71103.8982.8846.7740.9日射1714.42016.42078.61847.71447.91190.31092.6994.9870.5710.6533390.9337.6284.3248.7总计4145.144848.665385.485542.25479.55567.645704.365973.446097.865441.824242.34377.063924.73532.723209.18表2-18 二层外围护结构各项冷负荷计算汇总三层围护结构面积:西南面墙面积:F=32西南面窗面积:F=0西北面墙面积:F=82西北面窗面积:F=12东北面墙面积:F=63东北面窗面积:F=0东南面墙面积:F=72东南面窗面积:F=24计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:008910111213131313131312111110K1.26F32CLQt322.6362.9403.2443.5483.8524.2524.2524.2524.2524.2524.2483.8443.5443.5403.2表2-19 西南面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00789101112121313121211111010K1.26F82CLQt723.2826.6929.881033.21136.51239.81239.81343.21343.21239.81239.81136.51136.51033.21033.2表2-20西北面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00101011111112121111111010998K1.26F63CLQt793.8793.8873.18873.18873.18952.56952.56873.18873.18873.18793.8793.8714.42714.42635.04表2-21东北面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:001111121212131212121211111099K1.26F72CLQt997.9997.91088.61088.61088.61179.41088.61088.61088.61088.6997.92997.92907.2816.48816.48表2-22东南面墙冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:002.73.84.9677.78.38.78.88.68.17.36.55.64.9K3.6F12CLQt116.64164.16211.68259.2302.4332.64358.56375.84380.16371.52349.92315.36280.8241.92211.68表2-23 西北面门窗瞬时传热冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00Jj.t51647484889012117922823720282635545F12Cn0.6Cs0.47Xg0.75CLQt128.1160.8185.9211.1221.1226.1304449.8572.9595.5507.5206158.3138.2113.1表2-24西北面门窗日射得热冷负荷 注:CLQt为经修正后的数值计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:002.73.84.9677.78.38.78.88.68.17.36.55.64.9K3.6F24CLQt233.28328.32423.36518.4604.8665.28717.12751.68760.32743.04699.84630.72561.6483.84423.36表2-25东南面门窗瞬时传热冷负荷计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00Jj.t19322723420816313412311298806044383228F24Cn0.6Cs0.47Xg0.75CLQt979.6681152.2521187.7841055.808827.388680.184624.348568.512497.448406.08304.56223.344192.888162.432142.128表2-26东南面门窗日射得热冷负荷 计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:00西南墙322.6362.9403.2443.5483.8524.2524.2524.2524.2524.2524.2483.8443.5443.5403.2西北墙723.2826.6929.881033.21136.51239.81239.81343.21343.21239.81239.81136.51136.51033.21033.2东北墙793.8793.8873.18873.18873.18952.56952.56873.18873.18873.18793.8793.8714.42714.42635.04东南墙116.64164.16211.68259.2302.4332.64358.56375.84380.16371.52349.92315.36280.8241.92211.68西北门窗负荷传热116.64164.16211.68259.2302.4332.64358.56375.84380.16371.52349.92315.36280.8241.92211.68日射128.1160.8185.9211.1221.1226.1304449.8572.9595.5507.5206158.3138.2113.1东南面门窗负荷传热233.28328.32423.36518.4604.8665.28717.12751.68760.32743.04699.84630.72561.6483.84423.36日射979.6681152.2521187.7841055.808827.388680.184624.348568.512497.448406.08304.56223.344192.888162.432142.128总计3972.74423.84900. 55039.5505452765285.15450.85515.85317.84893.44303.73951.73590.53375表2-27 三层外围护结构各项冷负荷计算汇总屋顶面积:灰色玻纤瓦面面积:F=144,=0.25混泥土屋面面积:168,=0.36屋顶热负荷计算如下:计算时刻8:009:0010:0011:0012:0013:0014:0015:0016:0017:0018:0019:0020:0021:0022:001820222324242423222120191

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论