




免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1 If we have to choose a Europe port by which no direct liner to stop orthe trips are few, we should stipulate “ _” in the contract.A. main ports in Europe B. partial shipment allowedC. shipping advice D. transshipment to be permitted2 By the clause warehouse to warehouse, the policy provides an overriding time limit of _days after the completion of discharge of the insured goods from the seagoing vessel at the final port of discharge.A. 30B. 60C. 65D. 903. It is acceptable that the validity place of L/C is in _A. importers countryB. exporters countryC. any third countryD. country instructed by importer4. If the breach of contract is non-fundamental, the injured party _A. can only claim damages but cannot declare the contract voidedB. can only declare the contract voided but cannot claim damagesC. neither can claim damages nor can declare the contract voidedD. either can claim damages or can declare the contract voided5. Since the scope of cover of general additional risks is already included in, it is not necessary fro the goods to be insured by additional risks if it is insured by _A. W.P.A.B. F.P.A.C. All RisksD. War Risk6. During the time limit of loading and unloading, in case the charterer finishes the work of loading and unloading ahead of schedule, then the ship-owner shall pay certain amount of bonus to the charterer, this is so-called _ A. dispatch money B. demurrage C. payment D. surcharges7. If the goods are contracted to be sold on _ terms, then it is the _s turn to take out the insurance and pay the premium. A. CFR Exporter B. CIF ImporterC. CFR Shipper D. CIF Exporter8. The shipper or consignor on B/L is normally the A. exporter B. importerC. shipping companyD. bank9. Since the opening bank takes the _ responsibility for the payment, the opening bank should be carefully chosen. A. first B. secondC third D. fourth10. Perils of sea are those caused by _ A. calamities and accidents B. fortuitous and accidentsC. accidentsD. calamities and fortuitous case analysis: 1. A contract was signed between the seller and the buyer for some kind of chemical product on the basis of FOB xxx port and the goods were found to be in conformity with the requirement of the contract in respect of qualityby inspection before shipping. On arrival, it was found that part of the goodscoagulated (结成硬块) and the quality was not up to the standard set in thecontract after the buyer took delivery of the goods. The investigation showed that it was caused by absorbing moisture in transit due to improper packing.So the buyer filed a claim against the seller for this but the seller pointed outthat the goods conformed to the quality requirement before shipping and thedamage was caused during the transportation after the goods were loaded on board at the port of shipment. The seller refused to make any compensationbecause such losses of or damages to the goods should be borne by the buyeraccording to international trade practices embodied in Inco-terms 2010. What is your opinion? 2. Company A in Country xxx sent company B in country yyy an offer by telex for some kind of agricultural goods as follows: quantity: 1,000 metric tons unit price: USD200/MT CIF San Francisco packing: in new gunny bags payment; by irrevocable letter of credit shipment time: within two months after receipt of relative L/C This offer is good subject to your reply reaching us within 4 days. The following day after company A telexed this offer, it received a telex reply from company B reading “Accept your offer shipment immediately”. Company A did notrespond to this. The next day company A received an irrevocable sight L/C issuedby Citi Bank stipulating “shipment within two months after receipt of relativeL/C” in respect of shipment time. In view of the very booming international marketfor this product, company A refused to sell the goods as offered before and returned the L/C accordingly. But company B insisted that contract was formed between each other so company A had obligation to deliver the goods as offered. What is your opinion based on the stipulations in CISG (United NationsConvention on the International Sale of Goods 1980) if CISG is applicable to this case? Is there a contract between the two parties? (10 points) 3. Company A in China exported some goods on the basis of CIF xxx port and took out insurance for 110% of invoice value against FPA as per the relevant Ocean Marine Cargo Clauses of the Peoples Insurance Company of China dated Jan. 1, 1981. The ship started sailing at the beginning of July. On July 13, the carrying vessel suffered a thunderstorm and it caused some loss of part of the goods valued at UDS 2,000.00. Days later, it struck upon the rocks in transit and caused partial loss of the goods valued at USD10,000.00. Will the insurance company be responsible for compensation of both the losses caused? (10 points)1. Advise Tiresias Ltd (Tiresias) on the following transaction.Tiresias sold a quantity of sultanas to Stetson Ltd (Stetson) on terms FOB, Liverpool, shipment September. Under the terms of the contract, Stetson was obliged to nominate a vessel. On 20th September, Stetson nominated the Wasteland, which was already in dock. The following day, Tiresias began to load the sultanas, but did not have sufficient to fulfil the contract and so waited for a further supply to arrive. The loading was completed just before midnight on 30th September. The vessel sailed the following day. Stetson claims Tiresias failed to fulfil its duty to deliver the goods as stipulated inthe contract. 2. Company A received an irrevocable L/C issued by bank ABC advised and confirmed by bank DEF. This company shipped the goods according to the requirements of the L/C and was going to present the documents for negotiation but received a notice from the confirming bank stating that the issuing bank had gone bankrupt and it would not pay but it could claim payment from the buyer on behalf of company A. What advice will you give company A about his legal position in this matter? 3. Company A exported one batch of goods on the basis of payment by D/P at 90 days sight. Company A presented the draft accompanied by the shipping documents required by the relative contract to the remitting bank who forwarded all the documents to the collecting bank in the country of importer. The collecting bank presented all the documents to the importer and the importer accepted the draft presented as required. When the goods arrived at the destination port, the importer borrowed the shipping documents from the collecting bank by providing Trust Receipt in order to take delivery of the goods in time before the maturity of the draft. When the draft matured, the remitting bank was notified by the collecting bank that it was impossible for the importer to pay the accepted draft as it had gone bankrupt. What should company A do? Why? 4. Company A cabled an offer to company B abroad on June 15th subject to the reply reaching on 20th inst. Company B submitted the cable of acceptance in the morning on 19th but it reached company A as late as 21st due to delay in transit. Company A did not make any response regarding the acceptance late. On June 26th, Company A sold the goods to another client at a higher price. On June 27th, company A received a cable from company B indicating that L/C had been established and requiring company A to ship the goods promptly. Company A replied company B immediately: “ your acceptance was late, no contract existed.” Company B insisted that they delivered the cable on 19th and it did not know the fact that the cable was late anyway. In view of this, company B insisted that contract was formed and company A should fulfill its obligation to deliver the goods as offered. What is your opinion if CISG applies here? 5. The following contract is entered into between company ABC in China and company XYZ in the USA: “1000 tons of grade A dried cod (鳕鱼), USD 1.500.000/MT, CIF Los Angeles INCOTERMS 2010, as per sample submitted. Payment to be by irrevocable letter of credit confirmed by Bank of China opened by October 3rd 2010 for a period of 2 weeks, and to be made against documents evidencing the fulfilment of his CIF obligations, and a certificate of inspection stating the cod to be of grade A quality.”The letter of credit facility is duly opened and the relevant documents being specified to Bank of China and company A proceeds to perform his obligations under the contract. Company B hears rumours that the consignment shipped will not be grade A but grade C, and that the certificate of inspection presented will be a forgery, and instructs both the issuing and confirming banks not to pay against it. Company A presents BOC with the following documents: shipped on board bill of lading for 1000 tons of grade A dried cod in apparent good order and condition; an invoice for the same goods; an insurance policy taken on Institute Cargo Clause C terms; and a certificate of inspection. BOC pays particular attention to the certificate of inspection but is unable to find anything wrong with it as it appears to be in order and as described in their mandate (instructions for opening the credit). BOC pays company A. During the voyage the ship is in a collision and part of her cargo is wet, whilst another portion is deliberately thrown overboard by the crew in order to reduce her weight. When the consignment arrives it is found to be 200 tons short (i.e. there are only 800 tons) and 100 tons of the consignment are damaged by water, and the consignment is found not to be up to sample and not of grade A quality Please answer the following questions:(1). Assume that CISG is to apply to
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 听力教学小学课件
- 优教学英语课件
- 2025年中国数码照相机市场全景评估及投资规划建议报告
- 中国共享充电宝行业市场运营趋势分析及投资潜力研究报告
- 中国湖州房地产行业市场深度研究及投资战略规划报告
- 教学课件思路
- 健康教育:饮食与营养讲课件
- 泵项目可行性研究报告
- 宫腔镜水中毒的观察与护理讲课件
- 护理急诊骨折固定课件
- (完整版)杭州电子科技大学数字电路期末考试试卷及答案
- 建筑装饰装修工程质量验收规范试题
- 能源计量器具配备和管理
- 《食品经营许可证》申请报告书空白模板
- 试卷交接签字单
- 有限空间作业及应急物资清单
- DB13(J)∕T 8060-2019 城镇供热管道及设备安装工程施工质量验收标准
- 《国际商务》课程
- 压力容器设计管理制度
- 比亚迪员工手册54
- 应力波理论复习资料
评论
0/150
提交评论