免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
plant construction contractarticle 1-definitionsthe owner shall mean .the contractor shall mean .the plant shall mean all or any part of the machinery, equipment andmaterials forming the permanent installation as specified inappendix.the site shall mean all the land where the plant is to be constructed in accordance with this contract.the works shall mean the works to be done by the contractor under this contract.the contract price shall mean the total sum payable to the contractor by the owner for the works.article 2-contractors responsibilities1. the contractor shall design, engineer, and construct the plant at the site.2. the contractor shall provide all equipment, materials, tools, facilities,labour and services necessary for the successful constructionof the plant except those items and facilities to be supplied by the owner under article.3. the contractor shall perform the works in accordance with the schedulein appendix.4. the contractor shall provide the owners personnel with training of peration and maintenance of the plant in accordance with appendix.5. the contractor shall supply the owner with the spare parts specified in appendix.6. the contractor shall supply the owner with the maintenance equipment specified in appendix.article 3-owners responsibilities1. the owner shall make available the site and grant the contractor freeand uninterrupted access thereto throughout the duration of this contract.2. the owner shall provide those items and facilities specified in appendixat the time therein established.3. the owner will obtain from the relevant authorities those licenses and permits necessary to construct and operate the plant on the site including work permit for the contractors employees.4. the owner shall pay the contractor for the works performed the contract price set out in article.article 4-contract price1. within days after the effective date of this contract, the owner shall pay the contractor as full and complete compensation for accomplishing the works and assuming all obligations under this contract the contract price in the amount of .2. the contract price is not subject to escalation, and the cost of executing he works shall be the risk of the contractor who shall be deemed to have btained all information and taken into account all circumstances which may affect the cost in agreeing the contract price.article 5-drawings1. the contractor shall submit to the owner for approval and review within he time specified in appendix _ such drawings as may be required for construction of the plant under t
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 警惕溺水警钟长鸣护佑生命至上小学八年级主题班会课件
- 2026年山西省临汾市事业编单位人员招聘考试参考试题及答案详解
- 2026年浙大二院柯桥院区招聘神经内科工作人员1人笔试备考题库及答案详解
- 2026浙江台州市第一人民医院高层次卫技人才招聘19人(二)考试备考试题及答案详解
- 职业卫生技术服务专业技术人员考试(职业卫生检测)模拟题库及答案(2026年广东清远市)
- 金华武义县人力资源开发服务有限公司招聘笔试模拟试题及答案详解
- 2026河北秦皇岛工业职业技术学院招聘专任教师15名考试备考试题及答案详解
- 2026福建三明市中信证券营业部招聘若干人笔试模拟试题及答案详解
- 2026广西桂林市全州县农业农村局招聘特聘农技员2人笔试参考题库及答案详解
- 2026年白山市八道江区事业编单位人员招聘笔试参考题库及答案详解
- 2027届高考数学一轮复习1.4基本不等式(课件)
- 2026年成都第八中学初一入学语文分班考试真题含答案
- 2026安徽九华山旅游发展股份有限公司招聘82人考试备考试题及答案详解
- 2026年河北省中考英语试题(含答案和音频)
- 2026浙江舟山市定海区城东街道办事处第二批招聘城市管理辅助人员3人考试备考试题及答案详解
- 沥青路面施工工艺流程
- 幼儿园防吞食异物安全教育
- 《中国史前文明的瑰宝-仰韶文化课件》
- 国家电网有限公司输变电工程通 用设计(330~750kV输电线路绝缘子金具串通 用设计分册)2024版
- 设备采购申请说明及预算分析报告书
- 2025过敏性休克抢救指南
评论
0/150
提交评论