


全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Activity 2.2.1 Concrete Pad EstimateIntroductionConcrete often accounts for a large percentage of the total cost of a project. Many times it represents 15-20% of the total cost, depending on the building materials and methods of construction chosen. If you plan to order concrete, it is essential to order the correct amount. If you order too little, problems will arise as you take measures to quickly acquire more. If you order too much, you have wasted money and resources and will have to dispose of the excess concrete. With proper planning and preparation, the pouring of concrete usually signals an exciting beginning of a construction project. Equipment Engineering notebook Calculator A1 Example Utility Shed DrawingProcedureCost for the Shed Concrete PadIn this activity you will calculate the cost of pouring the utility shed concrete floor slab as shown on A1- Example Utility Shed Drawing. The slab contains concrete and reinforcing rods (rebar). You will also need a small amount of material to create the forms.1. Use the diagram of the shed floor below to calculate the number of cubic feet of concrete required to construct the pad. Convert cubic feet to cubic yards and record the amount in the quantity column of the table.2. Use a local concrete vendor to find a current price/yard3 of concrete. Record the final cost of concrete to be poured for the utility shed. 3. Calculate the number and cost of the rebar needed to construct the pad. Determine the cost of rebar using local pricing. Rebar should be spaced 24 in. apart to form a grid pattern in the pad. Rebar comes in 10 ft sections. When more than one bar is needed to extend over 10 ft, adjacent bars are overlapped (end to end) 6 in. and wired together. Plan to provide a 3 in. edge distance; that is, terminate the rebar 3 in. short of the edge of the concrete.4. Record the number of 12 ft long 2x6s and the number of 16ft long 2x6s (which will be trimmed to 4 inch widths) needed to build the forms. Assume that you need no other material for the forms. Determine the cost of the boards using local pricing found in advertisements, phone contact, or the Internet.MaterialSize/DescriptionQuantityUnit CostCostConcrete12ft x 16ft x 4in.Steel#4 (9/16in. x 10ft)Forms2in. x 6in. 12ftForms2in. x 6in. 16ftTotal CostConclusion1. Describe the problems that would result from ordering too much concrete.2. Describe the problems that would result from ordering too little concrete.3. What percentage of the total cost of the pad does the steel rebar account for?4. Why is it important to estimate the cost of const
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 写景日记夏日午后的小树林(15篇)
- 电工考试黑钻押题完整附答案详解
- 2024-2025学年法律职业资格考试考试黑钻押题附完整答案详解【考点梳理】
- 导游资格考试练习题含完整答案详解(夺冠)
- 园林古建筑文化遗产价值评估方案
- 2024国家电网招聘考试模拟试题及参考答案详解(考试直接用)
- 2025年辽阳市社会工作事务服务中心面向全市公开选调工作人员的模拟试卷及答案详解1套
- 人防工程项目进度管理方案
- 人防工程火灾危险性评估方案
- 公共交通多模态出行方案设计
- 第一章 地球的运动 单元复习 课件高二上学期 地理 人教版(2019)选择性必修一
- 四川省选调笔试真题
- (高级)数据安全管理员实操题考试题库(含答案)
- 2024版中国红十字会救护培训课件
- 精神科护理警示教育
- KeyLogic-东方航空人才培养-翔计划翼计划-项目实施方案(P83)-2013
- 幼儿园中班《饲养员请客》课件
- GB/T 6003.2-2024试验筛技术要求和检验第2部分:金属穿孔板试验筛
- 以商代储合同模板
- 第7课《实践出真知》第2框《坚持实践第一的观点》【中职专用】中职思想政治《哲学与人生》(高教版2023基础模块)
- 甘肃省工程勘察设计收费指导标准2022版(全过程工程咨询)
评论
0/150
提交评论