




已阅读5页,还剩2页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Change ControlDocument ID: QP703Revision No.: 01Procedure: Change ControlDocument information, authorship and approvalsAuthor signs to confirm technical contentPrepared by:Job title:Signature:Date:Subject matter expert reviewer signs to confirm technical contentReviewed by:Job title:Signature:Date:Quality representative signs to confirm document complies with quality management systemAuthorised by:Job title:Signature:Date:Document review dateTable of Contents1.Purpose32.Application33.Responsibilities34.Procedure44.1.Proposing a change44.2.Evaluating the effect of a change on product quality44.3.Approval of a change before implementation44.4.Implementing a change54.5.Storage of completed change controls54.6.Publication of change control status54.7.Emergency change control55.Heading 165.1.Heading 265.1.1.Heading 36Heading 461. PurposeThis procedure describes the system to control and manage all changes that can impact product quality and safety both developed and manufactured under the Quality Management System (QMS) at .It ensures these changes are clearly identified, documented, reviewed and approved.2. ApplicationThe procedure applies to changes to: product quality controlled documents raw materials specifications analytical methods facilities support systems equipment (including computer hardware) processing steps labelling and packaging materials computer software any other element that can impact product quality and/or safety.3. ResponsibilitiesAmend to reflect company structure.RoleResponsibilityDepartment managersIdentify and follow up actions to be taken to justify any change within their area of responsibility.Quality Manager Independent evaluation of proposed change controls. Approve changes to the company QMS. Management of the change control system. All personnelRaise a change control request. Personnel are encouraged to make changes that improve product quality, or reduce or remove the risk of non conforming product or processes. 4. ProcedureAny change to the following must be approved before the change is made: changes affecting company procedures and systems, referred to as the QMS changes affecting manufacturing equipment performance changes affecting product quality not managed by batch or process documentation.The change control procedure has six distinct elements:1. Reason for the proposed change description of the proposed change.2. Evaluation or impact of the change on product quality, including the documents affected and actions proposed.3. Independent approval of the change before implementation.4. Description of actual change made.5. Review of the change after implementation.4.1. Proposing a changeAll changes are recorded and managed using Form FP703-1: Change Request. The change form is a controlled record once completed.The initiator describes the proposed change and the justification for the change in the Description of Change section. All documents and equipment affected must be listed on the change form. Attach copies of all impacted documents, highlighting the proposed change.Send the change form to the Quality Assurance department so that a unique identifier can be assigned to the change request and then forward to the responsible manager(s) for approval to initiate the change control.Changes are not to be made until they are approved except for emergency change control (see Section 4.7).4.2. Evaluating the effect of a change on product qualityThe responsible manager or delegate assesses the effect of the change and lists the actions required to complete the change.4.3. Approval of a change before implementationThe Quality Manager (or delegate) reviews the change request and proposed actions; amending as necessary. Depending on the significance of the requested change, a meeting may be held with stakeholders to discuss and assess the merits of the change. Minutes of this meeting are recorded and form part of the change control package.The actions cannot be implemented until the Quality Manager has reviewed and approved the change request and the proposed actions.4.4. Implementing a changeThe initiator records on the change form when the actions have been implemented. The responsible manager (or delegate) and the Quality Manager review the change form and associated evidence. If the change actions: have been completed satisfactorily, the change control is closed out. are not satisfactory or further actions have been required and assigned to the responsible manager, then the change request remains open. Changes are reviewed until satisfactory progress has been made and the change control is closed out.Wherever possible, timescales for completion of work is to be specified. Changes must be made in timely manner.Specify frequencies for change control types if required by your company.4.5. Storage of completed change controlsCompleted change requests are controlled records according to Procedure QP403: Control of Records. All associated documentation must accompany or reference the completed change request. 4.6. Publication of change control statusIn order to regularly show status of change in the QMS, the following are published each calendar month to the Managing Director: number of change requests started number of change requests completed number of change requests started but not completed number of change requests outstanding number of emergency change requests completed.4.7. Emergency change controlEmergency changes may be made to controlled processes or equipment or controlled documentation when the responsible manager or delegate decides that failure to make the change would threaten the: occupational health, safety or environment of company personnel quality of raw materials, labelling and packaging materials, container closures, finished product.If an emergency change control is proposed, this must be approved by the responsible manager and a Quality representative. Actions may then be implemented immediately without further evaluation of the change control request. In all other respects, emergency change control must be managed in an identical way to other change controls.Document InformationRevision HistoryRevisionModified byDescription of Change01Complete the above fields for each revision of this document. Ensure that there is sufficient description of changes so that the change history of this document can be followed. Additional columns can be added to include document/change tracking numbers generated by your companys systems if required (eg. change control).Associated forms and proceduresDoc. No.Document TitleQP403Control of RecordsFP703-1Change RequestList all controlled procedural documents referenced in this document (for exam
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年无人机应用基础考试题库附答案详解
- 2025年护士执业资格考试真题及答案
- 慢性膀胱炎合并神经源性膀胱护理查房
- 阿坝藏族羌族自治州2024-2025学年八年级下学期语文月考模拟试卷
- 安徽省安庆市望江县2023-2024学年高二上学期期末考试化学考题及答案
- 2025 年小升初武汉市初一新生分班考试数学试卷(带答案解析)-(人教版)
- 2025 年小升初哈尔滨市初一新生分班考试数学试卷(带答案解析)-(人教版)
- 第一章 三角形的初步知识 过关检测试卷(含答案)2025-2026学年浙教版2024 数学八年级上册
- 资金垫付合同范本
- 源画摄影合同范本
- 中学2025级高一新生军训实施方案
- 简短戒烟干预戒烟成功
- 中职思政试题及答案
- DB3203-T 1080-2025 城市道路路名牌设置规范
- 2025-2030量子科技前沿发展态势与中国市场投资机遇研究报告
- 设备维护方案(3篇)
- 护理操作管理课件
- 肉类加工间管理制度
- 2025年陕西、山西、青海、宁夏高考历史试卷真题(含答案解析)
- 2024-2025学年苏教版四年级下学期期末测试数学试卷(含答案)
- 动脉导管未闭封堵术的医疗护理
评论
0/150
提交评论