已阅读5页,还剩17页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1,Session 5. Improving the Use of Performance Information for Resource Allocation in R&D: Funding and Priority Setting From the Central Budget Authoritys Perspective,Nowook Park Center for Performance Evaluation & Management Korea Institute of Public Finance (KIPF),2,Contents,Performance information of R&D in Korea Issues on performance information of R&D Use of PI for resource allocation in R&D in Korea Issues on the use of PI for resource allocation in R&D,3,1. Performance information of R&D in Korea,4,R&D Performance Evaluation System in Korea,Law for R&D program performance evaluation and management was enacted in 2005 Three evaluation systems Program review process (Self-Assessment) 164 programs are evaluated for 2007s performance Evaluation process for selected programs Long-term program, big program, duplicative programs etc 27 programs are evaluated for 2007s performance Evaluation on public research institute 32 institutes are evaluated for 2007s performance Feasibility study on big R&D programs Programs with more than $ 50 million budget,5,Performance Information of R&D Programs,Information from program reviews Based on checklist Contents of checklist Program purpose Program design Program management Performance plan Results (mostly based on performance indicators) Feedback,6,Performance Indicators of R&D,For the sake of line ministries, pools of PI for 28 program types are provided 28 programs are based on program purpose and utilization of program outputs Program purposes are classified into 4 categories R&D, HR development, international cooperation and infrastructure development Utilization of program outputs is divided into 7 categories Knowledge promotion (basic and applied) Industrial development (short-term, medium/long-term development) Public and social welfare (public service, public health and social welfare, region),7,2. Issues on performance information of R&D,8,Issues on Performance Information of R&D,Hard to develop relevant performance information Results are realized in long term Sometimes even establishing milestone indicator is not easy, because the process is not certain ex ante Hard to evaluate R&D programs based on indicators Peer reviews are widely used method Expertise, balance and independence are required Need to find optimal mix of expert judgment and alternative method,9,Issues on Performance Information of R&D in Korea,PI from evaluation process is based on checklist Evaluation on program results heavily relies on performance indicators Cost-benefit indicators are rarely adopted in the evaluation process, even though they suggested in the PI pool Hard to come up with relevant information Establishing reliable peer review process is hard Existence of strong social ties among scientists tends to hinder objective evaluation process Influences from line ministries may exist,10,3. Use of PI for R&D resource allocation in Korea,11,Overview of R&D Resource Allocation in Korea,Korea becomes 8th country whose R&D spending exceeds $10 billion in 2008 Ratio of R&D spending to total government spending is 4.7% in 2008 Based on “National R&D Program Total-Road Map”, strategic resource allocation occurred Increased spending on small scale basic research by individuals Increased ratio of spending on the areas where spillover effects are big Biotechnology, Energy, Basic research Decreased ratios of spending on the area where private sectors capability is mature Machinery, IT and electronics,12,Changes of R&D Budget Process in Korea (1),National Science and Technology Council (NSTC) was established in 1998 Centralized budget process for R&D Previously there was no systematic budget process for R&D programs Science and Technology Innovation Bureau within Ministry of Science and Technology was established in 2004 Has authority of budget allocation of R&D programs Central budget authority usually accepted the budget proposal from Science and Technology Innovation Bureau with little modification,13,Changes of R&D Budget Process in Korea (2),Ministry of Strategy and Finance takes over the authority of budget allocation for R&D programs in 2008 Science and Technology Innovation Bureau was abolished with the inception of New Administration Implies strengthening the role of the central budget authority in R&D budget allocation Expect more active use of performance information for R&D budget allocation,14,Strategic Resource Allocation of R&D,R&D is one of 14 areas in National Fiscal Management Plan (Medium Term Expenditure Framework) For FY 2008, strategic resource allocation is based on “National R&D Program Total-Road Map” Role of PI in strategic resource allocation appears to be limited,15,Resource allocation among R&D Programs,PI from existing R&D evaluation systems are not actively utilized in budget allocation so far However, as the authority of resource allocation is transferred to the central budget authority, more active use of PI is expected Evaluated as lower 10% of programs in each line ministry will be in danger of 10% budget cut,16,4. Issues on Using PI for Resource Allocation in R&D,17,Use of PI for R&D Resource Allocation,Strategic resource allocation Resource allocation among different areas, such as education, defense, R&D and so on Resource allocation among R&D programs pursuing different goals Resource allocation among R&D programs pursuing similar goals Resource allocation among R&D programs within spending ministries/agencies,18,Issues on the Use of PI for Strategic Resource Allocation in R&D,Strategic plan and PI should be consistently integrated PI at the national level may give rough signals for strategic resource allocation when it is combined with other considerations It is not easy to use PI to set the priority among different areas, such as education, defense, R&D and so on Other factors may play a bigger role,19,Issues on the Use of PI for Resource Allocation for R&D Programs,Selecting appropriate units for evaluation is important to use PI for setting the priority among R&D programs pursuing similar goals Identifying programs pursuing similar goals is the first step Program review process may facilitate the process Crosscut analysis can be used for resource allocation
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2027届洛阳市洛宁县四年级数学第一学期期末考试模拟试题含解析
- 脑卒中康复护理中的艺术治疗
- 肺炎的护理创新与实践
- 2026年初中化学《化学平衡》模拟卷
- 第一章 户外运动装设计1(课件)-《校企合作专项服装设计》同步教学(中国纺织出版社)
- 2026年安全生产考试题库(建筑施工安全)建筑施工安全管理创新试题附答案
- 菏泽市检察院书记员考试试题及答案
- 2026年环境监测运维人员培训考试题修正版(习题试题)附答案
- 2026年内蒙古住院医师规培(内科)考试试题附答案
- 车联网技术与应用-教学标准
- 2026年烟花爆竹从业人员安全培训考试试题附答案
- SYT 6649-2025《油气管道管体缺陷修复技术规范》
- 健康体重管理运动干预中国专家共识(2025版)
- (2025年)宜昌市伍家岗区网格员考试题库(含答案)
- 2026年基层选调生遴选笔试试卷(附答案)
- 山地丘陵村镇水土环境协同修复技术指南编制说明
- DB63∕T 2514-2026 博物馆服务标准体系
- 展览展示设备安装施工方案
- DB63∕T 2025-2022 机关食堂管理规范
- 医废培训知识课件
- 仓库管理标准操作流程SOP
评论
0/150
提交评论