交安(中英文对照).doc_第1页
交安(中英文对照).doc_第2页
交安(中英文对照).doc_第3页
交安(中英文对照).doc_第4页
交安(中英文对照).doc_第5页
免费预览已结束,剩余3页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

马来西亚日产5000吨“海峡”水泥厂基础交安条件Foundation Delivery and Installation Conditions of Malaysia 5000tpd Straits Cement Plant一、所有需要交安的土建基础必须具备三通一平的条件,即水通、电通、路通和场地平整。All the civil engineering foundations which need delivery and installation must be equipped with the condition of “three supplies and one leveling”, which means supply of water, electricity and road and leveled ground.1、水通、电通:熟料线现场施工用水、用电均由业主从一期水泥厂提供接入口。1.Supply of water, electricity: the owner should create an access entry for water and electricity from 1st-phase cement plant to on-spot clinker line.2、路通:需交安基础必须具备道路通畅的条件,即从厂区大门至交安基础具备路通的条件,并能承受重型车辆的通行。2. Supply of road: the foundations must be equipped with smooth road, namely from the plant gate to delivery and installation foundations, and it should bear the heavy vehicles.3、场地平整:需交安基础附近必须具备堆放设备等材料的场地,具体场地条件因为需交安基础的特点不同由安装单位和土建单位协商确定。3. Leveled ground: near the delivery and installation foundations, there must be a ground for equipments. The detailed site conditions should be determined according to the features of delivery and installation foundations by the installation entities and civil engineering entities.二、基础验收工作的内容,包括以下各项:The details of foundation receipt work, including:1、预埋螺栓外露部分需保持整洁、无腐蚀情况,预埋螺栓孔应干净。 1.The exposed part of the embedded bolt should be clean and without corrosion. The hole of the embedded bolt should also be clean.2、基础砼强度需要达到设计要求的100%强度。2.The intensity of the foundation concrete should be 100% according to the designation.3、需进行二次灌浆的基础部位,基础表面必须由土建单位凿毛并保证界面清洁。3.The foundation surface of the foundation part, needing re-grout, should be chiseled until it becomes rough by the civil engineering entities and it should be clean.4、交安前交安区域内的垃圾应由土建单位清除。4.Before delivery and installation, the garbage there should be removed by the civil engineering entities.5、具体的交安部位主要验收项目及标准见附件3。该附件3外的验收项目以相关英标要求为准。5.The main acceptance items and standards of specific delivery and installation are all in attachment 3. Other acceptance items should be in accordance with England standards.三、基础验收程序应符合下列规定:The foundation acceptance procedures should match the following provisions:1、基础验收应由建设单位、土建单位和安装单位共同进行。1. The foundation acceptance should be proceeded by construction entities, civil engineering entities and installation entities.2、土建单位应提供:2. The civil engineering entities should offer:基础的平面布置图(包含预埋、孔洞等详细尺寸)The foundation layout chart, including pre-cast, holes and detailed size.交安部位的混凝土浇筑日期及该部位砼第三方的强度检测报告等技术资料。The date of concrete casting of delivery and installation part. The third-party examining report of intensity of relevant parts of concrete and other technical materials.交安车间每个砼柱基础的两个侧面需用墨线将纵向和横向轴线弹上,每个交安的车间需至少在其中一个基础柱上用油漆倒三角标示标高。The two sides of each concrete column foundation of the delivery and installation workshop should be flipped with chalk line in the shape of lateral and vertical axes. At least one foundation column of every delivery and installation workshop should be marked its height with the sign of painting inverted triangle.重大设备基础,土建单位应向安装单位提供沉降观察点及前期的观察数据。 As regards to important equipments foundations, the civil engineering entities should offer the installation entity the settlement observation site and early stage observation data. 4、 基础交安按流程(附件1)执行。 The execution of foundation delivery and installation as per process (attachment 1)附件1 交安流程Attachment 1 delivery and installation process附件2 交安基础过程表格Attachment 2 process form of delivery and installation foundations附件3 交安验收项目及标准Attachment 3 acceptance items and standards of delivery and installation附件1 交安流程Attachment 1 delivery and installation process 交安流程Delivery and installation process预计交安部位YTL自检合格Estimate delivery and installation position YTL self-checking qualified按照教案条件第三款第二条准备资料Prepare data as per the article II of title III of teaching plan conditions 提交SubmitKHD通知并组织Notification and organization三方签署交安不合格记录The three parties sign disqualification record of delivery and installation不合格UnqualifiedYTL/KHD/AVIC现场交安检查On site delivery and installation inspection 合格Qualified三方签署交安合格记录The three parties sign qualification record of delivery and installationAVIC开始安装AVIC begins to install附件2 Attachment 2 交安过程记录表Delivery and installation process record form 编号:工程名称Project name 交接部位 Transition area 交验日期 Date of submitting acceptance 年 月 日Date 交接简要说明Brief description of the transition遗留问题Leftover problem签字 栏SignatureblockSPYTL YTL KHD AVIC 本表一式三份,由交付单位填报,查验后,各签字方各存一份。This form is in triplicate, after the delivery unit reporting and inspection, each of the signatories save a copy.附件3 交安验收项目及标准Attachment 3 acceptance items and standards of delivery and installation序号NO.项目Project验收内容Acceptance content允许偏差Allowable tolerance备注Remark1为调整而设的地角螺栓混凝土基础Set up anchor bolt concrete foundation for adjusting螺栓纵横向偏差y、zBolt vertical and horizontal deviation y, z10.0mm螺纹垂直伸出长度偏差pDeviation p of threaded vertical extended length-525mm螺栓组中心位置偏差Bolt group center position deviation6mm2不为调整而设的地角螺栓混凝土基础Setting of anchor bolt concrete foundation is not for adjusting螺栓纵横向偏差y、zBolt vertical and horizontal deviation y, z3.0mm混凝土水平面标高Concrete horizontal elevation3.0mm螺纹垂直伸出长度偏差pDeviation p of threaded vertical extended length-545mm螺栓组中心位置偏差Bolt group center position deviation3.0mm3在混凝土内的钢锚板Steel anchor plate in concrete轴线偏移偏差y、zAxis offset deviation y, z10.0mm标高偏差xElevation d

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论