



免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
. Contract Contract NO:Part A:Part B:Qingzhou SG.One Machinery Equipment Co.,Ltd 1、 Equipment name, quantity, unit price, total priceDevice nameTypeUnitAmountUnit priceTotal priceFlexo printing machineSet/setsTotal (RMB):2、 Packing standards and fees:The supplier of equipment and accessories adopt reliable pressure defense, anti abrasion, waterproof protection measures, etc. Protective packing costs shall be borne by the supplier.3、 Delivery time, location, and transportation costs1、 The time of delivery:From the deposit received postpone 30 working days from the date of delivery of the goods;2、 Place of delivery:Party A factory;3、 Transport:The supplier of packaging, good protective equipment to take the car shipped to the buyers plant, shipping costs borne by party B.4、 The supplier responsibilities and obligations:1、Equipment to the buyer, the supplier technical personnel on-site guidance unloading, lifting and installation of equipment, at the same time, ding Instructed key-module buyers personnel on the equipment, the control center, fragile parts, such as pieces of dust to identify and adoptTake strict protective measures;2、 Equipment installation and debugging:The supplier technical personnel responsible for equipment installation and commissioning, to be responsible for the buyer technical training for operators at the same time;3、 Since equipment delivery of the acceptance of the buyer, the supplier of equipment warranty for one year. During the warranty period, in addition to the consumable parts, belong to the normal operation of equipment failure or quality problems, if the responsibility Belonging to the supplier, the supplier will provide free spare parts and maintenance services. If the liability for the buyer, the supplier to provide maintenance services, only charge the cost of spare parts;4、 After the equipment to the buyer, the supplier shall give the buyer all regular equipment information provided (in duplicate), data including: electric control circuit diagram,( wiring diagram, control principle diagram and main components layout diagram electric control cabinet), operating instructions, etc., the handover routine sign handover procedures;5、 The buyer in the notification need maintenance technical service, the supplier repair response within 24 hours;6、 The supplier is responsible for the factory before commissioning the required consumables, including trial edition, ink, light oil, double-sided adhesive, scraper, and other items.5、 The buyers responsibilities and obligations:1、 Buyers responsibility and obligation: this equipment is a patented product, party a shall not to copy or the device for other units or individuals to counterfeit or surveying and mapping the device provides the convenience. Without party B permission, party A shall not make other equipment manufacturers or individuals to visit the equipment;2、 The supplier in the buyers site installation debugging personnel accommodation and food provided by the buyer, define installation and debugging and culture training time is 15 working days to complete; System installation site preparation shall be the responsibility of the buyer, the supplier for the necessary drawings;3、 Needed for the equipment installation site of water, electricity, gas source and equipment grounding line prepared by the buyer on their own, and sent to the installation of equipment.6、 Equipment debugging acceptance criteria and methods:1、 Equipment acceptance standard in the contract and the provisions of this contract in the attachment on the basis of the equipment technical indicators;2、 For equipment in the suppliers factory acceptance, acceptance inspection before shipment.7、 Payment way and deadline:1、 Advance payment: 50% of the contract price, that is, RMB yuan, the advance payment to the account contract comes into effect;2、 Send payment: pay 90% of the contract sum before the supplier delivery, that is RMB yuan;3、 Acceptance payment: after the acceptance of equipment at buyers plant commissioning, trial production run after 1 month, within 12 months pay the balance payment of the contract, 10% of the total amount of the contract, that is RMB yuan;4、 Invoice:Within one month after party B receive the full payment to party A according to open 17% value-added tax invoice.8、 This contract is a confidential contract. Both parties shall not disclose to any organization or individual in the agreement of party b to party a to provide the price of (models) devices, so as to avoid adverse impact on equipment sales to party B.9、 Attachment of contract and the contract are equally valid.10、 Solution contract dispute method: matters not both sides talks things over or through arbitration agency or court of law program is solved.11、 This contract is in duplicate, each party holds one.Party A (seal) Party B (seal) Qingzhou SG.One Machinery Equipment Co.,LtdLegal representative (signature) : Legal representative (signature) :Entrusted agent(signature): Entruste
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 私募股权投资热点行业2025年深度解读:退出策略与市场前景报告
- 2025年教育行业质量评估与认证体系下的教育质量评价改革研究报告
- 巧用剪辑做画册课件
- 交通设备制造业数字化转型下的智能仓储与配送系统报告
- 巧手做寿司课件
- 左尺桡骨骨折课件
- 五年级数学(小数除法)计算题专项练习及答案汇编
- 巡逻兵进行曲课件
- 巡检工知识培训课件
- 灌肠法操作并发症
- 公司领导财务知识培训课件
- 2025年郑州银行招聘考试(行政能力测验)历年参考题库含答案详解(5套)
- 园艺生物技术应用与发展
- 子痫患者护理查房
- 2025上海市八年级升九年级数学暑假提升讲义:相似三角形压轴题(六大题型)原卷版
- 2025年工业互联网工程技术人员考核试题题库及答案
- 农行OCRM系统讲解
- 医疗护理员职业技能竞赛试题及答案
- 2025年高端美食主题餐厅餐饮服务整体外包合同
- 体育课培训课件
- 工贸安全员考试题库及答案大全
评论
0/150
提交评论