




已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
. . . .防静电环氧地坪施工Anti-static Epoxy Self-leveling system抗静电环氧自流平地面The proposal :3mm Anti-static Epoxy Self-leveling system方案: 3mm抗静电环氧自流平地面Sikafloor 239EDF Antistatic epoxy self-leveling system抗静电环氧自流平系统Approx. 3 mm coating thickness涂装厚度约 3 mmSikafloor 239EDF is a seamless, self-smoothing, flooring system based on advanced solvent-free epoxy system and selected graded fillers. The cured floor exhibits excellent electrostatically dissipative behavior. The smooth, impervious surface can be easily maintained in a hygienic condition.Sikafloor 239EDF 是一种无接缝、自流平环氧系统,它以一种先进的无溶剂环氧树脂为基料,并采用专门级配的填充料。该地面具有优异的防静电性能,其表面形成光滑的无渗透的地面,易于保持卫生状态。Performance 性能: Electrostatically dissipative (Resistance to ground 106RG109 Ohm) 防静电性能(106RG109欧姆) High level of aesthetics and easy to clean 高度美观,易清洗 Comfort and care 舒适,安全 Smooth and seamless 光滑,无缝Structure Profile 系统结构图:防静电面层Anti-static Top-coat导电层Conductive Layer找平层 Level ayer底漆Primer混凝土ConcreteSystem Description 系统介绍:Step步骤Product & Consumption产品和用量Application Method施工方法Surface Preparation:基层处理Cleaning, grinding and shot blasting清理,研磨和喷砂处理Primer:底漆Sikafloor 161+石英砂 0.3-0.4 kg/m2 Trowel,roller刮板,滚筒Epoxy Leveling mortar环氧找平层Sikafloor 161 0.9 kg/ m2+适量石英砂 0.9kg/m2Trowel刮板Conductive Copper Tape导电铜带Adhibit粘贴Conductive Layer导电层Sikafloor 220W 0.1 kg/m2Roller滚筒Top-coat面层Sikafloor 239EDF 1.8 kg/m2+SikaDur 505 0.6 kg/m2Trowel刮板Material Description材料说明:Sikafloor 161 is a 2 component epoxy resin based, solvent free primer. Sikafloor 161 是一种双组分环氧树脂基无溶剂型底油Sikafloor 220W is a two part water dispersed, epoxy resin with high electrostatic conductivity是一种双组分水性环氧树脂,具有较高的导电性能。Sikafloor 239EDF is a two part, self-smoothing, coloured epoxy resin coating.Decorative and protective dissipative self-smoothing system for concrete or cement screeds with normal up to medium heavy wear.Sikafloor 239EDF 是双组份的彩色的环氧树脂,作为一种在混凝土表面和水泥地面导静电,装饰和保护的涂层 Sikadur 505Q is a dried fine quartz aggregate, 0.1 -0.3 mm for filling self-leveling floors and as filler in Sikafloor 156/263/264 as leveling mortar or scrape layer.Sikadur 505Q是一种干燥细颗粒骨料,0.1 - 0.3 mm ,用于填充自流平地面及用作Sikafloor161/263/264自流平砂浆或刮磨层的腻子层。Thinner DS or Thinner C is a solvent for cleaning purpose.Thinner DS or Thinner C 是用于清洁的溶剂Application Method 施工工艺Inspection Substrate Quality 基面质量检查The concrete substrate must be sound and of sufficient compressive strength (minimum 25 N/mm2) with a minimum pull off strength of 1.5 N/mm2.混凝土基面必须密实和有足够的抗压强度(最小25 N/mm2),最小抗拉强度为1.5 N/mm2。Substrate needs to be dry, moisture content 4%. Test method: Sika-Tramex meter or CM - measurement. A waterproofing layer must be installed under the concrete base,or vapor going up will result in epoxy layer bubbling and delamination. 2 mm Sikafloor 81 EpoCem system need to be applied as a moisture barrier.基层须干燥,含水率4%,测试方法:Sika-Tramex仪或CM测量法。混凝土基层下须设置防水层,否则存在水汽上升导致环氧层起泡、脱落风险。建议施工2mm Sikalfoor 81 EpoCem系统作为防潮层。The substrate must be clean and free of all contaminants such as dirt, oil, grease, coatings and surface treatments, etc.基面必须清洁、无任何污染物,如:灰尘、油、油脂、涂层和表面处理等。Measure Application Conditions 施工条件测量Substrate Temperature: +10 min. / +30 max.基面温度:最低+10/最高+30Ambient Temperature +10 min. / +30 max.环境温度:最低+10/最高+30Relative Air Humidity: 80% R.H. max.相对空气湿度:最高80%相对湿度Dew Point: The substrate and uncured floor must be at least 3 above dew point to reduce the risk of condensation or blooming on the floor finish.露点:基面和未固化的地面温度必须至少高于露点3,以防水汽凝结形成斑点。Substrate Preparation 基面处理re-clean the floor surface, degrease agent will be used where necessary.清洁地表,必要时使用清洁剂;Carry out surface preparation by using shot blasting machine (dust free self enclosed steel shot blasting unit) and hand tools to remove surface laitance and to provide sound and textured surface.使用自动无尘喷砂设备和手动工具进行表面预处理,去除混凝土表面翻沫及松散结构,并提供涂装所需的必要的粗糙度;Remove all remaining dust and debris by dry brushing and vacuum cleaning.扫除残留的钢丸及灰尘,并真空吸尘;Repair all floor defects such as honey combs, scratches, working joints and so on by using SikaDur and Sikaflex range of materials. .使用SikaDur 与Sikaflex等系列产品对地面缺陷如蜂窝麻面、划痕、施工缝等进行修补;Mixing of material 材料混合:In general, all products must be mechanically mixed using an electrical power stirrer with 300 400 rpm, prior to mixing stir part A mechanically. When all of part B has been added to part A, continuously mix for 2 minutes until a uniform mix has been achieved. Depending on the product ad in the filler or C component and mix for another 2 minutes until a uniform mix has been achieved.通常,在机械搅拌A组分之前,所有产品必须用电动搅拌器以300 400 转速/分机械搅拌。把所有B组分加入A组分之后,持续混合2 分钟直到混合均匀。根据产品加入填料或C组分,继续搅拌两分钟直到混合均匀。To ensure thorough mixing, pour materials into another container and mix again to achieve a consistent mix. Over mixing must be avoided to minimize air entrapment.保证通过混合、倾倒材料进入另一容器后,再次搅拌达到一致混合。需要避免过度搅拌产生气泡Application of Primer and Leveling layer 底油与找平层施工:Application of Sikafloor 161, consumption approx. 0.4 kg/m for primer;consumption approx. 0.9 kg/m Sikafloor 161 mixed with 0.45kg/m2 quartz sand.Sikafloor 161 用量大约0.4 kg/m;底油固化后,施工环氧砂浆层 ,2.7kg/m2 Sikafloor 161混合2.7kg/m2石英砂.Application of Conductive Copper Tape 导电铜带施工Placing Earthing Points 设置接地点Application of Conductive layer 导电层施工Apply with a layer of Sikafloor 220W, consumption approx. 0.1 kg/m.施工一层Sikafloor 220W, 每层用量大约0.1 kg/m, Checking and Measuring of Resistance 导电层电阻检测Application of anti-static Top layer 防静电面层施工After curing of the conductive layer, application of a layer Sikafloor 239EDF with a trowel; consumption approx. 1.8 kg/m Sikafloor 239EDF mixed with 0.6kg/m2 quartz sand.导电层固化后,用刮板施工Sikafloor 239EDF; 1.8kg/m2 混合0.6kg/m2石英砂;Also apply with a spike rolling for deairing and levell
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年度智能调光玻璃采光窗安装与维护服务合同
- 2025年北京纯电动新能源汽车带司机租赁服务合同
- 2025年绿色生态农业种植项目市场调研与风险评估服务合同
- 2025年企业级数据安全防护技术解决方案研发合作合同
- 2025年字画艺术装裱及公共空间美陈服务合同
- 2025年度食品容器包装材料绿色供应链采购合同
- 2025年商业空间翻新工程合同质量监督及售后服务保障书
- 2025年一宅一物金银铜赠品营销推广服务合同
- 2025年度节能减排型建筑材料采购与施工合同范本
- 电影衍生品合同
- 福建省福州市联盟校2023-2024学年高一下学期期末考试英语试题(解析版)
- 2025文化和旅游部直属事业单位招聘社会人员29人模拟试卷附答案详解
- 2024-2025学年重庆市万州区八年级(下)期末语文试卷
- 2025年乒乓球二级裁判考试题及答案
- 血标本采集考试试题附有答案
- 2025年公共安全生产试题及答案
- 员工工资及考勤管理制度
- 浙江省温州市龙湾区2024-2025学年七年级下学期学业水平期末检测数学试题
- 废料出售管理办法
- 企业干部退出管理办法
- 河南选调生管理暂行办法
评论
0/150
提交评论