




已阅读5页,还剩3页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
安哥拉投标文件须知参考资料网站United Nations Global CUniversal Declaration of Human R/en/rightsInternational Labour Standards (ILO)/global/standards/lang-len/index.htmOHSAS 18001 Healthy & Safety SInternational Organization for Standardization (ISO)General The OSH Program is part of CONTRACTORs quality management which describes the project organisation as well as contains all the procedures, instructions, specifications to steer the project execution. The purpose of the OSH Program is to define the OSH project organisation and the OSH performance criteria following CONTRACTORs “Integrated Management Manual for quality, health, safety and environment at ThyssenKrupp Industrial Solutions”. It comprises the OSH objectives and requirements transformed into observable and auditable parameters and procedures, customised to the Project adapting COMPANYs OSH requirements and procedures as stated by the CONTRACTThe OSH Program The first issue mainly determines the basic OSH requirements for the site. Additional supportive procedures/instructions will be implemented in the course of the project as required by the sequences of construction and subsequent commissioning works. The OSH Program is preliminary and subject to approval by COMPANY, if necessary.2.3 Corporate PolicyCONTRACTOR recognises OSH as a fundamental mission and expresses his commitment in the Quality, Health and Safety Policy which is part of Contractors Integrated Management Manual and consistent with the ThyssenKrupp OSH policy. Both will be available to all concerned. (see next page)OSH personnel within the SUB-CONTRACTOR Site Organization: 1 OSH Manager (fulltime) Appointed by SUB-CONTRACTOR Minimum 1 OSH Supervisor (fulltime) Appointed by SUB-CONTRACTOR (Only where the workforce employed is below 50 worker may a Safety Supervisor be a responsible with other duties in addition to that of Safety Representative) Site OSH Officer Appointed by each SUB-CONTRACTOR depending on the number of employees at the construction site according to the table below: Note: OSH Site Personnel shall have ability to speak and understand ENGLISH. Minimum one Safety Representative must be on site at all times (day shift / night shift) during the execution of the works. SUBCONTRACTORs Site Representatives/Managers are responsible for OSH of their own activity, personnel and property on site assigned to their scope of work. They shall also be responsible for compliance with all local statutes, rules, regulations and orders applicable to the conduct of the Work and for ensuring that CONTRACTORs OSH requirements, as referenced above, are read, understood and implemented throughout the duration of the Contract.Subcontractors shall submit their own OSH Program, complying with this OSH Program and all COMPANY requirements as per section 2.5 (table), for approval prior start of work to CONTRACTOR. Where applicable, method statements shall be submitted to CONTRACTOR for comments. Method statement related to works performed in commissioning or live facilities and/or critical activities shall be prepared in advance in close co-ordination with CONTRACTOR. Subcontractors, in addition to working according to their own approved standards, shall meet the requirements of CONTRACTORs OSH Program. SUBCONTRACTORs Construction Site Manager shall be supported by an OSH team composed by OSH Supervisors and OSH Officers assigned to the construction areas. Lacks of agreement shall be reported to the Site Manager for resolution. SUBCONTRACTORs Site Representatives/Managers are responsible for OSH of their own activity, personnel and property on site assigned to their scope of work. They shall also be responsible for compliance with all local statutes, rules, regulations and orders applicable to the conduct of the Work and for ensuring that CONTRACTORs OSH requirements, as referenced above, are read, understood and implemented throughout the duration of the Contract.3.3.2 SUBCONTRACTORs OSH Responsibility The SUBCONTRACTOR shall have in place, dedicated health and safety management systems that ensure that appropriate standards of health, safety and environment are maintained. SUBCONTRACTOR shall implement policies, procedures and an appropriate culture to meet the following core requirements: A senior person is designated with the responsibility for OSH; Roles and responsibilities regarding OSH are clearly defined throughout the SUBCONTRACTOR organisation; The SUBCONTRACTOR has access to appropriate levels of expert health and safety advice; Appropriate systems and processes are in place, together with the allocation of adequate resources to identify and address the risks associated with the delivery of the products and services by its employees, Subcontractors, further sub-contractors and any other third parties; The health and safety training needs of its employees, Subcontractors and further subcontractors are assessed and the appropriate level of training delivered to ensure that all persons are trained to perform their tasks in a safe manner; OSH performance is continually monitored and reviewed through programmes of inspections, testing and audits; and The regular submission of OSH data to CONTRACTOR, attendance at meetings and participation in audits as required by CONTRACTOR acting reasonably. SUBCONTRACTORs Site Representatives/Managers are responsible for OSH of their own activity, personnel and property on site assigned to their scope of work. They shall also be responsible for compliance with all local statutes, rules and regulations applicable to the conduct of the Work and for ensuring that CONTRACTORs OSH requirements, as referenced above, are read, understood and implemented throughout the duration of the Contract. Subcontractors shall submit their own OSH Plan for approval prior start of work to CONTRACTOR. Where applicable, method statements shall be submitted to CONTRACTOR for comments. Method statements related to works performed in commissioning or live facilities and/or critical activities shall be prepared in advance and in close co-ordination with CONTRACTOR. Subcontractors, in addition to working according to their own approved standards, shall meet the requirements of CONTRACTORs OSH Plan. SUBCONTRACTORs Construction Site Manager shall be supported by an OSH team composed by OSH Supervisors and OSH Officers assigned to the construction areas. Lacks of agreement shall be reported to the Site Manager for resolution.4.11 Subcontractors OSH Plan SUBCONTRACTOR shall prepare and implement their own OSH Plan, in co-ordination with CONTRACTOR. These OSH Plans shall include all the pertinent OSH topics as stated by COMPANY and CONTRACTOR. Each SUBCONTRACTOR shall assign an OSH Supervisor/Officer to participate in the implementation of the OSH Committee activities. SUBCONTRACTORs OSH Officers will specifically participate in the Safety Pool Meetings.5.5 Competent / Qualified Person Designations Definition of Competent Person: An individual who by experience and training is knowledgeable of the work activity and all potential hazards and safe work practices related to this activity. A list shall be prepared, and forwarded to the Site OSH Manager, of competent persons for the major activities associated with the work of every SUBCONTRACTOR. In particular, the list shall include: excavation scaffolding rigging hot tapping tie-ins permit receiver Also a list of qualified/specialised persons shall be drafted including: welders hot tapping tie-ins welders cranes and lifting equipment operators mechanical equipment operators electricians ionising equipment operators (if applicable) 5.6 Conduct Personal behaviour must be exemplary for all employees and shall not offend the normal code of conduct established by National laws, good moral habits and CONTRACTORs rules. No activity outside the scope of work shall be done unless authorised by CONTRACTOR/COMPANY.5.10 Housekeeping . 35 5.11 Signs and Tags . 36 5.12 Flagmen . 37 5.13 Excavation and Trenching . 37 5.14 Fall Protection . 38 5.15 Barriers. 39 5.16 Scaffolds and Platforms . 39 5.17 Floor, Roof, Wall and Platform Openings . 39 5.18 Ladders . 40 5.19 Hand, Air, and Electrical Tools . 40 5.20 Machinery . 41 5.21 Cartridge Operated Tools . 41 5.22 Welding and Burning . 42 5.23 Liquefied Petroleum Gas and Acetylene . 43 5.24 Compressed Gas Cylinders . 43 5.25 Radiography . 44 5.26 Cranes and Material Handling . 44 5.26.1 Construction Plant . 44 5.26.2 Cranes . 44 5.26.3 Control of Non-Conforming Equipment. 445.27 Rigging . 45 5.28 Lifting and Rigging Plans . 46 5.29 Suspended Personnel Platform . 46 5.30 Elevators for passengers and freights . 46 5.31 Articulating Boom Platform . 47 5.32 Forklift Trucks (Powered Industrial Trucks) . 48 5.33 Vehicle Operation . 48 5.34 Roll-Over Protective Structures (ROPS) . 49 5.35 Fire Prevention and Protection . 49 5.36 Fire Watches . 50 5.37 Hazard Communication . 50 5.38 Emergency Flushing, Eyes and Body . 51 5.39 Electrical Equipment and Temporary Power Supply on Site . 51 5.40 Lockout / Tagout Procedure . 52 5.41 Colour Code Procedure . 52 5.42 Flexible Cords and Cables (Extension Cords) . 52 5.43 Guarding . 53 5.44 Identification . 53 5.45 Listing and Labelling . 53 5.46 Openings . 53 5.47 Safety-Related Work Practices. 53 5.48 Splices . 54 5.49 Steel Erection . 54 5.50 Concrete and Masonry Work . 54 5.51 Slip Formworks . 56 5.52 Underground Construction . 56 5.53 Office Safety. 57 5.54 Temporary Heating and Ventilation Devices . 58 5.55 Drinking Water . 58 5.56 Washing Facilities . 58 5.57 Lunch Rooms . 59 5.58 Toilets on construction site . 59 5.59 Exits . 59 6 HEALTH . 606.1 Medical screenings . 60 6.2 First Aid Facilities and Emergency Medical Services . 60 6.3 Alcohol and Drugs . 60 6.4 Health and Hygiene . 61 6.5 Sanitation . 61 6.6 Pest Control . 62 6.7 Eating and Drinking Facilities . 62 6.8 Camp Safety, Hygiene, and Provision of Dr
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 合伙经营事故车买卖协议书6篇
- 平面法向量课件
- 工业安全培训案例课件
- exo-β-1-4-xylosidase-Bacteroides-ovatus-生命科学试剂-MCE
- 营口事业单位笔试真题2025
- 河北公务员真题试卷
- 婴幼儿配方食品营养配方在婴幼儿营养素吸收中的营养素配比市场分析报告
- 2025年中国新能源汽车出口市场在欧洲市场拓展策略分析报告
- 农发行延边朝鲜族自治州龙井市2025秋招半结构化面试题库及参考答案
- 2025年风电叶片叶片叶片制造产业绿色低碳发展报告
- 2025年气象系统公务员录用考试面试真题模拟试卷(结构化小组)
- 风力发电项目审批流程及要点梳理
- 跨境电商第三方物流合作中的三方保密协议及责任划分
- 医院污水站维护方案(3篇)
- 2019ESCEAS血脂异常管理指南2025重点更新解读
- 视频监控考核管理办法
- 《现代传感与检测技术》教学大纲
- StarterUnit3Wele!SectionB1a1e(教学设计)人教版七年级英语上册
- 快递安全收寄培训课件
- 安全及节能驾驶培训内容课件
- 抖音公会入股合同协议书
评论
0/150
提交评论