漆包线制造FMEA.doc_第1页
漆包线制造FMEA.doc_第2页
漆包线制造FMEA.doc_第3页
漆包线制造FMEA.doc_第4页
漆包线制造FMEA.doc_第5页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

XINLONG MAGNET WIRE CO.LTD3 Process Potential Failure Mode Effects AnalysisFMEA No. FM-002(PFMEA)page 1 of 2 Project: enamelling processProcess responsibility: manuf.&tech. dpt. Prepared by: Tu Jinqiang Team member: Tu Jinqiang, Deng Zhihua Xiao Yong, Qi Shun Date: Oct.17 2003 FMEA date(original) Oct.17 2003 (revise) ProcessFunction/Reqrmt.PotentialFailur modePotentialEffects of FailureSCPotential cause/mechanism of failureOCurrent processcontrolDR.P.N.recommended actionResponsibility&target completion dateaction resultActiontakenSODR.P.N.Enamel the wire enamel on the bare wire,after curing,the magnet wire should meet all requirmt. Dimension:overall diameter out of standardDimension:bare wire tolerance out of standardsurface:have tiny beadEffect the wire assemblyInfluence the resistanceInfluence the appearance464Improper enamelling die; Improper felt regulating or the felt is used too long.the bare wire tolerance out of standard before enamelling;the wire thinned down during enamelling;Improper felt used or the felt is used too long;the enamelling die is dirty;the machine is not clean enough657inspect each spoolinspect regularly and take 20% for spot inspection inspect each spool2424812056Change enamelling die;regulate felt or replace the felt regularly;Inspect each spool of bare wire before enamelling;regualate the tension according to the work instuction;Regulate or replace the felt regularly; replace the enamelling die; clean the machine regularlyWire enamelling workshopOct.31 2003Wire enamelling workshopOct.31 2003Wire enamelling workshopOct.31 2003All the proposed action have been practised464234232165432Remarks: S is short for severity, C is classification, O is occurrence, D is detection, R.P.N. is risk priority number. Prepared by:Tu Jinqiang audited by:Shan Maogang XINLONG MAGNET WIRE CO.LTD3 Process Potential Failure Mode Effects AnalysisFMEA No. FM-002(PFMEA)page 2 of 2 Project: enamelling processProcess responsibility: manuf.&tech. dpt. Prepared by: Tu Jinqiang Team member: Tu Jinqiang, Deng Zhihua Xiao Yong, Qi Shun Date: Oct.17 2003 FMEA date(original) Oct.17 2003 (revise) ProcessFunction/Reqrmt.PotentialFailur modePotentialFailur effectSCPotential cause/mechanism of failureOCurrent processcontrolDR.P.N.recommended actionResponsibility&target completion dateaction resultActiontakenSODR.P.N.Enamel the wire enamel on the bare wire,after curing,the magnet wire should meet all requirmt. surface: oxidationPerformance:pin-hole exceed the standardPerformance:the film crackedInfluence the appearance or it maybe influence the electricity performaceInfluence the electricity performanceLead to the electrical appliance failure678The bare wire is oxidized or it became oxidized during annealThe production condition unreasonable; the wire was scraped during production; the production is need to be cleaned. The production condition unreasonable;the wire enamel is improper;The machine is not well regulated. 453inspect each spoolthe operator inspect and take spot inspection inspect each spool223487072Inspect each spool of bare wire before enamelling;inspect the wire according to the work instruction. Regulate the production condition; clean the machine regularly; inspect the wire according to the work instruction.Regulate the production condition; replace the wire enamel; regulate the machine well before production.Wire enamelling workshopOct.31 2003Wire enamelling workshopOct.31 2003Wire enamelling workshopOct.31 2003All the proposed action have been practised678222223242848Remarks: S is short for severity, C is classification, O is occurrence, D is detection, R.P.N. is risk priority number. Prepared by:Tu Jinqiang audited by:Shan Maogang XINLONG MAGNET WIRE CO.LTD3 Process Potential Failure Mode Effects AnalysisFMEA No. FM-001(PFMEA)page 1 of 1 Project: wire drawing processProcess responsibility: manuf.&tech. dpt. Prepared by: Tu Jinqiang Team member: Tu Jinqiang, Ding Changsheng Jiang Xien Date: Oct.17 2003 FMEA date(original) Oct.17 2003 (revise) ProcessFunctionReqrmt.PotentialFailur modePotentialFailur effectSCPotential cause/mechanism of failureOCurrent processcontrolDR.P.N.recommended actionResponsibility&target completion dateaction resultActiontakenSODR.P.N. Draw the copper wire into bare wire of specific diameter Dimension:the diameter of the wire out of standardsurface: burrperformance; the longation of the wire is bad. the dimension of the magnet wire out of standardInfluence the surface and the electricity performace of the magnet wire.Influence the processing performance of the magnet wire.875Improper drawing die dimension; the drawing die is worn out.The drawing dies are not smooth;improper PH value of the drawing coolant or the drawing coolant is not clean; the copper is not good.Annealling unduly or insufficiently445inspect each spoolinspect each spool take spot inspection 2246456100Replace the drawing dies; inspect the dimension of the drawing dies regularly.Replace the drawing dies; regualate the PH value of the drawing coolant; inspect the drawing coolant regularly; change the copper rod.Regulate the anneal voltageWire drawing workshopOct.31 2003Wire drawing work

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论