




已阅读5页,还剩7页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Advance Procurement of Material through Project Systems (PS)Written by Uddhab Paul (105159)Reviewed By Tapan Agarwal (49534)Date 24.09.2008Project DetailsH/W PlatformIntel PentiumS/W PlatformSAP R3 release 5.0Application TypeERPProject TypeImplementationPurpose: This document gives a detailed description of how to go for Advance Procurement of Materials through Project Systems. This scenario is suitable for Engineered to Order process where many long lead items are procured well in advance before making the BOM to give the delivery of the finished product on time.Declaration: I hereby declare that this document is based on my personal experience(s). To the best of my knowledge, this document does not contain any material that infringes the copyrights of any other individual or organization including the customers of Infosys. References:/What is Advance Procurement?The Advance Procurement function is to generate preliminary requirements when you assign a material component to a network activity. Preliminary requirements cover real requirements that are generated at a later point of time. This is useful if material components have a long replenishment time (planned delivery time or in-house production time). ScenarioLet us assume that we have received an order as Engineered to Order scenario. Here after receiving the order, the designing activity will start and a proper GA drawing will be prepared at a later stage. However some of the long lead time items like iron plates, bushes, motors, clutches, bearings, etc can be procured in advance. Afterwards when a real requirement is generated and the system finds a component for which a sufficiently large planned independent requirement exists in the same individual stock segment, then these requirements will be set off against each other. This means that if an advance procured item is there in one WBS and the real requirement is there on the same WBS, the system will automatically set off the advance procured items. This feature will help to plan for long lead items well in advance and thus enabling to meet the delivery date of the customer. A structural presentation is given as below.Project DefinitionInquiryQuotationOrder ReceivedSales OrderWarrantyEngg & DesignPre SalesSupplyInstallation & CommissioningLong Lead BOM (Advance Procured Item)Detailed Design and GA preparationDetailed BOMGenerate PR / PIRMRP runManufacturing ProcessSub AssemblyManufacture ofLong Lead BOMSet off Advance Procured ItemsPurchase OrderPurchase RequisitionPlanned OrderProduction OrderStock IssueFig1: ETO scenario: In view of Advance Procured ItemsSteps to create the Advance Procured MaterialStep A: Define Procurement Indicators for material components (T-code: OPS8)(SPRO Project System Material Procurement Define Procurement Indicators for Material Components)The procurement indicator is defined to initiate the generation of requirement through the Project System.We can define procurement indicators for frequently used combinations of settings for procurement. The indicator combines the following parameters:1. The priority for plant stock, project stock, and sales order stock; this determines in which stock the components are kept.2. Indicator for Purchase Requisition in network, Third party orders and Preliminary requirements3. Item category for Stock Item (L), Non Stock Item (N), etcStep B: Define Checking Rule for Availability Control (SPRO Project System Material Availability Check Define Checking Rules)This checking rule is to be defined for the Project System.Step C: Define Checking Scope (T-code: OPJJ)(SPRO Project System Material Availability Check Define Checking Scope)Assign Availability Control i.e 02 (Individual Requirement) to the Project System (PS) Checking Rule Step D: Define Checking Control (T-code: OPJK)(SPRO Project System Material Availability Check Define Checking Control)The plant (1011) is being assigned to the Order Type / Control Key (PS01) and Business Function (2)The material availability is being checked for a particular combination of Plant / Order Type / Availability Check. Step E: Go to Project Builder (CJ20N) and attach the material in the activity.1. PIR generation: Assign the material to the particular activity. Select the Procurement Type (ZAP) and Item Category (L) with the requirement date (29.09.2009) and quantity (1 No.). Then Save it.The Requirement can be seen in MD042. PR generation: This is for the direct PR generation through the Project Systems. Assign the material to the particular activity. Select the Procurement Type (ZPR) and Item Category (N) with the requirement date (29.09.2009) and quantity (2 Nos.). Then Save it.The PR number (10002431) will be displayed in the Project SystemThe Requirement can be seen in MD04Step F: Now run the MRP in MD02 (Material Level) or in MD51 (Project Level) Step G: The generat
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年项目生命周期管理试题及答案
- 软件设计师考试注意事项笔记试题及答案
- 上岸之路2025年法学概论考试试题及答案
- 2025年软考设计师问题总结试题及答案
- 风险管理方案的实施与评估试题及答案
- 网络故障快速恢复技巧与配置试题及答案
- 2024年四川省工商局下属事业单位真题
- 财务工作中的伦理与责任计划
- 2024年南阳职业学院辅导员考试真题
- 员工满意度调查的设计与分析计划
- 2025年福建泉州晋江水务集团有限公司招聘笔试参考题库含答案解析
- 采购大合同范本
- 幼儿园食堂6S管理培训
- 成人重症患者颅内压增高防控护理专家共识2024
- 旅游景区餐饮服务食品安全培训课件:为游客提供放心饮食
- 2022输变电工程档案管理实施细则表
- 低空经济专业教学资源的建设与优化策略
- 行政赔偿决定书格式和范文
- AIAG手册FMEA第四版资料
- XXXX小区物业费欠费台账(自动更新到当前日期)
- 《胶体与界面化学》课件
评论
0/150
提交评论