SWMS 墙板的安装.doc_第1页
SWMS 墙板的安装.doc_第2页
SWMS 墙板的安装.doc_第3页
SWMS 墙板的安装.doc_第4页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Safe Work Method Statement Preparation Worksheet安全施工方案Company Name 承包商名称:: Project Name / No 项目名称编号 Work Activity / Task 工作内容:Note: Sign off to be provided at Tool Box talk 注:工人交底签名Date duration时间: 到Prepared by:编制人员 Equipment will be used: 使用的工具设备:Electric Screw Guns 电枪、电钻Item项目Job StepBreak the job down into steps.工作步骤Potential HazardWhat can harm you or others?潜在危险,是否伤害您和他人?ControlsWhat you are going to do to make the job as safe as possible.控制风险,您打算如何做到更安全的Person Who Will Ensure this Happens.负责人员,由谁负责消除危险123Locate material to storage area.堆放材料Transport material to roof将材料运至屋面Installation of wall panel墙板的安装Falling materialFalling person材料坠落人员坠落Falling MaterialFalling Person材料坠落人员坠落Location Electrocution电击Falls坠落Wall Panels are small and light, and will be carried to the roof of the Production Building and stored inside the building on level 3. This material will only be transported from level 3 to roof level on a day to day basis, no materials to be left on roof overnight墙板都较小较轻,并首先将墙板运至三楼,然后再将其运至屋面。将墙板运至屋面工作都必须在白天进行。Access to roof via stairways already installed, worker will stand on platform at top level and pull up material then pass the material through existing door openings to worker on roof.Area below will be flagged off and warning notices posted.站在顶层的平台的工人通过门洞将材料送至屋面的工人材料提升区域用警示彩旗圈定Fixing location is 60 metres from roof eaves. Electric Screw guns to be tested and accepted as per JAQ standard regulary.Connections to equipment to be certified 圈定自屋檐60米区域,将电枪电钻送检宝维士Worker to wear full body safety harness高空作业工人穿戴全身式双扣双绳安全带Unqualified persons restricted access.禁止不合格人员入内No work allowed if winds exceed safety limits风力超过2级禁止作业Pay attention to weather forcasts留意天气预报,关注天气变化Jason DongReviewed by Contractor Safety 承包商安全负责:_ Reviewed By Jian Li Safety 监理安全人员:_Reviewed by JAQ Engineer JAQ负责工程师 :_ Reviewed by JAQ Safety Personnel JAQ负责安全人员 _Safe Work Method Statement安全施工方案编写表Project Name Amkor项目名称Location, Production Building项目地址Resources of the Work与该项工作相关情况Starting Date and Time: From To开始日期和时间: 从 到Exactly Work Area Penthouse walls Above level 3 Grids S and U确切的施工地点:Task/Activity ( Job description of the activity/operation) Install vertical wall panels to cover exist Louvres, these panels supplied to correct length and fixed to outside face of the existing louvers.工作、施工活动内容:Equipment Used: Electric Screw Guns所使用的工具设备:Maintenance Checks: (List the checks required if necessary, e.g. monthly checks on electrical equipment, daily checks on significant items )维护检查:(列出所需进行的检查,如电气设备月检,重大内容日检等)Material Used Wall Panel BS 365所使用的材料:Trade Involved ( State the type of trade workers involved) Cladders各工种相关人员(列出各个专

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论