蓝皮书翻译.doc_第1页
蓝皮书翻译.doc_第2页
蓝皮书翻译.doc_第3页
蓝皮书翻译.doc_第4页
蓝皮书翻译.doc_第5页
已阅读5页,还剩13页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

蓝皮书翻译封面the operation instructions of JK-D new type quick hoisting machine1. the no. of national industry products production permit : xk21-218-00004the no. of patent license :99 3 36200.12. Zhengzhou Dacheng Construction Machinery Co., Ltd. (the former Zhengzhou City Mangshan Hoisting Machinery Co., Ltd.3. the brief introduction封二企业概况4. The former of the co. was Zhengzhou City Mangshan Hoisting Machinery Co., Ltd.(the former Zhengzhou Mangshan Zhongli Construction Machinery Factory) , it is the professional factory that produces the new type construction machinery. There are a batch of scientific technicians that have rich experiences and are busy doing the development of new products. The co. has completed equipments, crafts and testing methods. Quality as the life of the enterprise, there are completed quality guaranteed system, and the quality of the products reach the advanced level in the same industry.The “Zhongli” brand electric control quick gear satellite drive construction hoisting machinery won the state patent( the patent no.: 9 3 36200.1) ; and the SS120 style construction lift thats designed by China construction scientific researching institute and improved by our co. has won two items of state patents (the patent no.: 200420011274.2 and 200420011275.7); and has passed through the style testing of the state construction municipal building machinery quality supervision center, and has been issued the production permit (the no. : XK21-218-00004) and the manufacture permit of special equipments (the no.:TS2441004-2008) by the state quality supervision bureau. The JK1.25D hoisting machinery and SS120 construction lift has passed through the scientific technological achievements appraisement of Henan construction department, and won the new technology and new products spreading certificate of construction scientific technology. All the above products have been registered in Henan construction department, Hubei construction department, Zhengzhou City construction committee and Suizhou City construction committee.The purpose of our co. is : continually improve the products design and the quality, service for the clients. For many years, the products have been sold well to over 20 provinces , cities and abroad. We hope that “Zhongli” brand construction machinery would establish benefits for you. Lets cooperate and establish the new brilliance in the future.5.warnings:Please recognize the trademark, these are patent products, we will attack the imitations. The products are continually been improved. The material object is just as standard.目录contents 1. profile2. the style and the main parameters3. the main characteristics4. installation5. test run6. operation 7. maintaining and repairing8. the common breakdown and fixing method9. the subsidiary table of bearing and oil seal10. the principle diagram of electrical appliance wiring and the specifications of main components11. the drive system of JK-D style quick hoisting machinery12. the diagram of JK-D style quick hoisting machinery第一页1. profileJK-D style hoisting machinery applies the gear satellite drive, is the new hoisting machinery of mechanical and electrical organically, it has series of strong points: intense structure, small voltage, light weight, convenient installation, is the replacement product of the traditional hoisting machinery. It can lift the construction materials, components, equipments in the building project. Also can be used in the mine, wharf, bridge, warehouse, etc. JK-D new type hoisting machinery can be set with the construction lift and elevator, and connect the overload restrict appliance, the upper, below restrict appliance with the circuit in the control box, these can meet the demand of the state standard GB10055-1996 safety principle of construction lift and the state industry standard JGJ88-92 .2. the style and main parametersthe note of hoisting machinery diagram is as follows:D. refers to the new type codeMain parameters: the rated force K. refers to quick, G refers to high speedJ. refers to hoisting machineryThe main parameters of JK-D hoisting machinery参数名称(单位)name of parameters (unit) 参数 parameters 型号 stylethe rated force of wire rope the diameter of wire ropethe rated speed of wire ropethe diameter of rolling the rope of rolling the quality of the whole machinerythe overall sizesthe installing size of foundation第二页8.3. the main characteristics1) reliable, long usage lifethe main components uses high quality steel, the castings uses nodular cast iron, the drive components are hot processed, lubricate, run stably. All the drive structure are sealed. So the products have the long usage life and save the repair fee.2) the brake function is stable and reliableApply the new ZD series tape brake motor, the motor has brake instrument, can brake stably. When its energized, the brake opens automatically, and when its turned off, the brake close.3) run stably, low noiseApply the gear satellite drive instrument, it runs stably. And the drive gear, fixed pin, eccentric axle are proofread and corrected by static, motion equilibrium, reduce the vibration and noise, and improve the working environment.4) convenient to use and maintain.Apply the press button operation, safe and convenient. There are two operation room for the clients, generally, the driver sits on the chair to operate, also can operate under the press button. The drive system of the whole machine is sealed completed, so the lubricating system cant be polluted, you need to add the lubricating oil and test the bolt.5) new design, advanced technology, intense structure, small weight4. installing According to the usage condition, there are 2 installing methods, the clients can install according to the actual conditions. You can fix the hoisting machinery on the crane, or fix it on the base of the cement.Notes for installing:1) the hoisting machine can fix on the cement or on the machine. The foundation bolt must be equipped with lock instrument.第3 页2) the guiding gears central line must vertical with the central point.3) To guarantee the wire rope to list in good order, the distance between the guiding gear and hoisting machine is no less than 20B (for the vertical and horizontal directions)L: the distance between guiding gear and hoisting machineB the width of roller The installing position diagram of hoisting machine4) When choose the installing position, the place should be convenient for the driver to watch.5) Set the workshop or shelter to protect the hoisting machine from the sun, rain and humidity.6) The machine structure of hoisting and shell must touch the ground, the ground resistance is less than 10.第4 页 JK-D型卷扬机安装尺寸 the installing size of JK-D style hoisting machine 5. test run The hoisting machine has been tested according to the state testing principle and the related regulations, and vacancy test, rated load, motion, static overload test. Please obey the following rules for your safe usage.1) After being installed, before run test, you should test overall.(1) the damage of the components and the connecting bolt(2) the oil quantity of gear box lubricating oil (3) the insulation resistance of electric engines control box is larger than 0.5M, the grounding resistance is less than 10.(4) If its correct that the power switch to control box, control box to electric engine, and the package is correct or not(5) The power lead wire must use the rubber Cu cable, ZD 13KW use 10mm2, ZD 7.5KW use 8 mm2 , ZD3KW use 4 mm2 . The three phase reaches balance, the supply voltage cant surpass 10% of the rated voltage. Forbid to use when the voltage of electric engine is below 90% of the rated voltage.(6) The hoisting machine use the new electric engine with brake instrument, it not only can revolve, but also can do the axial running about. Under the axial running about, when the brake is turning on or off, the amount of axial running about is between 1.5mm to 2mm.2) the steps of testing runAfter being overall test, confirm to meet the demands, the clients can test run, the steps are as follows:(1) vacant test第5页the vacant test of right and opposite directions to test the shock, vibration. To test the brake is reliable , the procedure of vacant run is : right run 6 seconds, stop 14 seconds; opposite run 6 seconds, stop 14 seconds. Every vacant run is not surpass 5 minutes.(2) After the vacant test, roll the wire rope, and fix an end of the wire rope with the press plate.(3) one end of the wire rope should be drawn forth from below of the roller,the drawn equipment, the connection parts and methods are decided by the clients, commonly use the rope to fix.(4) If need connect with the switch, test to these safety instrument.(5) The clients should make correct set according to the rated lifting weight and lifting equipment, the rules of lifting machinery technological test, do the rated load, static ,motion test, do the overall test.After doing the above tests and confirm normal, the machine can be put into use.6. usage and operation1) Please read the operation instructions of hoisting machine.2) The operation staff must be trained before operating the machine.3) After the installment of the hoisting machine and being tested to be qualified, the hoisting machine can be put into use.4) Every shift must test before usage.第6页A. If the wire rope are in the slotB. If the connecting fittings are flexibleC. If the lead wire is worn outD. If the brake is effectiveE. If the lubricating system is sufficientF. After the rain and snow days, the operation staff should test the electric system5) the notes of usage:A. pay great attention to operationB. When use each time, lift the weight objects low to test the brake effectiveness.C. When the wire rope being used to the largest length, the wire rope left on the roller is no less than 3 rings.D. Pay attention to if there is vibration and abnormal noise.E. The wire rope on the roller must be listed in good order.F. If it breaks down in the usage, the operation staff must stop at once. And lift the weight object to the ground, its forbidden to test when running, and must turn off the power.G. Its forbidden to overload.H. Pay attention to test the temperature of the electric engine, dont surpass 606)After having used the machine, you should turn off the power and the switch of key.7. maintaining To make maintaining is the key methods to prolong the usage life, reduce charges and improve the economic benefits. Please note:1. After being used, the special staff should maintain it.2. when the machine was produced, it has been add lubricating oil, after installment, it should be added the oil again. The lubricating amount of reduction box is JK0.75D 1.5kg, JK1-2D 2-2.5kg. In summer, you should use 40# diesel engine oil, in winter, you should use 30# , and after the new machine being used 10 days, should change the new oil, every 3 months, should change . Please test, if there is leakage, you should add.第7页润滑周期表 lubricating periodic tableno. position name of lubricating oil and specifications periods oil adding methods1 reduction box in summer 40 # 3 months dump in in winter 30# 2 axle joint 4# Ca base lubricating oil 6 months paint3 the bearing at the ends of electric engine 4# Ca base lubricating oil 6 months pour in3. Pay attention to the adjustment of the brake moment, the running about amount between 1.5-2 mm, the brake effect is the best.A. the inner brake tape structure is as follows (7.5kw or below it), the main axles adjusting procedure is as follows:(1) loosen the lock screw of the nut 1(2) revolving the nut clockwise until the end(3) revolving the nut anti-clockwise one to one and a half ring, lock the screwB. the outer brake tape structure electric engine is just as the diagram (13kw and over 13kw), the adjustment procedure is just as follows:(1) erect the electric engine on the foundation, make the output end face down, and suspend.(2) Unload the wind window 4, loosen the lock screw of nut 5.第8 页(3) Revolving the lock nut 5 anti-clockwise to the suitable position.(4) Press the axle end to the bottom, draw the brake wheel 2 , and make it close to the tape of behind cover, revolve the nut 5 clockwise, make it touch with the brake wheel, continually revolve the nut for one to one and a half ring, lock the screw and wind window.(5) If its not convenient to adjust the whole machine, the client can unload the wind window, and revolve the nut 0.5 to 1 ring according to the wearing of the brake plate.8. the common breakdown and the repairing method第9页序号 no. 故障 breakdown 主要原因 the main course 排除方法 repairing method1 after starting up the machine, the electric engine doesnt work, it cant lift the weight overload the voltage is lower 10% than the rated voltage the electric appliance breaks down, the leading wire is turning off the brake wheel rust together with the behind cover, the power in the cable is too thin and long. The electric engine break downA. forbid overloadB. normal voltageC. test the electric appliance and lineD. unload the brake gear and wash the rust, exchange the cableE. deal with as no. 92. the unreliable brake, the gliding distance surpass the demand the abrasion of the brake ring is too serious, the spring pressure become small the brake ring is not in good touch with the tape there is oil on the brake surface the brake ring is relaxed the pressure spring overload the chain axle is not effectiveA. exchange the brake ringB. unload to repairC. unload to washD. exchange the brake ringE. exchange the springF. test the connect part3.the temperature of the electric engine is too high overload being used too frequently the space between the axle of brake is too smallA. forbidB. operate according to the operation instructionsC. adjust the space4. noise of reducer is too big lack lubrication, the foundation is not even the gear is worn out, the space is too big the gear is damaged the bear is damagedA. to add the lubricating oil, adjust and test5. when it start up, the electric engine make noise the power and electric shorten phase the connection appliance is not in good touchA. to test shorten phase or change the connection appliance6. when the weight object was lifted in the middle air, when stopped, it didnt start up the voltage is too low shorten phasewhen the voltage is normal, start up it and test the course.7. After being started up, it cant stop touch of the connection appliance was smelt the press button is not effectiveA. turn off the power and repair, or change the press button8. the reducer leak oil the oil seal is not effective the screw is not tightenA. repair or change the sealing ringB.tighten the screw9. there is rubbing in the spaceforbid the rubbing in the space, the course is that: the supporting ring worn outA. change the supporting ring, leave even space, every side is 0.35 to 0.55mm, or send to the co. to repair10. cant start up in the winter the lubricating oil is too thick, the electric engine cant be started upA. pour 0.5kg diesel oil to dilute the lubricating oil, then pour the hot water on the outside of reducer, at last, change the lubricating oil (40# diesel oil in summer, 30# diesel oil in summer)第10页九轴承及油封明细表 9. bearing and oil seal table JK-D style quick hoisting machines bearing and oil seal table机型 style 电机轴承型号 the style of electric engine bearing 数量 number 油封,O型圈规格 oil seal, O style ring specification 第11页11. the wiring diagram of electric appliance and specification of the main components the wiring diagram of electric appliance 电器接线原理图电气元件表 electric component table序号no. 名称name规格 specification1. electric engine2. power switch3. the connection appliance4. hot relay5. press button6. control guaranty(If there is changes in the diagram, we dont notice) the material object is the standard.第12页JK-D style quick hoisting machines drive system1. electric engine 2.the front supporting base 3.the flexible axle instrument 4.axle5.floating pin plate 6.bearing 7. rope roller 8.inner gear ring 9.position end cover 10.fixed pin plate 11.bearing 12.the back supporting base 13.pin axle 14.axle cover 15.satellite gear 16.bearing 第13页12. JK-D style quick hoisting machine diagramThe lock nut M36*1.5ScrewTape brake ringElectric engine ED seriesFront supporting baseThe press plate for wire ropeAxle applianceRope rollerAxle Sealing ringOil seal press coverBearing Floating pin coverBearing O type sealing ringBearing Ring Inner gear ringSatellite gearPin coverPin axleOil screwLocation end coverHanging ring screwPress cover of bearing Sealing ring Press cover of axle endFixed pin plateKey 20*70Behind supporting baseThe foundation base of hoisting machineName or specificationA 向视图 A direction view征求产品质量意见书 the advise for the products qualityDear sir or madam:Our co. has advanced technology and crafts, can meet the clients demand. To strengthen the supervision to our products quality and improve the quality, we ask for your advise about all kinds of the hoisting machine. Please fill in the information table and post to the quality office to help us to improve the quality, and we will supply the better service for the clients. Yours sincerely

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论