


全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
WPC Extrusion Line OperationPrepare for starting up.extruder:1-Check up the feeder,hopper.make sure thers are no foreign matters in the barrel.Clean up them When you find it.2-Check up all the fans of screw is in good condition.3-Check up the vacuum equipment of extruder is unobstructed and guarantee vacuum degree not Less than -0.08Mpa.Clean up material which is in vacuum container when the vacuum degree is lower than -0.08Mpa.Even the vacuum degree is normal it should be cleaned up two times per shift.Do not use metal tools to clean air-bleed hole which on the barrel.Use plastic or wood stick.Auxiliaries equipments 1-Check up the cooling water system is unblocked. 2-Check up the cutter machine.Make sure there is no something to stop the cutting saw. 3-Make sure every electric component is in good conditionMould installation 1-Make sure to let the mould level.Screw down the bolt.2-Make sure the strength of every bolt is equal, the clearance between mould-flange and extruder flange is equipotent.3-Make the heater circle and thermocouple fasten on the die in turn.The heater and die must be close-knit and thermocouple must be compacted with die.Calibration table and water tank installation1)、Make the stock mould fasten on calibration table and aim at the die.2)、Make the vacuum interface and cooling water interface of die corresponding with the vacuum interface and cooling water interface of calibration table.3)、Put the cooling tank on calibration table and aim at level with shaper.starting up procedure:1、Set the material-feeder time and quiescent interval(Setting depend on the actual condition of extrusion technology)2、Set temperature of barrel,mould,screw.Heating up before starting extruder.Heat up to 170 for the barrel first step and keep warm half an hour.Heat up again to the temperature of set(170) to start the extruder.3、The material which is mixed will be loaded into hopper.starting the material-measuring equipment.4、Adjusting rotating speedfrom low to high.extruder rotating speed is 150200rpm.It must be Matched between extruder speed and feeder speed.When the products is produced stablely,Speed up the extruder to deserve large output.5、当从主机排气口观察到物料至时,即可开启真空排气装置,并同时可以调整加料器的加料量,使主机螺杆内部迅速形成“料塞”,以达到-0.08Mpa的真空度。并适时进行切换清理。6、型材的自动切割:通过形成开关设定型材的切割长度尺寸和推料长度尺寸。当型材到达设定值时,切割锯自动进行切割,翻转架自动推料到料架上。(三)、停机程序:1、首先关闭上料器;并将加料器转速调低后,关闭加料器。2、当观察到物料从模具中挤出量明显变少时,关闭机筒及模具的加热装置,关闭螺杆的冷却装置、真空排气装置,待制品不在往外挤出时将螺杆转速调零后关闭主机。3、关闭定型台水泵和水池内的潜水泵。4、清理主机和辅机及生产线周边地面,保持挤出机及生产线清洁。青岛绿康木塑有限公司木塑混料机操作规程1、 严格按照配方单来称取原材料;2、 现将木粉和助剂混合到100度后加入塑料和破碎料;3、 开机时先低速运行1-2分钟后,方可高速运行;4、 所有料加完混到105度后方可放料;5、 放净混料锅内的料后关闭放料口才可进行下一锅的上料;6、 每班清理一次混料机及周边的卫生,确保清洁,特别是混料机控制柜内的卫生,每班都要用气管吹净控制柜的粉尘。7、 每次混料前先关闭造粒机的主机和喂料,待混料机高速运行时立即开启混料机的主机和喂料。青岛绿康木塑有限公司木塑造粒机操作规程1、 设定机筒、模具、螺杆温度, 挤出机开机前需要预先分步加温,料筒先加热到170度,保温半小时,再加温到设定温度后方可开机;2、 开机前检查风机及切粒刀是否可正常运转;检查送料管道和下料筒是否通畅;3、 开机时要先打开切粒到和冷却风机,先低速(主机转速在150-200转/分钟)待粒料稳定的挤出机头后方可提速,并调整切粒刀的转速,保证粒子的长度在3-6mm;4、 在主机运行时随时清理排气孔,避免堵料,保证排气通畅,注意一定不要用金属棒或棍捅排气孔,要用塑料管或木棒捅;5、 随时观察粒料的均匀程度和机头的出料情况,若出料孔数量不足全部出料孔的三分之一时,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 鹤山招聘笔试题目及答案
- 环境污染治理效果评估与优化方案
- 2025编辑考试历年真题及答案
- 2025编导考试真题及答案江苏
- 2025年化学专业考研真题及答案
- DB52T8702025酱香型白酒酿酒用水
- 娄底中考物理试卷及答案
- 2025年网易游戏笔试真题及答案
- 望城招聘教师真题及答案
- 试用期养老护理员试题及答案
- 子宫脱垂试题及答案
- GB/T 90.1-2023紧固件验收检查
- 中国政治思想史复习资料
- 高中音乐鉴赏 第一单元 学会聆听 第一节《音乐要素及音乐语言》
- 《中国民间故事》阅读指导课
- LY/T 2501-2015野生动物及其产品的物种鉴定规范
- 20以内加减法口算题3500道直接打印
- 走好群众路线-做好群众工作(黄相怀)课件
- 北斗卫星导航系统(全套课件208P)
- 猎头行业及流程基本介绍课件
- 中国监察制度史
评论
0/150
提交评论