已阅读5页,还剩4页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
CBC LOGOLuowen and Baimiao罗文/白庙1吊篮使用救援计划 Rescue Plan for Man-basket UtilizationReviewed 审核: Issue Date 行文日期: 2012-9-21 Approved 批准: Rescue Plan 救援计划Date 日期:2012-9-21Work Permit # 工作许可编号Area区域Luowen and Biamiao Bridge罗文/白庙Description 描述:使用载人吊篮进行雨水管安装 Installation of downspout by using man-basketSpace Category 空间类别:Space Type 空间类型 (1-12):At Heights 高空Category 类别 I 进入吊篮内 Enter man-basket入救援Elevated 高空敞YESYESCategory 类别 II Congested 狭窄YESNOMeans to Summons Rescue Service 呼叫救援方式:Phone 电话Pager 寻呼机Radio 无线电Audible Signal 音响信号Intercom 对讲机Other: Phone 其他电话 Method of Rescue 救援方式:一人员自行从吊篮内通过爬梯进入到桥面 二.通过救援人员将坠落人员拽到桥面 1. Personnel get out from basket and then climb ladder to bridge deck; 2. Rescue members will pull up the falling to bridge deckExternal 外部 (retrieval 检索): Life Line 生命线 Harness 安全带 使用优优 Use Yo-yoInternal 内部: (congested 狭窄): Tunnel 隧道Hauling system required 需要的输送系统 Victim-lowering system required/lowering area 要求伤员降低的系统/降低区域: Anchorage 锚固: 吊篮内上方 Upper position of man-basket: Trial lifting required 是否需要试吊?YESNOAnchorage 锚固:吊耳 Pad-eyeAnchored-steel structure 锚固点钢结构Support Strut 支撑架Support column 支撑柱 Other 其他: Suggested Rescue Preplanned Technique 推荐救援准备: Rescue Equipment Requirements 救援设备要求: (indicate quantity needed 注明所需数量)2Yo-YoCarabiners 锁环扣Pulleys 滑轮1Life line 生命线 1铁质爬梯 Steel LadderShock absorbers 减震器Anchor straps 锚固绳索Petzl ID 自动脱落下降器Rigging Kits 索具箱Rescue Ropes Needed 救援所需绳索: (indicate quantity needed 注明所需数量)Main line(s) 主线 Hauling systems 输送系统Steel Sling钢丝绳Safety line(s) 安全绳索Line-transfer system(s) 绳索传输系统Medical and Packaging Equipment Needed 所需医疗和包扎设备: (indicate quantity needed 注明所需数量)Spinal immobilization device 脊椎固定设备C-collar C-项圈Stretcher device 担架设备CDB Doctor and Ambulance; Contractor Medical Kit & Nurse on standby at all time at site when work in progress. 医疗箱以及桥机工作期间全职待机护士RPP Requirements 呼吸保护系统要求 mask 半截口罩Full Mask 全幅口罩SABA 空气呼吸机SCBA 自给空气呼吸机Cartridge Type 滤芯型号: Additional PPE 其他PPE: Full Body Harness 全身式安全带Designation of Rescue Personnel 救援人员的组成: (Last name, first initial 姓,首字母l)Rescue team leader救援负责人: Ye bo (construction staff)波 Emergency Rescue Team members 救援小组成员.Li xianhe李先和/ Zhao dingjun 赵定军 (rescuers on bridge)Dai baozhong代宝中/ Mao peicheng 毛培成(rescuers on bridge) Xiong Li 熊莉 (nurse)Wang neng xin 王能信(nurse) 雷芳Leifang(nurse)Remark:人员变动请在下面注明Staging Area 集结待命区域: Bridge and Bridge Crash barriersOverall View 概况: See page 3 参见第3页Rescue Commander救援总指挥 王建伟 Wang JianweiPhone 电话:ate 日期: 2012-9-17Report completed by 报告编纂人: Xiang nan 向南Rescue from heights overall view.Picture #1 Installation Area of Downspout图1.排水管安装区域Picture #2安装使用的载人吊篮图2:Man-basket used for installation 进入吊篮工人员必须使用优优挂钩 Worker in man-basket must tie of Yo-yo.While rescuing, the rescue member should ensure 100% tie off on life line.在救援时,救援人员必须确保在生命线上100%挂钩。Picture #4 吊篮内安全带系挂 Tie off body harness in man-basketPicture #3 优优正确挂钩方式 Use Yo-yo properly 安全带双钩作为辅助可以挂在吊篮扶手上 Double-hook of harness can be connected to baskets rail for assistance. 优优挂钩必须与安全带D型环挂牢 Yo-yo must be connected to D-ring of harness firmly. Picture #5 使用吊篮时安全门必须关闭 Safe-door of basket must be closed. Picture #6 16T吊车正在作业中,如突然发生系统故障 In case of 16t cranes system failure during operation 此时吊车严禁进一步操作,等待救援人员 In such circumstance, crane is prohibited to operate and it shall wait for rescue member. 非紧急事件状态下此门严禁打开 Unless emergency, this door is prohibited to opening.Picture #8 逃生过程中可能发生坠落 Fall may happen during rescuePicture #7 救援人员快速架设爬梯 Rescue members set up ladder immediately 逃生人员安全带必须挂在另外设置的钢丝绳,方便2名救援人员把坠落的人员拽起 Escaping personnels harness shall be tied off to other steel sling for recovery of fallen casualty by 2 rescue members吊篮内人员通过爬梯快速撤离到桥面Personnel in man-basket shall evacuate from deck by using ladder. Picture #10 紧急逃生使用的钢丝绳Steel sling used for rescuePicture #9 逃生使用的钢丝绳与桥面上生命线联结 Steel sling for rescue shall be connected to life-line. 钢丝绳采用18mm 卸扣使用四件套安全销卸扣 Use 18mm steel sling and shackel with safe-pin combined by 4 parts此钢丝绳必须确保随时满足逃生要求Such steel sling must satisfy the rescue requirement at all time. Picture #11 优优的挂点 Hanging point of Yo-yo优优必须经吊装专家同意后使用 Yo-yo could be used only after approval of CDBs lifting expert. Procedure 援程序- All rescue members mentioned on the plan including the nurse will be on standby for the work of downspout installation which is done by workers in man-basket. - 对于排水管安装工作时必须在吊篮内完成工作,本计划中提及的所有救援小组成员包括护士需随时待命。- In case of failure of crane, it shall make alert to mobilize rescue team members.- 当吊车发生故障时应在第一时间内发出警报通知救援小组到场。- CBC & CDB Management and HES shall be informed immediately.- 立即通知CBC和CDB的管理和HES人员。- The rescue commander will take control and give clear instructions.- 救援指挥控制现场并且发出清晰指令- Rescue members will do quick briefing to allocate members and receive clear instructions.- 救援小组成员快速了解情况部署成员以及接收清晰指令。- 2 Rescue members go onto bridge deck to deploy the recovery ladder and life line2名小组成员将立即置放好爬梯,并协助从吊篮内撤离的人员安全地到达桥面。During climbing the ladder, the escaping personnels harness shall be tied off to the life line, this life line will be used to pull the casualty back up to the bridge deck in the event of a fall逃生人员上爬梯时安全带必须挂在另设置的钢丝绳,如发生人员坠落便于救援人员拽起- During rescue, it is prohibited to stretching out his body out of bump wall.- 救援过程中救援人员严禁将身体部位探出/伸出防撞墙边缘以外。- During the whole process, the harnesses for rescue members shall be 100% tied off at all times. In case of injury, pull the injured to safe location for nursing and first-aid. - 在救援过程中,救援人员的安全带必须时刻保证100%系挂。如果有人受伤将受伤人员拉到安全位置后和护士一起开展救援工作- To ensure implementation of rescue, rescue process shall be carried out in a controlled manner. And meanwhile, all rescue members shall aware of their respective responsibilities. - 为保证救援工作顺利开展,整个救援必须有条不紊的进行。另外各个人员必须明白自己的相应职责。- In case of injury, the nurse shall perform examination and treatment; (1. If it is flesh wound, then conduct bandage treatment; 2. If it is seriously injured, transfer to local hospital immediately).- 如果有人受到伤害,护士对受伤人员进行观察治疗;(1、观察发现是轻伤,进行包扎处理;2、观察发现是重伤,立即送往当地医院治疗)。- Nurse / CDB Doctor on standby treat the patient and make further recommendations to CDB Construction Manager and CBC Project Manager.- 待命的护士以及CDB的医生治疗伤员进行治疗,并且将给CDB现场施工经理和CBC项目经理更进一步的建议。- Yo-yo must be connected to D-ring of body harness firmly at all times. It is not allowed to unclip the Yo-yo during rescue. Only after worker reaches bridge deck safely, Yo-yo shall be un-hooked. - 任何时候优优必须与安全带D型环始终挂牢,逃生时严禁松开优优挂钩,只有人员安全到达桥面才可以不在使用优优挂钩NOTEAll rescue members shall be trained in the rescue plan. The rescue plan will be part of the JSA and will be given daily before work starts. Rescue Drills will be carried out if rescue personnel rotate out or are replaced, also if any of the equipment designated for the rescue changes, or the Scope of work changes.Harnesses / lanyards/ Yo-Yo/ Life Lines/ Ladders/ Shackle and Slings will be checked
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 中国稀土秋招试题及答案
- 阁楼改建出租合同范本
- 防止恶性竞争合同范本
- 项目开发建设合同范本
- 詹姆斯团队保密协议书
- 服装货物购销合同范本
- 融资专员试题带答案
- 教师取暖安全协议书
- 酒店工程部学生顶岗试题带答案
- 酒店行政助理试题带答案
- 丙型肝炎防治指南
- 2025年基层党支部书记述职报告
- 中国稀土镁合金治炼项目投资可行性研究报告
- GB/T 30340-2025机动车驾驶员培训机构业务条件
- 传统文化经典教案范例分享
- 2025艺术品买卖合同范本
- 新保密教育线上培训考试试题及答案
- 2025年幼师考编真题及答案
- 科技企业员工绩效考核管理办法
- 2025年潜水泵行业分析报告及未来发展趋势预测
- 2025低空经济无人机网络安全事件案例分析报告
评论
0/150
提交评论