




已阅读5页,还剩17页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
30kWh-Nissan Leaf battery pack manufacturing detailsAlong with details on the 2016 Nissan Leaf, Nissan published a video showing us details of the battery pack factory in Smyrna Tennessee. This video happens to show construction of the new 30 kiloWatt-hour battery pack, which we know simply because of the shape of each module.And it happens to show us some interesting details about the Leaf battery pack innards.The video is at the bottom.Ive made a few screen captures to walk through what is shown.The Nissan Leaf pack is not a regular rectangular shape, and it never has been.Some modules are laid horizontally, probably so theyll sit under the seating area.Another group of modules are laid vertically, probably to fit behind the rear seats.The new modules for the 30 kWh pack is packaged as 8 cells, in a 2P 4S arrangement.(2 in parallel, 4 in series)Battery cells traversing the machinery. Each cell is a pouch, with two tabs for the positive and negative connections.It looks like the machinery is checking battery cell voltage which would be a necessary step to weed out bad cells.Battery cells are taken along a conveyor, with visual checks performedVisual check being performed.Battery module on the assembly line. Where the previous modules (for the 24 kWh packs) had single-height modules, this is a double-height module.For comparison, this is the old Leaf battery module which goes into the 24 kWh packs.Battery modules undergoing visual inspectionAnother view of the module inspection process. Its clear from the video the modules are held aloft by suction force, so the workers can inspect on all sides and the bottom.Closeup of battery module during inspection process.Close-up look at the module during the inspection process.Another angle to look closely at the battery modules. Youll also notice a magic marker in his hand, that in the video is used to make marks that probably indicate the visual inspection was performed.A rack of modules getting ready to go into a completed battery pack.Busbar being readied to attach to the group of modules.Bolting the busbar to the modules.Close-up of bolting down the busbar to the modules.Assembling the battery pack. Lowering the group of modules into the pack, and preparing to wire everything together.Bolting down the battery module assembly into the pack.Close-up of the battery pack assembly.Finished battery pack on a trolley going to w
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年投资理财师职业资格考试试题及答案
- 2025年全国硕士研究生考试题及答案
- 2025年绿色建筑设计专业考研试卷及答案
- 2025年科技创新与管理实践能力考试试题及答案
- 2025年计算机网络技术职业资格考试卷及答案
- 北师大版(2024)七年级下册英语期末复习:各单元主题作文范文
- 2025年电子商务专才职业资格考试试题及答案
- 员工生日会流程策划与实施
- 痔病人的外科护理
- 车间内龙门吊车安全培训
- 网络游戏代理合同通用版范文(2篇)
- SH/T 1485.4-1995工业用二乙烯苯中特丁基邻苯二酚含量的测定分光光度法
- GB/T 38807-2020超级奥氏体不锈钢通用技术条件
- GB/T 27773-2011病媒生物密度控制水平蜚蠊
- 质量风险识别项清单及防控措施
- 2022年石家庄交通投资发展集团有限责任公司招聘笔试试题及答案解析
- 中国华电集团公司信访事项处理程序
- 特种设备制造内审及管理评审资料汇编经典版
- EDI超纯水系统操作说明书
- 金属监督监理实施细则
- 2022年镇海中学提前招生模拟卷科学试卷
评论
0/150
提交评论