预压机校准操作.doc_第1页
预压机校准操作.doc_第2页
预压机校准操作.doc_第3页
预压机校准操作.doc_第4页
预压机校准操作.doc_第5页
免费预览已结束,剩余1页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

CBV-Manuell CBV-手册1.0 Calibration Belttensioning Precompressorbelt on Panel =L+P02在L+P02上对预压机皮带的皮带松紧进行校对的操作步骤1.1 go in “manual mode” (2)首先开启“手动模式”按钮(2)1.2 go in “emergency operation” (5)开启“紧急情况操作”按钮(5)1.3 push “fault acknowledge” (1)按下“故障认可”按钮(1)1.4 go on “calibration” (4) and hold it开启“校对”按钮(4)并一直保持开启状态1.5 turn the button (3) to the right side and hold it also将按钮(3)转向右边,并一直保持此状态1.6 the precompressorbelt will be now release the tensioning现在预压机的皮带开始慢慢松弛1.7 when is finish will be come the alarm horn with a interval for 5 seconds在此操作结束时,将有间隔为五秒的警报响起1.8 the calibration is now finish 此时校对操作完成2.0 Calibration CBV-Belt TOP on Panel =L+P02 在L+P02上对顶部CBV-皮带进行校对的操作步骤2.1 go in “manual mode” (2) 首先开启“手动模式”按钮(2)2.2 go in “emergency operation” (5)开启“紧急情况操作”按钮(5)2.3 push “fault acknowledge” (1)按下“故障认可”按钮(1)2.4 go on “calibration” (4) and hold it开启“校对”按钮(4)并一直保持开启状态2.5 turn the button (3) to the right side and hold it also将按钮(3)转向右边,并一直保持此状态2.6 the CBV-Belt top will be now release the tensioning现在顶部CBV皮带开始慢慢松弛2.7 when is finish will be come the alarm horn with a interval for 5 seconds在此操作结束时,将有间隔为五秒的警报响起2.8 the calibration is now finish此时校对操作完成3.0 Calibration CBV-Belt BOTTOM on Panel =L+P02 在L+P02上对底部CBV皮带进行校对的操作步骤3.1 go in “manual mode” (2)首先开启“手动模式”按钮(2)3.2 go in “emergency operation” (5)开启“紧急情况操作”按钮(5)3.3 push “fault acknowledge” (1) 按下“故障认可”按钮(1)3.4 go on “calibration” (4) and hold it开启“校对”按钮(4)并一直保持开启状态3.5 turn the button (3) to the right side and hold it also将按钮(3)转向右边,并一直保持此状态3.6 the CBV-Belt bottom will be now release the tensioning现在底部CBV皮带开始慢慢松弛3.7 when is finish will be come the alarm horn with a interval for 5 seconds在此操作结束时,将有间隔为五秒的警报响起3.8 the calibration is now finish此时校对操作完成4.0 Calibration Thicknesscontrol CBV on Panel =L+P02 在L+P02上对CBV厚度控制进行校对的操作步骤4.1 go in “manual mode” (2) 首先开启“手动模式”按钮(2)4.2 go in “emergency operation” (5)开启“紧急情况操作”按钮(5)4.3 push “fault acknowledge” (1)按下“故障认可”按钮(1)4.4 go on “calibration” (4) and hold it开启“校对”按钮(4)并一直保持开启状态4.5 push the button “Press lower” (3) and hold it also按下按钮(3)“降低压机”,并一直保持此状态4.6 the CBV is now coming down现在CBV开始慢慢下降4.7 when is finish will be come the alarm horn with a interval for 5 seconds在此操作结束时,将有间隔为五秒的警报响起4.8 the calibration is now finish此时校对操作完成5.0 Calibration Thicknesscontrol Precompressor on Panel =L+P02在L+P02上对预压机厚度控制进行校对的操作步骤5.1 go in “manual mode” (2)首先开启“手动模式”按钮(2)5.2 go in “emergency operation” (6)开启“紧急情况操作”按钮(6)5.3 push “fault acknowledge” (1)按下“故障认可”按钮(1)5.4 push “press lower” (4) and bring the CBV completely down 按下“降低压机”按钮(4)并使CBV安全下降5.5 go on “calibration” (5) and hold it开启“校对”按钮(5)并一直保持开启状态5.6 push the button “Precompressor lower” (3) and hold it also按下按钮(3)“降低预压机”,并一直保持此状态5.7 the Precompressor is now coming down现在预压机开始慢慢下降5.8 when is finish will be come the alarm horn with a interval for 5 seconds在此操作结束时,将有间隔为五秒的警报响起5.9 the calibration is now finish 此时校对操作完成6.0 Calibration height adjustment cover left and right左右两边高度调节面的校对操作步骤6.1 go in “manual mode” (2) 开启“手动模式”(2)6.2 push button (4) and (5) have to be in the middle position 将按钮(4)和(5)调至中间部位6.3 push now the button “height adjustment cover lower” (3) and hold it 按下按钮(3),“降低高度调节面”,并保持按钮处于开启状态6.4 the left and the right cover is now coming down 左右两

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论