全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1. dielectric testl functiona. power-frequency voltage test Verify the switch withstand the external insulation test. External insulation: distances in atmosphere and surfaces in contact in with open air of solid insulation of the equipment which are subject to dielectric stresses and to the effects of atmospheric and other external condition such as pollution, humidity, vermin, etc.b. lightning impulse voltage test Verify the switch withstand lightning test. Lightning: the tests shall be performed with voltages of both polarities using the standard lightning impulse 1.2/50us according to IEC 60060-1 in the laboratory.c. artifical pollution test for outdoor insulators When the creepage distances do not comply with the requirement of IEC60815, this test should be performed according to IEC60507.d. partial discharge tests when the relevant product require this test, and then it will performed according to IEC60270. the product such as bushing etc.l relationship Routine test Mandatory do the dielectric test after the following test:a. short-circuit current making/breaking testb. short-time withstand current and peak withstand current testc. mechanical/electrical endurance test2. measurement of the resistance of circuitsl Function Verify the main circuit resistance, then confirm the main circuit situation.l Relationship Measure of the resistance of main circuit at the front/back of the temperature-rise test, and compare the two values, gain the result. Note: increase of the main circuit resistance cant alone be considered as reliable evidence of bad contact or connections.3. temperature-rise testl test condition on a new switchl function verify the contact and the connection quality, or the equipment work will not exceed the specified values avoid damage.l Relationship Measure of the resistance of main circuit at the front/back of the temperature-rise test, and compare the two values, gain the result.4. short-time withstand current and peak withstand current testl test conditiona. new operation device(dont operate with load)b. contacts clean and in closed positionc. be preceded by measurement of the main resistanced. small voltage, short-circuit current, the fluent time always is 4sl functiona. this test to prove their ability to carry the rated peak withstand current and the rated short-time withstand currentb. verify the contacts spring can against the electrical force.(continually)c. Verify the contacts and contacts spring section construction force, can against the shake by this test. (continually)d. Verify the contacts conduction and material ability.l relationship mandatory test after this test, as following:a. no-load operation, performed immediately after this test, the contacts shall open at first attempt.b. Main resistance test compared, if less than 20% it is ok, if more than 20% it will do the temperature-rise test.After this test, the switch can perform the following function normally:a. mechanical character test in the normal areab. carry normal current continuously without exceed. The temperature-rise test is ok.c. Dielectric testd. Can performance the making/breaking current.Note: this test is no temperature-rise limited specified when the max temperature should not be damage the adjacent parts.5. short-circuit current making and breaking testl test conditiona. rated voltage, short currentb. the time of fluent short current is very short, low than 100msl functionc. circuit-breaker shall be capable of making and breaking all short-circuit currents, symmetrical or asymmetrical, up to and including the rated short-circuit breaking current.d. Verify the closing/opening operation and the contact spring power can against the test. (impulse)e. Verify the rigidity of structure. (impulse)f. Verify the availability of arc-extinguish medium of the VI, and the contacts material.Note: the power/force check use the short-circuit current making/breaking test is more high level than the short-time/peak withstand short-circuit current test. But it is still have the different operation continually and impulse.The purpose of the type test:When the switch encounter short-circuit, the switch will proceed the following process to protect the system.making and breakingWhen this switch will not cut off the malfunction, the upper level protect equipment will start. For example the upper level V
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025中铁一局集团新运工程有限公司招聘笔试历年典型考点题库附带答案详解2套试卷
- 财经法规面试题及答案
- 2025中建一局一公司湖北公司招聘市场经理笔试历年难易错考点试卷带答案解析2套试卷
- 2025中国葛洲坝集团第一工程有限公司招聘7人笔试历年常考点试题专练附带答案详解2套试卷
- 2025中国电科38所校园招聘考试历年参考题库3卷合1带答案解析
- 补课面试题目及答案
- 2025中国中车西安车辆有限公司招聘(151人)笔试历年难易错考点试卷带答案解析2套试卷
- 买卖家具合同
- 标准经理面试题及答案
- 新疆中考各科试卷及答案
- 低空数字航空摄影测量内业规范2021
- 一年级上册10以内看图列式练习题大全(各类齐全共7套题)
- 食堂员工心理健康培训
- 码头船舶调度管理制度
- T-TBMA 13-2024 建筑保温与围护结构一体化复合保温外填充墙应用技术规程
- 精神康复项目管理制度
- 砂石拉运协议书
- 小学英语(新概念英语)一般现在时、一般将来时、现在进行时综合练习题1
- 【《基于近五年数据的金种子酒营运资金管理研究》13000字】
- 职业技术学院智慧旅游技术应用专业人才培养方案
- 遴选会计笔试题库及答案
评论
0/150
提交评论