全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Birds NestAbstract: The main venue for the Beijing Olympics, the National Stadium, widely known as the Birds Nest because of its unique design, has become a nationwide sensation. The removal of the elements helped to bring the project under the reduced construction budget of $290million, from an original $500million. With the removal of the retractable roof, the building was lightened, which helped it stand up toseismic activity; however, the upper section of the roof was altered to protect fans from weather. Due to the stadiums outward appearance, it was nicknamed The Birds Nest. The phrase was first used by Herzog & de Meuron, though the pair still believes there should be many ways of perceiving a building. The use is a compliment Li explained, In China, a birds nest is very expensive, something you eat on special occasions.Introduction: The National Stadium is situated in the Beijing Olympic Green. During the Beijing 2008 Olympic Games, the opening ceremony, closing ceremony, track and field meets, and mens football final will be held here. It is the worlds largest steel structure and the most complex stadium ever constructed. Its design had to be inspiring and be able to withstand an earthquake. So light weight was combined with strength in 110 000 tons of a new grade of steel, the purest ever developed in China, including 36km of steel struts. It has been a landmark and a longstanding symbol of the Olympics. It is one of the key engineering marvels in the world today.The Birds Nest was the main venue of the 2008 Beijing Olympic Games and it has a seating capacity of over 91,000. With a simple and classical space effects, the National Stadium is beautifully designed; and all the structural parts support with each other, forming a network framework. It looks like a birds nest woven with branches. After the Beijing 2008 Olympic Games, the stadium will become a sports and entertainment facility for the residents of Beijing. And it will become another important tourist attraction of Beijing.By the 2001 Pritzker Prize winner Herzog, and the Chinese architect Li Xinggang de Meuron collaborated giant stadium design, forms as life nest, it is more like a cradle, is entrusted with the mankinds hope for the future. The designers of the National Stadium did not do any extra processing, just give the structure is exposed outside, so the natural formation of the appearance of a building.Design and construction: Located in the Olympic Green, the stadium cost US$423 million. The design was awarded to a submission from the Swiss architecture firm Herzog & de Meuron in April 2003 after a bidding process that included 13 final submissions. The design, which originated from the study of Chinese ceramics, implemented steel beams in order to hide supports for the retractable roof; giving the stadium the appearance of a Birds nest. Leading Chinese artist Ai Weiwei was the artistic consultant on the project. The retractable roof was later removed from the design after inspiring the stadiums most recognizable aspect. Ground was broken in 24 December 2003 and the stadium officially opened in 28 June 2008. A shopping mall and a hotel are planned to be constructed to increase use of the stadium, which has had trouble attracting events, football and otherwise after the Olympics.The entire structure component of the stadium composes the mutual support to form a grid structure. It looks like a birds nest and the gray steel mesh is covered by transparent material. It contains a bowl-shaped stadium which is red. Here, the hollow out style, the ceramic lines, the red refulgence and warm, and the most advanced modern steel structure design are perfectly blended together.The whole building is related through the giant reticular structure, without one column in the interior. The stand is shaped like bowl which give the stadium unbelievable dramaticism and incomparable appeal. The continuous loop will also make the audience get the best view and promote their emotion. It can also encourag e players to be faster, higher and stronger. Here, people, really have been given the center position. The crust of the stadium can be made by the diaphragm, make to completely waterproof. The sun can penetrate through the transparent roof to meet the growth of the indoor turf. During a game, the stands can change through various ways and can satisfy the different requirements of different audiences. During the Olympic Games, 20000 temporary seats are on the top of the stadium and can ensure that everyone can clearly see the whole game. The entrance, the exit and the crowd flow through the regional division and reasonable streamline design had been settled perfectly.The eastern and western stands of Beijing National Stadium are higher than northern and southern stands, in order to improve sightlines. A 24-hour per day rainwater collector is located near the stadium; after water is purified, it is used throughout and around the stadium. Pipes placed under the playing surface gather heat in the winter to warm the stadium and coldness in the summer to cool the stadium. The stadiums design originally called for a capacity of 100,000 people; however 9,000 were removed during a simplification of the design. The new total of 91,000 would be shaved further when 11,000 temporary seats were removed after the 2008 Olympics; bringing the stadiums capacity to 80,000.The farthest seat is 460 feet (140 meters) from center field. Temperature and airflow of every surface were optimized to increase ventilation.The stadium is like a huge container, whether the last to see or Lex, will give the impression that distinctive, never erase the image, it is fully in line with the National Stadium in the functional and technical requirements, but also from a general Stadium building long-span structures and the digital screen as the main design technique. The spatial effect of the stadium only has the unprecedented originality, but simple, elegant. From here, people can visit, including the stands of the stairs leading to the entire region, including moving lines. Sports hall, is an indoor urban space, with restaurants and shops, its role is just as Commercial Street Gallery, or square, drawing people yearn afternoon a memorable one.Summary:The Birds Nest, together with the nearby Water Cube, represents the traditional Chinese concept of round heaven and square earth, as well as the Qian-kun and Yin-yang ideas. The Birds Nest is a Beijings landmark building which represents the most advanced steel structure building system and it support the deve
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 会计基础考试题库及答案(带答案解析)
- 安全双控培训试题及答案
- 建筑施工质量监理师技术水平考核试题及答案解析
- 当代科学技术试题及答案
- 德州学院战略管理期末考试试卷(3卷)
- 执业医师资格口腔执业医师第六次综合测试卷含答案
- 护士应知应会考试试题及答案
- 招聘病案统计试题及答案
- 数字化零售模式创新与消费趋势考试试题及答案
- 2025 年大学劳动与社会保障(社会保障学)试题及答案
- 代孕协议样本
- 教学课件:《航海学》
- 课件:《科学社会主义概论(第二版)》第七章
- 中医是中国的国粹了解一下中医发展简史
- 新版标准化机电专业管理体系解读课件
- 【MOOC】波谱分析-西北大学 中国大学慕课MOOC答案
- 医疗职业暴露
- 220kV耐张线夹检测报告
- 期中测试卷(试题)-2024-2025学年人教版六年级数学上册
- 2024春-家庭与社区教育(十校联盟)学习通超星期末考试答案章节答案2024年
- 第16课《诫子书》公开课一等奖创新教学设计 统编版语文七年级上册-2
评论
0/150
提交评论