MRP_MRP排除某些Storage Location Stock.docx_第1页
MRP_MRP排除某些Storage Location Stock.docx_第2页
MRP_MRP排除某些Storage Location Stock.docx_第3页
MRP_MRP排除某些Storage Location Stock.docx_第4页
MRP_MRP排除某些Storage Location Stock.docx_第5页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Notes-0000386491 OMIR-Define storage location MRP SymptomIn Customizing Transaction OMIR (path: Requirements planning - Planning- Define Storage Location MRP per Plant, you can set a default value forhow a storage location is planned.Requirements planning seems to ignore the settings you make here.Cause and prerequisitesThe settings you make in Customizing have no effect on how a storagelocation is actually planned. From the documentation you can see thatthisis only a default value.This note is meant as an explanation since many customers expect an effectof this Customizing setting on the operating activity.SolutionOnly the MRP indicator (MARD-DISKZ) on the MRP view in the material masterof the respective material for this storage location defines the planningof a storage location.If you assume an error in the planning of a storage location, you shouldcheck this indicator.The setting in Transaction OMIR is only meant as a default value. If youcreate a material master record for this storage location, the indicatorset in Transaction OMIR is transferred automatically as a default value tothe field for the storage location MRP. However, you can always overwritethis manually.If you change the Customizing indicator, the indicator is not updatedin allmaterial master records. Consequently, you cannot achieve a direct changeof the MRP by changing the Customizing indicator.OSS ReplyAs explained in note 386491, the setting in Transaction OMIR is onlymeant as a default value. Here, default value means that if youcreate a material for this storage location, the indicator that you setin OMIR will be proposed to the material master as a default value tothe field for the storage location MRP.The settings you make in Customizing have no effect on how a storagelocation is actually planned. Only the settings for the storagelocations in the respective material masters are important formaterials planning.You can easily prove this by creating a new material with storagelocation MRP. You would see the value in the customizing is copiedto the field storage location MRP in the material master.IMG中將Storage Location 的MRP Indicator設定為1開一張跨公司採購單入到4100這個Storage LocationMRP還是將該筆跨公司採購單當做是供給,有需求時,在跑MRP後所開的計劃單就會少要排除此一問題,除了IMG以外,需維護MRP 4 View Storage Location

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论