




已阅读5页,还剩7页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
16 CLASS A GENERAL ITEMS一般项目 Includes General obligations site services and facilities Temporary Works testing of materials and work Provisional Sums and Prime Cost Items Items to cover elements of the cost of the work which are not to be considered as proportional to the quantities of the Permanent Works 包括 一般义务 现场的服务和设施 临时工程 材料和测试工作 临时金额及总理费用项目 项目涵盖要素成本的工作是不被视为的数量成正比的永久性工程 FIRST DIVISION 甲级甲级 SECOND DIVISION 乙级乙级 THIRD DIVISION 丙级丙级 1 Contractual requirements合同要求 1 Performance bond 履约保证金 2 Insurance of the Works 工程险 3 Third party insurance 第三者责任险 2 Specified requirements 规定的要求 1 Accommodation for the Engineer s staff 工程师工作人员的住宿 1Offices 办公室 2Laboratories 实验室 3Cabins 小木屋 2 Services for the Engineer s staff 为工程师工作人员的服务 1Transport vehicles 运输车辆 2Telephones 电话 3 Equipment for use by the Engineer s staff 为工程师工作人员的设备 1Office equipment 办公室设备 2Laboratory equipment 实验室设备 3Surveying equipment 测量设备 4 Attendance upon the Engineer s staff 工程师助理 1Drivers 司机 2Chainmen 测链员 3Laboratory assistants 实验室助理 5Testing of materials 材料试验 6Testing of the Works 工程试验 7 Temporary Works 临时工程 1Traffic diversions交通改道 2Traffic regulation交通管制 3Access roads通道 4Bridges桥 5Cofferdams围堰 6Pumping泵站 7De watering排水 8Compressed air for tunnelling 隧道压缩空 气 3 Method Related Charges 方法相关费用1 Accommodation and buildings住宿和建筑物 1Offices办公室 2Laboratories 实验室 3Cabins 小木屋 棚建 4Stores 仓库 5Canteens and messrooms 小卖部和食堂 2 Services服务 1Electricity电 2Water水 3Security安全 4Hoardings临时围墙 5Site transport现场运输 6Personnel transport人员运输 7Welfare 福利 3Plant1Cranes起重机 2Transport交通 3Earthmoving土方 4Compaction压实 5Concrete mixing混凝土搅拌 6Concrete transport混凝土运输 7Pile driving打桩 8Pile boring桩钻孔 4Plant1Pipelaying铺设水管之工程 2Paving铺地工程 3Tunnelling开挖隧道 4Crushing and screening粉碎和过筛联合设 备 5Boring and drilling 镗钻 17 CLASS A MEASUREMENT RULES 测量规则 DEFINITION RULES 定义规则 COVERAGE RULES 覆盖规则 ADDITIONAL DESCRIPTION RULES 附加说明规则 Ml The unit of measurement for general items shall be the sum except where another unit of measurement is used in accordance with rule M2 M1 除非根据M2的规定使用其他测量 单位 一般项目的测量单位应为总额 C1 Items for insurance classed as contractual requirements shall be deemed to include only provision of insurance in accordance with clauses 21 and 23 unless otherwise stated 除 非另有说明 根据第21 和 23条合同要 求中划分的保险项目应被视为仅包括保 险的提供 M2 A quantity sbaJf be given against all items for specified requirements of which the value is to be ascertained and determined by admeasurement in accordance with clause 56 1 A unit of measurement shall be stated for each such item 规定要求中需要根据第56 1 条通过测量来确定价值的所有项目应给 出数量 每一项都应说明测量单位 M3 Items shall be given in this class for all testing for which terns are not given separately as set out in other classes 在其他类别中没有单独列出项 目的所有试验应在这一类别中给出项目 Dl All work other than the Permanent Works which is expressly stated in the Contract to be carried out by the Contractor and of which the nature and extent is expressly stated in the Contract shall be classed as specified requirements 除了合同中有明确说明由 承包商进行的及性质 范围在合同中有 明确说明的永久工程外的所有工程应按 规定的要求分类 A1 Item descriptions for work classed as specified requirements which is to be carried out after the issue of the Certificate of Substantial Completion shall so state 规定要求中在实际完工证 书签发后要进行的工程的项目说明应这 样说明 A2 Item descriptions for work classed as specified requirements shall distinguish between the establishment and removal of services or facilities and their continuing operation or maintenance 规定要求中的项目说明应 将设施的架设和拆除及继续运行或维护 区分开 A3 Item descriptions for testing of materials and testing of the Worksshall include particulars of samples and of methods of testing 工程和材料试验的 项目说明应包括样本和试验方法的详细 情况 M4 Items for Method Related Charges if any shall be inserted uy the tenderer in accordance vith section 7 与方法相关费用的项目 如有 应有投标人根据第7章插入 A4 Item descriptions for Method Related Charges shall distinguish between Fixed and Time Related Charges 与方法相关费用的项目说 明应将固定费用和与时间相关费用 区分开 NOTE Method Related Charges may be inserted by the tenderer in accordance with paragraph 7 2 for insurances additional to those classed as contractual equirernents 18 CLASS A FIRST DIVISIONSECOND DIVISIONTHIRD DIVISION 3 Method Related Charges continued 5Temporary Works1Traffic diversions交通改道 2Traffic regulation交通管制 3Access roads通道 4Bridges桥 5Cofferdams围堰 6Pumping泵站 7De watering排水 8Compressed air for tunnelling 隧道压缩 空气 6Temporary Works1Access scaffolding 2Support scaffolding and propping 3Piling 4Formwork 5Shafts and pits 6Hardstandings 7 Supervision and labour1Supervision 2Administration 3Labourteams 4 Provisional Sums1 Daywork1Labour 2Percentage adjustment to Provisional Sum for Daywork labour 3Materials 4Percentage adjustment to Provisional Sum for Daywork materials 5Plant 6Percentage adjustment to Provisional Sum for Daywork plant 7Supplementary charges 8Percentage adjustment to Provisional Sun for Daywork supplementary charges 2 Other Provisional Sums 5Nominated Sub contracts which include work on the Site 6Nominated Sub contracts which do not include work on the Site 1Prime Cost Item 2Labours 3Special labours 4Other charges and profit 19 CLASS A sis rute at head of class on page 17 MEASUREMENT RULESDEFINITION RULESCOVERAGE RULESADDITIONAL DESCRIPTION RULES M4 Items for Method Related srges if any shall be inserted the tenderer in accordance th section 7 与方法相关费用的项目 如有 应有投标人根据第7章插入 A4 item descriptions for Method Related Charges shall distinguish between Fixed and Time Related Charges 与方法相关费用的项目说 明应将固定费用和与时间相关费用区 分开 M5 Items for percentage j jjustment to Provisional Sums 2 Dayworkshall be given only ere a Daywork Schedule in accordance with alternative form z of paragraph 5 6 is given in the 5 1 of Quantities Adjustments all be inserted against such sms to correspond with the adjustments if any inserted by e tenderer in the Daywork Schedule 日 工暂列款百分比调整项目应只能用根据 工程量清单第5 6段的日工计划表备用 格式 投标人如果对日工计划表作出调 M6 Each Prime Cost Item shall za followed by an item for labours and an item for other charges and rofit in accordance with Bragraph 5 15 Where labours herthan or in addition to those stated in sub paragraph a of C3ragraph 5 15 are to be provided ie item for labours shall be lesignated as for special labours 每一最初成本项目 后应根据第5 15段规定添加人工 其它 费用项目及利润 如果需要除了5 15段 a 规定以外的人工 那么该项应设 计专用人工 A5 Item descriptions for Prime Cost Items shall identify the work included 最初成本项目说明应确定所包括的工程 A6 The labours shall be stated in item descriptions for special labours 专用人 工应在项目描述中说明 CLASS B GROUND INVESTIGATION Includes Trial pits and trenches boreholes samples site and laboratory tests instrumental observations and professional services in connection with ground investigation Excludes Excavation not carried out for the purpose of ground investigation included in class E Boring for piling included in classes P and Q FIRST DIVISIONSECOND DIVISIONTHIRD DIVISION 1 Trial pits and trenches1Number in material otherthan rock nr 2Number in material which includes rock nr 1Maximum depth not exceeding 1 m 21 2 m 32 3 m 43 5 m 55 10m 610 15m 715 20 m 8stated exceeding 20 m 3Depth in material otherthan rock m 4Depth in rock m 5Depth supported m 6Depth backfilled material stated m 7 Removal of obstructions h 8 Pumping at a stated minimum extraction rate h 2 Light cable percussion boreholes1 Number nr 3 Depth m1In holes of maximum depth not exceeding 5 m 25 10 m 310 20m 420 30 m 530 40 m 6stated exceeding 40 m 6 Depth backfilled material stated m 7 Chiselling to prove rock or to penetrate obstructions h 3 Rotary drilled boreholes1 Number nr 3Depth without core recovery m 4Depth with core recovery m 1In holes of maximum depth not exceeding 5 m 25 10m 310 20 m 420 30 m 530 40 m 6stated exceeding 40 m 5Depth cased m 6Depth backfilled material stated m 7Core boxes length of core stated nr 21 CLASS B MEASUREMENT RULESDEFINITION RULESCOVERAGE RULESADDITIONAL DESCRIPTION RULES C1 Items for ground investigation shall be deemed to include preparation and submission of records and results 地面勘察项将被视为包括 准备及记录和结果的提交 C2 Itemsforground investigation shall be deemed to include disposal of excavated material and removal of dead services 地面勘测项将被视为包 括开挖材料的处理及dead设施的移除 A1 Item descriptions for the number and depth of trial pits and trenches shall state the minimum plan area atthe bottom of the pit ortrench or where the work is undertaken to locate services the maximum length of the trench 探坑 和沟渠数量和深度的项目说明应指出坑 或沟渠底部的最小计划区域 面积或如果 工程承担查找设施 须指出沟渠的最大 深度 A2 Item descriptions for the number and depth of trial pits an d trenches B 1 1 4 shall identify separately thosewhich are expressly required to be excavated by hand 探坑和沟渠 B 1 1 4 数量和深度的项目说明应分别标识 哪些明确需要人工开挖 A3 Item descriptions for pump ngshall state any special de watering methods which are expressly required 泵的项目描述应指 出明确需要的任何专门排水方法 A4 Item descriptions for the number and depth of light cable percussion boreholes shall state the nominal C3 Items for the depth of light cable percussion boreholes shall be deemed to include casings 灯线冲击 钻井 孔深度的项目说明将被视为包括 外套 Ml Chiselling to prove rock or to penetrate obstructions shall be easured only where it is expressly required 为证实岩石或穿透障碍物的 凿边应只在明确要求时进行测量 D1 Rotary drilled boreholes shall be classified as such whetherthe boring is carried out by a rig or by an attachment 02 Core boxes shall be deemed to become the property of the Employer unless otherwise stated 旋转钻孔 井将归 于钻孔是否要用钻机或附件来进行 D3 The maximum depth used for classification of rotary drilled boreholes which are continuations of light cable percussion boreholes shall be measured from the Commencing Surface of the light cable percussion borehole 用于作 为灯线冲击钻井 孔延续的旋转钻孔 井分 类的最大深度将从灯线冲击钻井 孔开始 面进行测量 A5 Item descriptions for rotary drilled boreholes shall state the nominal minimum core diameter 旋转钻孔 井的 项目说明应指出公称最小芯直径 A6 item descriptions for the numberof rotary drilled
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025中国邮政集团有限公司山东省分公司招聘笔试题库历年考点版附带答案详解
- 2025中国电信天翼数字生活科技有限公司招聘笔试题库历年考点版附带答案详解
- 2025年呼吸内科常见呼吸系统疾病诊断模拟测试卷答案及解析
- 2025年食品饮料行业食品安全与健康营养研究报告
- 2025年企业服务行业企业服务平台市场前景研究报告
- 2025年铁路运输行业智能化铁路建设与发展前景研究报告
- 2025年家电行业智能家居市场需求预测报告
- 2025年工程机械行业工程机械智能化发展研究报告
- 2025年体育产业体育赛事商业运营模式探索研究报告
- 2025年电子商务行业跨境支付与物流服务研究报告
- 2025年杭州上城区总工会公开招聘工会社会工作者9人笔试参考题库附答案解析
- 全国2022年10月自考05744《食品加工与保藏(专)》真题
- 最全面人教版八年级上册英语各单元作文范文汇总
- 赞美诗歌大全下载(赞美诗选下载全集)
- 文化人类学课件完整版
- 碳达峰碳中和产业发展调研报告
- 《海洋学》第二章 地球及海洋概观
- GB/T 12642-2013工业机器人性能规范及其试验方法
- ESG专题研究报告
- 【初中历史】商鞅变法优秀课件31-川教版
- 食品质量与安全管理概述课件
评论
0/150
提交评论