




免费预览已结束,剩余6页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Work Instructions for Cement Machinery and Equipment Installation Work Instructions for Installation of Non-standard Equipment CBMI.QEMS.03.766Installation of accessories, such as inspection doorValves, expansion joints installationTransducer carriage installationSupport installationAssembling equipment on groundFoundation centerlineSand pier arrangement and makingSetting up elevation reference pointAngle deviationMarking out longitudinal centerline and transversal centerlineFoundation acceptanceEquipment acceptanceI. Work steps for installation of non-standard equipment II. Quality control plan Items of process control Inspection content No.Description Inspection type Inspection category Control type Document type Document description 1.1Self-review/joint-review of drawings Record of self-review/joint-review of drawings 1.2Technical instructions for workRecord of technical instructions1.3Equipment acceptance CBMIJX-TY0031.4Foundation acceptance DIM 1BNKeep the inspection report of civil works construction2.1Marking out longitudinal centerline and transversal centerline DIM 1PNCBMI-JX-FB001/2 /3/42.2Angle deviation DIM 1PN2.3Setting up elevation reference point1B2.4Sand pier arrangement and making1BN2.5Foundation centerline DIM 1PN3.1Assembling equipment on ground1BN4.1Support installation 1BN4.2Transducer carriage installation 1BN4.3Valves, expansion joints installation 1BN4.4Installation of accessories, such as inspection door1BInspection type DIMdimension check DPdye penetration test MPmagnetic powder test MTmechanical test for samples RDX-radiographic test RTrunning testSCspecial inspection USultrasonic test VCvisual checkDocument type: Ninspection record RreportControl type Eensured item Bbasic item Pitem with permissible deviation Inspection category 1self inspection 2joint inspection III. Work process control procedure1. Preparation for works No.Content Inspection item Technical requirements Main points in operation Test device 1.1Self-review/joint-review of drawings As per system document1.2Technical instructions for work As per system document1.3Equipment acceptance As per “Equipment acceptance”1.4Foundation acceptance As per “Foundation acceptance” 2. Marking outNo.Content Inspection item Technical requirements Main points in operation Test device 2.1Longitudinal centerline and transversal centerline (vertical equipment)Deviation of longitudinal centerline Deviation of transversal centerline 1mmTo mark out according to the workshop process dimension and equipment requirement Theodolite Class I steel tapeN spring scale2.2Angle deviation (vertical equipment)Deviation between theoretical angle and measured angle1 2.3Setting up elevation reference pointElevation deviation 1mmAccording to the construction process drawings or the designated original elevation point, transplant the elevation to the equipment installation location and set up an elevation reference point and make a marking there. Keep it until the end of construction. 2.4Sand pier arrangement and makingAs per “Sand pier arrangement and making”Level gaugeTheodolite2.5Foundation centerline(horizontal big span)Axial centerline20mmElevation measuring pointElevation measuring pointTheodoliteSteel tapeEach supporting foundation centerline5mmRelative deviation of each foundation elevation3mm 3. Assembling and installation No.Content Inspection item Technical requirements Main points in operation Test device 3.1Assembling equipment on groundPerimeter difference on the same profile s5mmLongitudinal weldCircumferential weldWeld staggered from each other for at least 100mm.Steel board rule, steel tapeUnfitness of circumferential butt jointb1.5mmUnfitness of longitudinal butt jointb1.5mmAngularity 凹N2mmBevel and welding type as per fabrication standardN2LN2N1Asbestos cord or asbestos boardBolt connecting direction downwardsTheodoliteSteel tape凸N4mmEntire verticalityKH/1000mm Maximum not exceeding 20mmFlatness of flange end face1.5ma2mm1.5ma3mm4.1Support base or supporting pipe holder installation Foundation elevation deviation of base5mmWelding on siteMethod 2Method 1Connect flange and anchor bolts before welding the cylinder and the flangeWeld the flange and equipment before tightening boltsLevel gauge Level barLevelness after alignment2mm/m4.2Transducer carriage installation Elevation difference2mmEmbedded plateWeld after alignmentTransducer carriageMethod 1Level gauge Level barLevelness2mm/mDistance between bolt and hole wallNot less than 15mm4.2.1Coaxiality (verticality) measurementCoaxiality(verticality)3.3at assembling f5mmWelding or bolting as per 3.0Steel wireTheodoliteCoaxiality(verticality)at installingf10mm4.3Valves, expansion joints installation 1. To check the air or material flow direction against the process drawings when assembling, never install them in opposite direction.2. When install the expansion joint, pre-stretch it and connect it to the cylinder according to the heat expansion capacity. 3. Opening and closing of electrical double-valve must be freely and in good tightness condition.4. Support screw can be removed after installation and alignment.5. Opening and closing of valves on equipment, inspection doors are freely and in good rightness condition.4.4Installation of accessories, such as inspection door Tightness, flexibilityAs per item 3.4 Equipment installation inspection record CBMIJX-FB001Sub-project description Project S/NEquipment description Sub-item (procedure) description Foundation marking out 1Inspection category Self inspection Inspection datedd/mm/yyInspection item ItemABDrawing dimensionMeasured dimension1Deviation 2Deviation Permissible deviation Vertical equipmHorizontal ConclusionTeam:dd/mm/yySection chief:dd/mm/yyInspector:dd/mm/yyEquipment installation inspection record CBMIJX-FB002Sub-project description Project S/NEquipment description Sub-item (procedure) description Foundation marking out 2Inspection category Self inspection Inspection datedd/mm/yyInspection item Item L!L!L1L2Elevation point 1Elevation point 2Elevation point 2Drawing dimensionMeasured dimension1Deviation 2Deviation Permissible deviation LHorizontal equipment with multi-support pointElevation measuring pointElevation measuring pointConclusionTeam:dd/mm/yySection chief:dd/mm/yyInspector:dd/mm/yyEquipment installation inspection record CBMIJX-FB-003Sub-project description Project S/NEquipment description Sub-item (procedure) description Equipment supportInspection category Self inspection Inspection datedd/mm/yyInspection item ItemLevelness 1Levelness 2Levelness3Elevation point 1Elevation point 2Elevation
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年药理学药物代谢途径分析模拟考卷答案及解析
- 2025医保制度培训试题及答案
- 农民与合作社共同开展农业生产经营协议
- 2025年微生物学标本采集与处理规范考核模拟试卷答案及解析
- 2025年急性中毒患者处理急救应对模拟考试卷答案及解析
- 电商信息技术试卷及答案
- 2025年生物医学工程医疗器械维护保养答案及解析
- 2025年免疫学基础知识考核试题答案及解析
- 2025年中医内科中医内科辨证施治实践答案及解析
- 2025餐饮合作伙伴协议合同
- 肺栓塞药物治疗方案讲课件
- I型呼吸衰竭护理查房
- 口腔种植人员管理制度
- 精益管理培训课件
- 护理高职入学专业介绍
- 亚马逊创业合伙协议书
- 2025年网络与数据安全知识竞赛题库及答案(150题)
- 深入了解纺织品面料的特点试题及答案
- 2025年全国设备监理师(设备工程质量管理与检验)新版真题及解析
- 防雷施工劳务合同协议
- 2025年2025国庆节文艺晚会活动方案文艺晚会活动方案
评论
0/150
提交评论