全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
此文档收集于网络,如有侵权,请联系网站删除Project PlanProject Name:Date:Release:Draft/FinalAuthor:Owner:Client:Document Number:Note: This document is only valid on the day it was printedThe source of this document will be found in the Project fileRevision HistoryDate of next revision:Revision DatePrevious Revision DateSummary of ChangesChanges MarkedApprovalsThis document requires the following approvals. A signed copy should be placed in the project files.NameSignatureTitleDate of IssueVersionDistributionThis document has been distributed to:NameTitleDate of IssueVersion精品文档OverviewPurposeThe Project Plan is a mandatory plan that provides a statement of how and when a projects objectives are to be achieved, by showing the major products, activities and resources required on the project.It provides the Business Case with planned project costs and it identifies the management stages and other major control points.It is used by the Project Board as a baseline against which to monitor project progress and cost stage by stage.ContentsThe Project Plan should include the following elements Plan Description2Project Prerequisites2External dependencies2Planning assumptions2Project Plan3Contingency Plans3AdviceRefined from the outline Project Plan in the Project Brief during Planning a Project (IP2). Modified during Updating a Project Plan (SB2).Ensure that the plan is achievable and it supports the rest of the PID, of which it will become part.Plan Description(a brief description of what the plan covers)Project Prerequisites(include all fundamental aspects that must be in place at the start of the project and must remain in place for the project to succeed)External dependenciesPlanning assumptionsProject PlanInclude or reference the following: Project-level Gantt or bar chart with identified management stages Project-level Product Breakdown Structure Project-level Product Flow Diagrams Project-level Product Descriptions Project-level activity network Project financial budget Project change budget Project-level table of resource requirements Requested/assigned specific resources Project-level tolerances (for example, time and bud
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 八年级语文如梦令渔家傲联读教学设计
- 八年级英语短文填空期末专项复习教学设计
- 沪科版八年级物理“大气压强”高效培优教学设计
- 小学五年级语文口语交际制定班级公约教学设计
- 小学四年级美术社团教学设计:深海鲸影与色彩叙事
- 小学四年级英语《How Do You Get to School》基于核心素养的单元教学设计
- 高中化学高三一轮复习化学与传统文化微专题教学设计
- 高三英语读后续写对话语气留白法教学设计
- 初中八年级物理期末综合复习与检测讲评教学设计
- 高中美术《文化与习俗-从“泥土”中诞生的美》教学设计
- 新版2026-2027学年粤人版(新教材)小学英语三年级上册(全册)每课知识点清单梳理
- 大学《马克思主义基本原理》期末考试题库(含答案)
- 2026中国大数据产业白皮书-中国民营科技促进会
- 中国人与自然关系的综合评价理论框架及其实证检验
- 统编版历史八年级上册第11课《五四运动》教学课件
- 第25课《文言文二则曹冲称象》课件(五四学制)语文六年级上册
- BIM房地产BIM实施详细方案
- NY 311-1997醇基民用燃料
- JJF 1048-1995数据采集系统校准规范
- 邀请函模板完整
- 恒星的一生课件讲义
评论
0/150
提交评论