已阅读5页,还剩76页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Project Execution Plan rev 1 Vopak Caojing Terminal Project i ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER A review and approve C review and consturction NOTE Above list of Documents Required for Owner s approval are not exhaustive This list shall be updated as and when necessary as more documents are firmed up Project Execution Plan rev 231 For Vopak Caojing Terminal Project ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER run in equipment X e Assist Owner to calibrate all solids weighing and measuring devices in their field installed operating positions Furnish record of all calibration date Show that equipment meets the specified tolerance for accuracy over full range of operating conditions X 5 Piping a Hydrostatically test all piping as required by drawings and specifications X b Install all temporary strainers and temporary blanks called for on drawings and specification X c Witness and approve all filed pressure tests X d Schedule and carry out water flushing operations XX Witness e Clean temporary strainers during X Project Execution Plan rev 269 Vopak Caojing Terminal Project ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER ELECTRIC CORP S PTE LTD ATTACHMENT 16 1 Sheet 4 of 6 DIVISION OF RESPONSIBILITIES FOR TURNOVER Mechanical Completion Pre commissioning ItemContractor Owner SC Contractor Owner SC and after the flushing operation Remove control valves before flushing 6 Electrical a Remove all rust preventatives oils grease etc used to preserve equipment during construction X b Install necessary lubricants X c Perform all necessary non operating tests and checks on generators following manufacturer s instruction X d Perform applicable installation checks adjustments and field tests prior energizing X e Energize all substations X f Calibrate and set relays on all circuit breakers Set time delays X g Check operability of emergency and instrument power systems X h Assume responsibility for maintenance and operation of all electrical facilities which are energized X 11 Instrumentation a Perform required pressure tests on instrument take off piping and air piping and tubing X b Check continuity and identification of transmission and control systems for each instrument to insure proper X Project Execution Plan rev 270 Vopak Caojing Terminal Project ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER ELECTRIC CORP S PTE LTD ATTACHMENT 16 1 Sheet 5 of 6 DIVISION OF RESPONSIBILITIES FOR TURNOVER Mechanical Completion Pre commissioning ItemContractor Owner SC ContractorOwner SC hook up This applies to both pneumatic and electrical systems c Witness all required tests X d Remove control valves rotameters orifice plates flow nozzles venturi and other inline primary flow elements strainers and other equipment as necessary before hydrostatic testing Reinstall and check for direction of flow and proper operation i e travel action with air failure etc X e Install air pressure and temperature gauges X f Calibrate all instruments X g Install all orifice plates after water flushing and or blowing X h Install sealing fluids where required X 12 Safety Equipment a Install safety valves or dummy spools during construction X b Schedule safety valve testing with Owner s agreement sufficiently in advance of start up to permit orderly installation X c Remove as necessary and transport all safety valves to and fro test facilities X d Provide test facilities for safety valves and carry out X Project Execution Plan rev 271 Vopak Caojing Terminal Project ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER ELECTRIC CORP S PTE LTD ATTACHMENT 16 1 Sheet 6 of 6 DIVISION OF RESPONSIBILITIES FOR TURNOVER Mechanical Completion Pre commissioning ItemContractor Owner SC ContractorOwner SC e Witness tests and do tagging X f Install all safety valves after test X g Paint and or tag all safety valves car sealed valves and safety equipment X h Install car seals on block valves where required X Project Execution Plan rev 272 Vopak Caojing Terminal Project ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER ELECTRIC CORP S PTE LTD ATTACHMENT 16 3 Sheet 1 of 2 Date Letter No File No Mr xxxxxxxxxxxxxxxx Project Manager xxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxx Dear Mr xxxxxxxxxxxxx NOTICE OF MECHANICAL COMPLETION This is to notify you that the unit state herein will be turned over to you in accordance with Article xxxxx of the Contract and the Turn Over Procedure and under the conditions described below 1 Unit to be Turned Over 2 Date to be Turnover 2 1Date of first Punch List submitted 2 2Date of Comments given by Owner 2 3Completion Date of all work remaining on Punch List as marked by Owner 3 Turnover Conditions 3 1Remaining work to be performed after turning over unit is as shown on Attached Punch List 3 2Remaining work will be completed by 4 Attachments Punch List dated Project Execution Plan rev 273 Vopak Caojing Terminal Project ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER ELECTRIC CORP S PTE LTD ATTACHMENT 16 3 Sheet 2 of 2 It is requested that the Certificate of Mechanical Completion be issued in accordance with the Turnover Procedure Yours faithfully RCC CONSORTIUM XXXXXXXXXXXXXXX PROJECT MANAGER Project Execution Plan rev 274 Vopak Caojing Terminal Project ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER ELECTRIC CORP S PTE LTD ATTACHMENT 16 4 Sheet 1 of 2 Date Letter No File No Mr xxxxxxxxxxxxxxxx Project Manager xxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxx Dear Mr xxxxxxxxxxxxx NOTICE OF COMPLETION OF REPAIR WORK This letter is to notify you that all the work items mentioned in the following notices have been performed by Contractor 1 Unit 2 Notice of Mechanical CompletionNo Dated 3 Owner s Notice of Repair Work No Dated In this regard it is requested that the Certificate of Mechanical Completion be issued in accordance with the Turnover Procedure as mutually agreed Project Execution Plan rev 275 Vopak Caojing Terminal Project ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER ELECTRIC CORP S PTE LTD ATTACHMENT 16 4 Sheet 2 of 2 Yours faithfully RCC CONSORTIUM XXXXXXXXXXXXXXX POJECT MANAGER Project Execution Plan rev 276 Vopak Caojing Terminal Project ROTARY ENGINEERING LIMITED CHINA INTERNATIONAL WATER ELECTRIC CORP S PTE LTD ATTACHMENT 16 5 Sheet 1 of 2 Date Letter No File No Mr xxxxxxxxxxxxxxxx Project Manager xxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxx Dear Mr xxx
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 企业信息安全风险评估及整改方案
- 2025年安徽省公需课学习-全民健身计划实施方案1416
- 购销防盗门合同范本
- 髁突良性肿瘤的护理查房
- 电商仓储员工管理及效率提升方案
- 环境保护项目方案编写指南
- 商业连锁体系会员管理运营方案
- 零售连锁企业会员系统运营方案及案例
- 消化道取出术的护理配合
- 2026广东佛山市禅城区南庄镇吉利中学新苗人才招聘2人考试笔试参考题库及答案解析
- 劳动力调查业务知识培训课件
- 2025年党纪党规知识测试题(含答案)
- 影城考勤管理制度
- 回转窑石灰煅烧工安全技术操作规程
- 广东小高考真题数学试卷
- 南华大学《高等数学》2024-2025学年期末试卷(A卷)含答案
- 挂篮施工安全培训课件
- 学堂在线 海权与制海权 结业考试答案
- 2025年中考英语时文阅读15(学生版+解析版)
- “艾梅乙”感染者消除医疗歧视制度
- 持续工艺确认培训课件
评论
0/150
提交评论