




免费预览已结束,剩余1页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
此文档收集于网络,如有侵权,请联系网站删除Impact Analysis Checklist for Requirements ChangesImplications of the Proposed Changeo Identify any existing requirements in the baseline that conflict with the proposed change.o Identify any other pending requirement changes that conflict with the proposed change.o What are the consequences of not making the change?o What are possible adverse side effects or other risks of making the proposed change?o Will the proposed change adversely affect performance requirements or other quality attributes?o Is the proposed change feasible within known technical constraints and current staff skills?o Will the proposed change place unacceptable demands on any computer resources required for the development, test, or host environments?o Must any tools be acquired to implement and test the change?o How will the proposed change affect the sequence, dependencies, effort, or scheduled duration of any tasks currently in the project plan?o Will prototyping or other user input be required to verify the proposed change?o How much effort that has already been invested in the project will be lost if this change is accepted?o Will the proposed change cause an increase in product unit cost, such as by increasing third-party product licensing fees?o Will the change affect any marketing, manufacturing, training, or customer support plans?Software Elements Affected by the Proposed Changeo Identify any user interface changes, additions, or deletions required.o Identify any changes, additions, or deletions required in reports, databases, or data files.o Identify the design components that must be created, modified, or deleted.o Identify the source code files that must be created, modified, or deleted.o Identify any changes required in build files.o Identify existing unit, integration, and system test cases that must be modified or deleted.o Estimate the number of new unit, integration, and system test cases that will be required.o Identify any help screens, user manuals, training materials, or other documentation that must be created or modified.o Identify any other systems, applications, libraries, or hardware components affected by the change.q Identify any third party software that must be purchased.o Identify any impact the proposed change will have on the projects software project management plan, software quality assurance plan, software configuration management plan, or other plans.o Identify work products that must be reviewed after they are modified.Effort Estimation for a Requirements ChangeEffort(Labor Hours)TaskUpdate the SRS or requirements database with the new requirementDevelop and evaluate prototypeCreate new design componentsModify existing design componentsDevelop new user interface componentsModify existing user interface componentsDevelop new user publications and help screensModify existing user publications and help screensDevelop new source codeModify existing source codePurchase and integrate third party softwareModify build filesDevelop new unit and integration testsModify existing unit and integration testsPerform unit and integration testing after implementationWrite new system test casesModify existing system test casesModify automated test driversPerform regression testing at unit, integration, and system levelsDevelop new reportsModify existing reportsDevelop new database elementsModify existing database elementsDevelop new data filesModify existing data filesModify various project plansUpdate other documentationUpdate requirements traceability matrixReview work productsPerform rework following reviews and testingTOTAL ESTIMATED EFFORTProcedure:1. Identify the subset of the above tasks that will have to be done.2. Allocate resources to tasks.3. Estimate effort required for pertinent tasks listed above, based on assigned resources.4. Total the effort estimates.5. Sequence tasks and identify predecessors.6. Determine whether change is on the projects critical path.7. Estimate schedule and cost impact.Impact Analysis Report TemplateChange Request ID:_Title:_Description:_Analyst: _Date Prepared: _Prioritization Estimates:Relative Benefit: (1-9)Relative Penalty: (1-9)Relative Cost: (1-9)Relative Risk: (1-9)Calculated Priority:Estimated total effort:_ labor hoursEstimated lost effort:_ labor hoursEstimated schedule impact:_ d
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 智慧农业数据平台建设实施方案
- 销售数据分析及预测报告模板
- 金东区2025浙江金华市金东区部分单位招聘驾驶员3人笔试历年参考题库附带答案详解
- 赣州市2025江西赣州经济技术开发区疾病预防控制中心招聘见习生1人笔试历年参考题库附带答案详解
- 高压输电线路施工技术与维护规范实训日记
- 客户关系管理CRM系统实施计划
- 清远市2025广东清远市英德市医疗机构招聘事业单位人员147人笔试历年参考题库附带答案详解
- 济南市2025山东济南市28家市属事业单位招聘1226人笔试历年参考题库附带答案详解
- 河北省2025年河北农业大学第二批公开选聘工作人员51名笔试历年参考题库附带答案详解
- 柳州市2025广西柳州市青紫荆青少年社会工作服务中心招聘1人笔试历年参考题库附带答案详解
- 2025双11大促商家一站式指南
- 咖啡基础培训课件
- 人才服务合同书
- 2025年工会财务大赛理论题库(附答案)
- 2025-2026学年统编版八年级上册道德与法治教学计划含教学进度表
- 矿井顶板事故防治课件
- 2025年中国电力投资集团校园招聘笔试题型分析及备考策略
- 抗生素课件教学课件
- 销售法律知识培训
- 中国慢性胃炎诊治指南(2022年)解读
- 糖尿病低血糖症诊疗指南
评论
0/150
提交评论