




免费预览已结束,剩余6页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
中文3700字Soil nail wall, also known as soil nailing technology, which is installed in situ soil with a relatively dense soil nails, and soil slope surface of sprayed concrete to build a steel mesh surface layer, through the soil nails, the surface layer and in-situ soil the role of the three common slope or retaining wall side. Soil nail walls but also poses a similar gravity in situ reinforced earth retaining structures. And supporting a variety of methods have been compared, it has the construction easy, simple equipment, require little space, excavation and supporting jobs can be parallel, the overall progress of the fast, low cost, as well as pollution, low noise, stable and reliable, social and economic good, and many other advantages, and therefore at home and abroad with the foundation pit slope reinforcement has been widely applied rapidly. Soil nail wall construction technology is a top-down step by step build process, according to the following order: According to design requirements for excavation face, trimmed slope, planted sprayed concrete thickness control signs; jet first layer of concrete; erection of drilling soil nails, grouting, erection of connectors; banding steel net, spray a second layer of concrete; set top of the hill, slope and the foot of the slope of the drainage system. Soil-nailed law-enforcement: keep as much as possible, significantly higher maximum use of pit wall side of inherent mechanical strength of soil, changing soil structure and system load as part of the bracing. Sprayed concrete under the effect of high pressure gas flow, wherein high-speed soil surface layer and the soil in the spray created between embedded solid-effect, and gradually form a completely closed with the excavation shoring systems, spray layer and mounted with a protective layer of and reinforcement of topsoil, so that to avoid exposure to wind and rain erosion, shallow collapse, local spalling, as well as the role of impermeable impermeable. Soil nailing a special control pressure grouting can be reinforced medium greatly improved physical and mechanical properties make it become a new geological body, its solid-solid in the slip plane the deep section of the soil outside the house, its external fixed terminal Spray the surface layer in conjunction with the network as a whole may be a tendency to instability in the side wall transferred to the solid-section and its vicinity and to eliminate. Reinforced Mesh sprayed layer can have a better integrity and flexibility, can effectively adjust the spray layer and the stress distribution within the soil nail. Active soil nail retaining soil and with soil together with construction of simple, rapid and timely, flexible applicability, with the digging with sticks, safe and economic characteristics. Its duration is generally poorer than the traditional method to save more than 30-60d, engineering, low cost and 10% -30%, supporting the maximum vertical pit depth has now reached 21.5m, built mud (local miscellaneous fill) pit depth of 10m. This method not only effectively be used for general geotechnical deep excavation shoring, often also used a number of other ancillary support measures, can effectively be used for supporting streaming sand, silt, complex filling, saturated soil, soft soil, etc. adverse geological conditions of the deep excavation. In addition, it is also rapid, reliable and economical method of using the traditional method or improved facilities to be made or have been carried out rescue excavation instability reinforcement. Of soil nailing and reinforced soil and anchor it seems such as retaining structures, however, the structure of soil nailing and reinforced earth construction, etc. There are many different points, and anchor. First of all, soil nailing and reinforced soil slope or retaining wall is not the same, mainly reflected in: the construction in different ways. Soil-nailed construction of the distribution of expansion from top to bottom, side excavation while retaining full use of undisturbed soil strength. Reinforced earth structure from bottom to top filling layered construction, filling choice, density and intensity can be controlled; reinforced pull the biggest changes in body pattern is different. In the reinforced earth structure, the general body at the bottom of the tendon force maximum. In the structure of soil nailing, the general range of the central part of the largest force of soil nail, the upper and bottom of the soil nail force small; different deformation properties. Soil Nailing the maximum displacement occurred in the supporting slope at the top or near the top, reinforced earth structure, the maximum displacement at the bottom. Secondly, soil nailing and bolting or retaining wall is not the same, mainly due to: the various parts of the force and the same role. Bolting or retaining wall of the anchor generally anchorage section and free above, the use of sliding surface to provide resistance outside the anchorage section, set the anchor generally prestressed, the free section under uniform tension effect, through the anchor seat passed to the slope of the retaining structures, earth retaining structures greater stiffness, mainly through the provision of resistance by the moment, is one of the main force components. Soil nailing settings generally do not impose pre-tension, but occurs in the soil after a small deformation of the passive force, the size of the force along the uneven distribution of soil nail extension, the middle on both sides of the small, the role of the force at the surface layer than the small, sprayed concrete surface layer is not a major force components, its role is to stabilize the surface of the partial excavation of soil to prevent caving and erosion; setting different densities. In the bolt support in the unit area on the retaining bolt set the number of generally less, for each root anchor construction accuracy and requirements are very stringent. In the soil-nailing, the surface of soil nail retaining a little bit more dense arrangement of individual soil nail construction relatively low accuracy and quality requirements; design of different lengths. In the bolt support, the design requirements must meet the requirements of each root anchor of resistance, so bolt anchorage section require in-depth into the stable layer, the design of a longer length. In soil nailing, the more dense arrangement of soil nail, the large number of interaction with the surrounding soil, to maintain self-reinforced zone of soil stability, and resistance to outside the region reinforced the role of soil pressure, design shorter length. Of course, there are many types of bolts, there are not pre-stressed, the length than the average soil-nail even shorter, but this bolt is mainly used for the tunnel or underground works of the spray-anchor on the length than the average soil-nail is also is shorter, often only 2-4m. (1)Construction of Soil Nail Soil nailing is a soil-nail as a major component of the slope of the force supporting technology, which consists of dense soil nail group, has been reinforced in situ soil, sprayed concrete surface layer and the necessary water system components. (2)Structural Materials Steel: steel types, models and sizes should be consistent with design requirements, should adopt the H-or H-class steel workers, reinforced after the purchase should be properly safeguarded to prevent corrosion, production should be transferred straight, rust, oil removal, should be carried out physical and mechanical properties or chemical composition analysis of test welding of steel, should be weldability and welding quality of the test for detection of welding material strength should be greater than the overall strength; Cement: ordinary portland cement used, label P032.5, if necessary, sulfuric acid resistant cement, alumina cement should not be used. Cement should comply with the provisions of the existing cement standard requirements, there must be a single factory test reports, quality inspection orders, factory card documents, in accordance with its varieties, label, test numbers etc., and inspection and acceptance sampling inspection, by the examination results are reasonableUse. Bags of cement should be properly kept in storage and transportation, rain, moisture, stacked in a certain height from the ground heap shelves, is strictly prohibited and damage throwing throwing bags, prohibited the use of damp or different varieties of mixed cement label. Aggregate: stone and sand material (seeds film, medium-fine sand) should check report cards, the stone test methods and quality standards by JGJ53-92, sand material testing methods and quality standards by JGJ52-92. Particle size of less than 2mm in the sand, sand, clay content by weight not more than 3%, the particle size of less than 12mm gravel or melon tablets, clay content by weight not more than 3%. Mixing of water: the water without affecting the normal condensation of cement hardening of harmful impurities, may not contain fat, sugar and free acid, etc.; water, PH value is less than four of acidic water and sulfur ion of more than 1% of the water weight of water were shall not be used; the use of tap water or clean water for mixing natural water could be dispensed with for testing. Quick-setting agent: quick-setting agent is used in J85, 711, or Red Star 1, should be specifically responsible for control, add the weight of 3% of the weight of cement, the machine automatically added by the jet. Electrodes: The THJ422. Concrete mix: In addition to spraying the concrete mix design standards to be attained strength, we must also meet the technical requirements of construction, with the ratio of 1:0.4:2:2 (cement: water: sand: melon pieces), melon seeds piece maximum diameter of not more than 12mm. Grouting mixture ratio: one-grouting with cement mortar 1:1, the second grouting using water-cement ratio of 0.5 water slurry, cement mortar and cement slurry must be stirred evenly pure, a mixing of the slurry must be initial setting before ( generally 2h) run out. Early strength and water-reducing agent: According to the nature of projects, using different types of early strength agent, commonly used red star on the 4th, 3F, NC, NNOF, NS2-1 and so on. (3)Net production of soil nailing and reinforced Size allowable deviation of soil nail making: the length of ?100mm, curved reposted elsewhere in the paper for free download (4)Drainage System Soil Nailing appropriate to remove ground water under the conditions of construction, the drainage should take appropriate measures, including surface drainage, internal drainage, as well as supporting the drainage pit in order to avoid saturation of the soil and reduce the role of the hydrostatic layer on the surface pressure. Excavation around the bracing should be added within the surface finishing, and building drains and cement mortar or concrete surface to the underground water surface infiltration of precipitation. Pit top of the hill near the 2-4m wide and the ground should be properly boosted, and the inside of high external low, easy to run-off away from the slope. In supporting the back surface layer should be inserted in a length of 400-600mm, diameter of not less than the standard 40mm drain out its external side supporting surface layer spacing for 1.5-2m, in order to spray the plot after the surface layer of concrete water discharge. To rule out the accumulated water seepage inside the pit and rain should be set 300mm * 300mm Bottom drains, leads to the 600mm * 600mm * 600mm sump. Drains, leave the side wall 0.5-1m, drains and sump is appropriate to brick and mortar Plastering used to prevent leakage, pit water should be out in time. Mechanism of composite soil nail force.In the soil nailing system, the soil nail is an important force components, the role of soil nail will act on the surface layer or soil-cement pile on the water, soil pressure, soil nail and soil through the mill passed to the stability of the resistance Formation to go, similar to the soil anchor; through the dense and the soil nails will be a short retaining body deformation Houtu bound together to form from the soil, grouting and soil nailing body a composite soil, composite soil similar to the on the force of gravity dam. This role is similar to reinforced earth retaining pit; no matter what form of construction of soil nail (hole-drilling method, and entering the law and the roof into the law), soil nailing channels are grouting holes, which not only formed a soil grouting nail retaining wall and the formation of friction between the belt, at the same time in order to split, penetration and compaction grouting in the form of reinforced retaining Houtu body, such a role similar to the mechanism of compaction grouting. The process of soil nail force Measurements showed that the process of soil nail force can be divided into three stages: Phase I: soil nail installed an early stage, but the completion of grouting grouting of the bonding between the body and the soil has not been formed, when the soil nail largely unaffected by power. Phase II: grouting body of the soil nail bonding in the formation, with the excavation depth increases, soil nailing has the effect of tension, and tension concentrated in the surface layer bonded with the site, then internal force distribution is similar to non - Free-form deformation of the soil anchor segment near the surface layer at the biggest rally, the subsequent decrease gradually. The third phase: excavation of sufficient depth, soil nailing most of the slip at the range. At this time the performance of soil nailing for the middle of internal force (near the slip surface) the largest and the smallest at both ends. Force distribution is similar to reinforced earth retaining wall in the stretch. 土钉墙又称为土钉支护技术,它是在原位土中敷设较为密集的土钉,并在土边坡表面构筑钢丝网喷射混凝土面层,通过土钉、面层和原位土体三者的共同作用而支护边坡或边壁。土钉墙体同时也构成了一个就地加固的类似重力式挡土结构。与已有的各种支护方法相比,它具有施工容易、设备简单、需要场地小,开挖与支护作业可以并行、总体进度快、成本低,以及无污染、噪声小、稳定可靠、社会效益与经济效益好等许多优点,因而在国内外的边坡加固与基坑支护中得到了广泛迅速的应用。土钉墙的施工技术是一种由上而下分步修建的过程,可按下列顺序进行:按设计要求开挖工作面,修整边坡,埋设喷射混凝土厚度控制标志;喷射第一层混凝土;钻孔安设土钉、注浆、安设连接件;绑扎钢筋网,喷射第二层混凝土;设置坡顶、坡面和坡脚的排水系统。土钉支护法:以尽可能保持、显著提高、最大限度地利用基坑边壁土体固有力学强度,变土体荷载为支护结构体系一部分。喷射混凝土在高压气流的作用下高速喷向土层表面,在喷层与土层间产生“嵌固效应”,并随开挖逐步形成全封闭支护系统,喷层与嵌固层同具有保护和加固表层土,使之避免风化和雨水冲刷、浅层坍塌、局部剥落,以及隔水防渗作用。土钉的特殊控压注浆可使被加固介质物理力学性能大为改善并使之成为一种新地质体,其内固段深固于滑移面之外的土体内部,其外固端同喷网面层联为一体,可把边壁不稳定的倾向转移到内固段及其附近并消除。钢筋网可使喷层具有更好的整体性和柔性,能有效地调整喷层与土钉内应力分布。土钉主动支护土体并与土体共同作用,具有施工简便、快速及时,机动灵活、适用性强、随挖随支、安全经济等特点。其工期一般比传统法节省30-60d以上,工程造价低10%-30%,支护最大垂直坑深目前已达到21.5m,建成淤泥(局部杂填土)基坑深达10m。该方法不仅能有效地用于一般岩土深基坑工程支护,而且通常还采用一些其他辅助支护措施,能有效地用于支护流砂、淤泥、复杂填土、饱和土、软土等不良地质条件下的深基坑。此外,它还能快速、可靠、经济地对采用传统法或改良法施作的将要或已经失稳的基坑进行抢险加固处理。土钉支护似乎与加筋土和锚杆等挡土结构一样,然而土钉支护在结构施工等方面与加筋土和锚杆有许多不同点。首先,土钉支护与加筋土边坡或挡墙不相同,主要表现在:施工方法不同。土钉支扩从上到下分布进行修建,边开挖边支护,充分利用原状土的强度。加筋土结构由下到上分层填土构筑,填料可以选择,密实度和强度可以控制;加筋体最大拉力的变化规律不同。在加筋土结构中,一般处于下部的筋体受力最大。在土钉支护结构中,一般介于中部的土钉受力最大,上部和底部的土钉受力较小;变形性能不同。土钉支护最大位移发生在支护边坡顶部或接近顶部,加筋土结构的最大位移在底部。其次,土钉支护与锚杆支护或挡墙也不相同,主要在于:各部分的受力和作用不同。锚杆支护或挡墙中的锚杆一般都有锚固段和自由段,利用滑动面以外的锚固段提供抗力,设置锚杆一般要施加预应力,自由段受到均匀的拉力作用,通过锚座传递到坡面的挡土构件上,挡土构件的刚度较大,主要通过受弯矩提供抗力,是主要的受力部件之一。土钉设置后一般不施加预拉力,只是在土体发生微小变形后才被动受力,受力的大小沿土钉延长的分布不均匀,中间大两边小,所作用在面层上的力较小,喷射混凝土面层不是主要受力部件,其作用是稳定开挖面上的局部土体,防止崩落和受到侵蚀;设置密度不同。在锚杆支护中,单位支护面积上设置的锚杆数量通常较少,对每根锚杆的施工精度和要求都十分严格。在土钉支护中,支护面上土钉排列得较密,对单个土钉的施工精度和质量要求相对较低;设计长度不同。在锚杆支护中,设计要求每根锚杆都要达到要求的抗力,所以锚杆的锚固段需要深入到稳定的土层中,设计长度较长。在土钉支护中,土钉排列较密,数量众多,与周围土层共同作用,能够保持加固区土体的自身的稳定,并抵抗加固区以外的土压力的作用,设计长度较短。当然,锚杆有许多种类,也有不加预应力、长度比一般的土钉还要短,但这种锚杆主要用于隧道或地下工程的喷锚支护上,长度比一般的土钉还要短,常用只有2-4m。(1)土钉墙结构组成土钉支护是以土钉作为主要受力构件的边坡支护技术,它由密集的土钉群、被加固的原位土体、喷射混凝土面层和必要的防水系统组成。(2)土钉墙结构材料钢材:钢筋的种类、型号及尺寸规格应符合设计要
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 三基临床考试题库及答案
- 纠纷调解考试题库及答案
- 25秋新人教版英语七年级上册 Unit 3 section B同步练习(含答案)
- 2025年新疆农业培训合作合同协议
- 2025年物业管理费缴纳合同协议
- 土木工程考试题及答案
- 医学定向考试题库及答案
- 日照社工招聘笔试题目及答案
- 人才培养笔试题及答案
- 2025年世界知识产权日知识产权考试练习题及答案
- 医学院研究生招生宣传
- 大型活动安全风险评估报告
- 大数据分析与数据挖掘知识习题集
- GB/T 25820-2025包装用钢带
- 制约婚内家暴协议书
- 点云质量评估-全面剖析
- 形婚协议书合同完整版
- 海南时政面试试题及答案
- 2025年乡镇计划生育工作培训方案
- 砭石疗法培训学习资料
- 2025年湖南生物机电职业技术学院单招职业技能测试题库附答案
评论
0/150
提交评论