




已阅读5页,还剩68页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
.GlaxoSmithKlineTSK&FXXXX公司Title:题目Site Validation Master Plan of TSK&FXXXX公司 中美天津史克XXXX公司工厂验证主计划Document No文件编号Document Type文件类型Page Number页码SVMP_16Site Validation Master Plan9 of 73Approval and Authorization批准和授权Completion of the following signature blocks signifies the review and approval of this document完成以下签字意味着完成了对此文件的回顾和批准Name姓名Job Title/Role职位/角色Signature签字Date日期The Author is signing to confirm that this document has been prepared in accordance with an approved document management process that content is consistent with the deliverable definition found in the PSOP1432XXXX Site Validation Approach, and that relevant input from any contributory authors has been included.作者的签字证明文件是按照批准的文件管理规程准备的,其中内容符合PSOPXXXX1432 工厂验证流程对验证文件的定义。并确认相关人员的意见均已包含在文件中后签署文件。Merry XiaoValidation EngineerCompliance & Validation are signing to confirm compliance with applicable pharmaceutical regulatory agency requirements and Company standards.法规和验证的签字确认其符合制药法规组织的要求和公司标准。Jessica HuValidation Assistant ManagerBelinda ChenQuality HeadManagerSite Director is signing to confirm projects in site and provide the required resources for validation activities.工厂总监的签字是确认工厂需要进行的项目和为工厂验证活动提供需要的资源。Shirlene M GoldsbroughSite DirectorDistribution List分发清单 No Distribution Required不需要分发 Field Execution Copy在执行过程中需要复印件Copy No复印件编号Issued To (Name / Department)交给(姓名部门)Issued By (C&V)由谁生效(法规和验证组)Date of Issue生效日期123目录CONTENT1目的 Objective32验证的指导方针与规程Validation Polices and Procedures43责任 Responsibilities64验证的时间表与进展 Schedules and Progress952007年度完成的验证项目Validation Projects completed in 20073430332762007年度暂停和取消的验证项目Validation Projects on hold and cancelled in 2007443942377修订历史Revision History484347421 目的 Objective该工厂验证总计划是为了提供一个对中美天津史克XXXX公司制药有限公司的验证工作的综合描述。具体而言,该计划将: The purpose of the SVMP is to provide a comprehensive overview of all validation activities in TSKFXXXX公司. The plan will cover following:1) 列出公司在进行验证工作时所必须遵循的指导方针与指南。List the governing policies and procedures that must be followed in validation activities.2) 确定公司各部门和主要管理人员在验证工作中的主要责任。Define the responsibilities of key personnel in validation activities.3) 列出公司目前主要的验证工作类别以及与其相关的验证主计划。List the main validation activities in the site and the references to the validation master plans.4) 描述公司目前正在进行和计划将要进行的验证工作和项目的程序和进展。Describe the execution status of validation activities that are in process or in plan.2 验证的指导方针与规程Validation Polices and Procedures 验证类别 Validation Type文件编号 Document No文件名称 Document Name验证生命周期 The Validation Life CycleGQP 1204The Validation Life Cycle 验证生命周期Validation Documentation 验证文件Validation Maintenance验证维护Impact Assessment 影响评估Design Qualification设计确认Validation Review 验证回顾验证生命周期Validation lifecycleGQMP 1008验证生命周期Validation lifecycle清洗验证Cleaning ValidationGQP 6202Cleaning Validation 清洁验证分析方法与设备验证Analytical Method & Equipment ValidationGQP 7113Validation of Analytical Equipment and Analytical Methods分析设备与分析方法的验证计算机系统的验证Computer ValidationGQP 1205GQP 3202Computerised System Validation 计算机系统验证Regulated Electronic Records and Signatures法规要求的电子记录和电子签名注释:GQP = Global Quality Policy (葛兰素史克集团)全球质量方针GQMP=Global Quality Management Process (葛兰素史克集团)全球质量管理规程 生产厂关键规程列表如下:Key site procedures are listed in the table below.文件名称 Document Name文件编号 SOP Number工厂验证管理规程 Site Validation Approach PSOP1432分析仪器验证通则 Analytical Equipment Validation ApproachPSOP0832化学检验方法验证规程 Chemical Analysis Method Validation ApproachPSOP0834生产设施验证规程Manufacturing Facility ValidationSOP1433验证草案和报告的生成 Generation of Qualification Protocols and ReportsSOP1438设计确认程序Validation Procedure for Design QualificationSOP1439安装确认程序Validation Procedure for Installation QualificationSOP1440运行确认程序Validation Procedure for Operational QualificationSOP1441性能确认程序Validation Procedure for Performance QualificationSOP1442计算机验证方法 Computer Validation ApproachSOP1443清洁验证 Cleaning ValidationSOP1445维护系统的验证状态 Maintaining Systems the Validated Status SOP1446控制系统Control System Validation ApproachSOP1447系统影响性评估System Impact Assessment SOP1451分析仪器验证通则 Analytical Equipment Validation ApproachSOP0832化学检验方法验证规程 Chemical Analysis Method Validation ApproachSOP0834;.3 责任 Responsibilities部门/人员Department/Personnel责任 Responsibility质量保证部验证组QA Validationl 负责制订与回顾年度SVMPResponsible for preparing and reviewing SVMPl 负责制订与回顾各项目验证主计划Responsible for preparing and reviewing VMP of every projectl 协调各个验证过程并参与评估待验证项目Co-ordinate all validation processes and, participates in the assessment of prospective projects for validation requirements.l 组织与验证相关培训Organize the training for validation.l 对验证主计划、方案及报告进行审核并将已完成的验证文件存档Review validation master plan, validation protocols and reports, archive validation documents.物资管理部Logisticl 起草仓库相关项目的用户需求标准、方案与报告Prepare the URS, validation protocols and reports for projects of warehouse.l 进行验证前的评估System assessment before validationl 按批准的验证方案执行验证Execute validation activities following approved validation protocol.l 数据汇总及对在验证过程产生的问题进行调查Data collection and problem investigation during validation.工程部Engineering Departmentl 起草公用设施与设备的用户需求标准、方案与报告Prepare the URS, validation protocols and reports for facilities and utilities.l 进行验证前的评估System assessment before validationl 按批准的验证方案执行验证Execute validation activities following approved validation protocol.l 数据汇总及对在验证过程产生的问题进行调查Data collection and problem investigation during validation.技术部Technical l 起草新产品和产品转移的方案与报告Prepare validation protocols and reports for new products and products transfer l 进行验证前的评估System assessment before validationl 按批准的验证方案执行验证Execute validation activities following approved validation protocol.l 数据汇总及对在验证过程产生的问题进行调查Data collection and problem investigation during validation.l 对工艺验证草案/报告进行批准Approve process validation protocol and report价值流Value Streaml 起草生产设备与工艺的用户需求标准、方案与报告Prepare product equipment and process URS, validation protocols and reportsl 进行验证前的评估System assessment before validationl 按批准的验证方案执行验证Execute validation activities following approved validation protocol.l 数据汇总及对在验证过程产生的问题进行调查Data collection and problem investigation during the validation.实验室QC Labl 起草分析仪器及分析方法的用户需求标准、方案与报告Prepare analytical equipment and test methods URS, validation protocols and reportsl 进行验证前的评估System assessment before validationl 完成在验证过程中涉及的检验并提供及时准确的数据Complete the test in the validation activities and provide timely accurate data.l 按批准的验证方案执行验证Execute validation activities following approved validation protocolsl 数据汇总及对在验证过程产生的问题进行调查Data collection and problem investigation during the validation.质量保证部QA组l 确保验证按照批准的方案进行Ensure the validation is executed according to the validation protocoll 参与对在验证过程中产生的问题的调查Take part in problem investigation during validation.质量保证部经理QA Head of Qualityl 确保所有的验证活动符合葛兰素史克XXXX集团及所涉及市场的法规部门的要求Ensure all the validation activities comply with the GSK GQPs and site proceduresl 批准SVMP,验证主计划、工艺验证的方案与报告、清洁验证草案和报告、项目cGMP回顾报告、验证总结报告Approve SVMP, VMP, performance qualification protocol and report, cleaning validation protocol and report, project cGMP review report ,validation summary report工厂总监Site Directorl 批准SVMP Approve SVMPl 为验证工作提供必要的人力资源及财力资源 Provide the required resources for validation activities.GlaxoSmithKlineTSK&FTitle:题目Site Validation Master Plan of TSK&F 中美天津史克工厂验证主计划Document No文件编号Document Type文件类型Page Number页码SVMP_16Site Validation Master Plan10 of 73.GlaxoSmithKlineTSK&FXXXX公司Title:题目Site Validation Master Plan of TSK&FXXXX公司 中美天津史克XXXX公司工厂验证主计划Document No文件编号Document Type文件类型Page Number页码SVMP_16xxSite Validation Master Plan64 of 734 验证的时间表与进展 Schedules and Progress4.1 价值流部门某车间的验证项目Validation Projects in Value Streams A workshop 4.1.1 胶囊价值流Capsule VS4.1.1.1胶囊价值流新项目Capsule VS New projects项目Validation Projects计划开始与完成日期 Scheduled Date项目进程Schedule 按计划进行Progress as per schedule完成Completed推迟Postponed依据&备注 Justifications & Comments开始日期 Starting完成日期 Ending20072008678910111212345Glatt流化床更换PLC(系统参考编号203111)Glatt fuild bed change PLC(System Reference NO.203111)2006.112007.10XXA重订时间;大修时间变化Reschedule: Shutdown time change芬必得闭口锅验证(系统参考编号203106)Fenbid close pan Validation(System Reference NO.203106) 2007.220072008.12X自动上料机-芬必得装囊自动上料验证(系统参考编号203037)Automatic loading machine used for Fenbid capsule filling Validation(System Reference NO.203037) 2007.42007.12XXB重订时间;2007年目前尚未启动Reschedule; Not started in 2007August芬必得装囊机提速性能确认(系统参考编号203024-203027)Fenbid filling machine speedup performance qualification(System Reference NO.203024-203027)2007.42007.12XXC重订时间;2007年未启动Reschedule; Not started in 2007MG2装囊机VR系统验证(系统参考编号203123/203124)VR system validation for MG2 capsule filling(System Reference NO. 203123/203124)Delete2007.92007.12XX重订时间;优先级改变Reschedule: priority change.新项目New project苏丽丝含量由12% 调整至11.5% (New contac)验证(系统参考编号203003)The content of Surlease adjusts from 12% to 11.5% for New Contac validation. (System Reference NO.203003)2005.72007.810X重订时间;优先级改变Reschedule: priority change.更换成闭口过筛机(系统参考编号203108)Change to closed sieving machine(System Reference NO.203108)2006.112007.6X胶囊清洁验证(系统参考编号206010)Capsule line cleaning validation(System Reference NO.206010)206010 Contac or Fenbid, Contac cleaning validation need to be done for Contac ND project 2007.5-102006.42007.12XContac ND 清洁验证(系统参考编号 206033)Contac ND Cleaning validation(System Reference NO. 206033)206010 Contac or Fenbid, Contac cleaning validation need to be done for Contac ND project 2007.5-102007.52008.6X芬必得制造备料工序何过粉工序的合并(系统参考编号: 203135)Combine dispensing and sieving of Fenbid(System Reference NO.: 203135)206010 Contac or Fenbid, Contac cleaning validation need to be done for Contac ND project 2007.5-102007.62007.8X新项目New project根据Fenbid PUCC,对芬必得制丸档案进行进一步标准化(系统参考编号:204113项目号有问题203114)Standardization to current BR according to Fenbid PUCC(System Reference NO.: 204113203114)206010 Contac or Fenbid, Contac cleaning validation need to be done for Contac ND project 2007.5-102007.62007.12X新项目New project康泰克出口项目验证(系统参考编号203117)Contac ND export project validation (System Reference NO.203117)2007.22007.10X新项目New project4.1.1.2胶囊价值流回顾验证Capsule VS Re-validation projects 项目Validation Projects计划开始与完成日期 Scheduled Date项目进程Schedule 按计划进行Progress as per schedule完成Completed推迟Postponed依据&备注 Justifications & Comments开始日期 Starting完成日期 Ending20072008678910111212345MG37装囊机回顾验证(系统参考编号:203024204027)MG37 filling machine re-validation (System Reference NO. :203024-203027)2008.12008.36X新项目New projectMG2 5313装转囊机回顾验证(系统参考编号:203016203011)MG2 5313 capsule filling machine re-validation (System Reference NO. :203016203011)2008.322008.646X新项目New projectContac NT工艺回顾性验证(系统参考编号:203003)Contac NT process re-validation(System Reference NO. :203003)2008.42008.56X新项目New project芬必得ET booth回顾验证(系统参考编号:204006203136-204007203137)Fenbid ET booth re-validation (System Reference NO. : 203136-203137204006-204007)2008.112008.33X新项目New project4.1.2 片剂和软膏价值流Tablet & cream VS4.1.2.1 片剂和软膏价值流新项目Tablet & cream VS New projects项目Validation Projects计划开始与完成日期 Scheduled Date项目进程Schedule 按计划进行Progress as per schedule完成Completed推迟Postponed依据&备注 Justifications & Comments开始日期 Starting完成日期 Ending20072008678910111212345片剂价值流气动搅拌桨(系统参考编号201040)Gas-motored stirring device of tablet Solution preparation(System Reference NO.201040)2006.102007.12Rescheduled for project delayXX项目延期,重新订完成时间Rescheduled for project delay片剂软膏价值流备料间1072、1073室加装Booth (系统参考编号201098)Install Booth in VS-T Install Booth in VS-T dispensing room 1072&1073(System Reference NO.201098)2007.42008.8X新项目。New Project. Glatt提升机验证(系统参考编号201023) Glatt upgrading and crushing machine Validation(System Reference No. 201023)2005.12007.12X必理通加强片产品转移验证(系统参考编号205005)Panadol extra Product Transfer validation (System Reference NO.205005)2006.22007.12X瑞力芬包衣参数确认(系统参考编号201007)Relafen coating parameters confirm(System Reference NO.201007) 2007.32007.12X片剂新装素片转移系统(立式筛片机+金属检测仪)(系统参考编号201069)New de-duster and metal detector (System Reference NO.201069)2006.92007.11X软膏生产线从GSKT转移至TSKF(系统参考编号202015)Cream linetransfer Cream line transfer from GSKT to TSKF(System Reference NO.202015)2006.102008.3No any changes8XX转移计划改变Transfer plan change.片剂清洁验证(系统参考编号206011)Tablet line cleaning validation (System Reference NO.206011)2006.420072008.12XX验证方法改变Validation strategy change软膏清洁验证(系统参考编号206012)Cream line cleaning validation(System Reference NO.206012)2006.42007.12X溶液保留时间-片剂(系统参考编号206017(B)206024(B)Hold time validation for solutionTablet(System Reference NO. 206017(B)206024(B)2006.42009.12X半成品保留时间-片剂(系统参考编号206017(A)206024(A)Hold time validation for bulkTablet(System Reference NO. 206017(A)206024(A)2006.420092008.123X质量警报-压片机验证压片机 (系统参考编号: 201110,201111,201112) Quality Alert -FETTE validation (System Reference NO.: 201110,201111,201112)2007.52007.810X新项目。New Project. Glatt除湿系统验证(系统参考编号: 201131)Glatt de-humidity system validation (System Reference NO.: 201131) 2008.032008.06X新项目。New Project. 新Fette压片机验证(系统参考编号: 201132)New Fette compressing machine validation (System Reference NO.: 201132) 2008.032008.06X新项目。New Project. RN3017,RN3019 Diosna真空上料系统验证(系统参考编号: 201088,201133)RN3017,RN3019 Diosna vacuum loading system validation (System Reference NO.: 201088,201133)2007.122008.06X新项目。New Project. 50kgV型混合机由胶囊转移至片剂价值流(系统参考编号: 201134)50kg V blender be transferred from capsule VS to tablet VS (System Reference NO.: 201134)2007.122008.06X新项目。New Project. 4.1.2.2某车间片剂和软膏价值流回顾验证 回顾验证Tablet & cream VS the Re-validation projects for the A workshop项目Validation Projects计划开始与完成日期 Scheduled Date项目进程Schedule 按计划进行Progress as per schedule完成Completed推迟Postponed依据&备注 Justifications & Comments开始日期 Starting完成日期 Ending20072008678910111212345必理通其它片剂生产设备验证(系统参考编号201097)PanadolTablet manufacturing equipments validation (System Reference NO.201097)2007.92007.12X新项目New project必理通回顾性验证项目(系统参考编号201001)Panadol revalidation project(System Reference NO.201001)2007.92007.12X新项目New project赛乐特回顾性验证项目(系统参考编号201008)Seraxot revalidation project(System Reference NO.201008)2008.12008.3X新项目New project瑞力芬回顾性验证项目(系统参考编号201007)Relafen revalidation project(System Reference NO.201007)2008.42008.6X新项目New project4.1.3 胶囊、片剂和软膏的包装线Packaging Line of Capsule VS and Tablet & Cream VS4.1.3.1 胶囊、片剂和软膏的包装线新项目Packaging Line of Capsule VS and Tablet & Cream VS New projects项目Validation Projects计划开始与完成日期 Scheduled Date项目进程Schedule 按计划进行Progress as per schedule完成Completed推迟Postponed依据&备注 Justifications & Comments开始日期 Starting完成日期 EndingFinishing200720086789101112123451#UHL视觉检测系统验证(系统参考编号203057)1#UHL visual inspection system Validation (System Reference No. 203057)2005.82007.6X重订时间: 供应商未能按计划到厂安装Reschedule:because Supplier can not install equipment as plan.2#UHL视觉检测系统验证(系统参考编号203058)2#UHL visual inspection system Validation (System Reference NO.203058)2005.82007.6X重订时间: 供应商未能按计划到厂安装Reschedule:because Supplier can not install equipment as plan. UHL2#密封机验证(系统参考编号203053)ULM2# Sealing machine validatio
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 老年人保护性约束课件
- 老年人保健知识培训总结课件
- 山东省日照市东港区某中学2024-2025学年九年级下学期三模考试数学试卷(附答案)
- 人教版八年级英语下册专练:阅读理解20篇(含答案)
- 老年专科护士课件
- CN120199976A 阻燃抗收缩涂层自交联锂电池隔膜及其成型工艺
- CN120197083A 一种面向数据空间信息演化过程的数据分级方法
- 热点09 海-气相互作用与全球气候变化-2024年高考地理专练(新高考专用)
- 2020年7月国开电大法学本科《国际法》期末纸质考试试题及答案
- 老师上课课件改成AV
- 泵与风机课堂版
- GB/T 8572-2010复混肥料中总氮含量的测定蒸馏后滴定法
- GB/T 26121-2010可曲挠橡胶接头
- 校本课程讲座课件
- 人教版(2019)必修三 Unit 3 Diverse Cultures Listening and Talking课件
- 四川省眉山市各县区乡镇行政村村庄村名居民村民委员会明细
- 幼小可爱卡通家长会通用
- 中西医治疗高血压课件
- TOP100经典绘本课件-《大卫上学去》
- 部编人教版七年级语文上册《朝花夕拾》
- 菌种购入、使用、销毁记录表单
评论
0/150
提交评论