XX项目专项工程合同-英文版.doc_第1页
XX项目专项工程合同-英文版.doc_第2页
XX项目专项工程合同-英文版.doc_第3页
XX项目专项工程合同-英文版.doc_第4页
XX项目专项工程合同-英文版.doc_第5页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

Special engineering design, supply and installation contract Contract No:201604Buyer( Party A): Best way Gulf Steel Structure LLC Supplier(Second Party): HongKong Fertile Trading (Branch). PartyAcommissionedPartyBtoundertakePartyAsdesignated60bedsHospitalprojectspecialengineeringdesign,supply,installation,bymutualagreement,thesigningofthiscontract,jointimplementation. 1.The scope of work :both parties confirm the intelligent systems within the scope of construction drawing processing production, including drawing deepening design, processing production , per assembling, packing, loading, technical support and services, Party B should provide the export required documents of relevant information, documents and assistance which the Party A need.2. Design basis2.1 The contract or the power of attorney which party A provide.2.2 Submission basic data of party A2.3 The design USES the main technical standards: Design should comply with UAE municipality and related departments approved by the planning and design drawings, and meet the relevant international BS standards,and to meet the requirements of Party A assigned supervisor, project related department.3. Design content3.1 The list of design workNO.Special project nameThe design requirementsRemark1laundry roomConform to the requirements of the UAE municipality and relevant departments, in line with international standards BS.2Kitchen roomConform to the requirements of the UAE municipality and relevant departments, in line with international standards BS.3Fire engineeringConform to the requirements of the UAE municipality and relevant departments, in line with international standards BS.4Clean engineeringConform to the requirements of the UAE municipality and relevant departments, in line with international standards BS.3.2 Quota designa. Party B design according to the basic drawing which is the Party A to provide. Party B according to the specifications and technical requirements for reasonable deployment configuration.b. In line with the design requirements on the basis of party A, by party b in the supply of equipment and material list limit cost is as followsNO.Special project The cost of limitList of the materialRemark1laundry room88,000See attachment 12Kitchen room208,900See attachment 23Fire engineering380,000See attachment 34Medical equipment2,250,000See attachment 4Total2,926,900 USDIn word:two million nine hundred and twenty-six thousand and nine hundred only.4, Contract amount:Both parties agreed the contract amount of $ 2,926,900 , for the completion of the term of the contract for the design, supply and installation work of all costs, profits, taxes, and so on.5,payment condition:5.1 Pay 15% of the contract amount after get the approval from the owners and supervision for the completed design drawings.5.2 Pay 45% of the contract amount upon goods ordering process and list approved by Party A5.3 Pay 30% of the contract amount upon goods ordered ready to board.5.4 pay 5 % of the contract amount upon arrival on site completion of installation.5.5 Pay 5% of the contract amount as retention, to be paid after one year warranty period has come to an end.5.6 Payment by bank transfer.5.7 Party B shall provide the original Commercial invoice to party A.6 Both parties to submit relevant information, documents and time.6.1 Project the existing building and structural drawings can be provided within one week after signing the contract .6.2 Submitted design drawings and BOQ (Note configuration parameters detailed technical standards) for the party A confirm within 60 calendar days after signing the contract,the submitted document should be Chinese and English electronic version of each copy .6.3 Supply and installation: Party A should deliver the material to site within the 180 days after receiving instruction from Party B, and send 4 full-time technical personnel to the scene to guide the installation work. 7 Privacy Policy:Both parties should protect each others intellectual property, without the consent of the other, Neither party to the other without modification of information and documents, copied or transferred to a third party or used for any projects outside the Contract. In the event of the above, the disclosure shall bear all the consequences and liability.8 Quality standards:Party B supply the materials to meet the requirements of UAE municipality and relevant departments, while Party B should cooperation with party A for the drawings and material approval.9 Resolve contract disputes:9.1 The implementation of this contract dispute, resolved through consultation by both parties, negotiation fails, Both sides agreed to appeal to the UAE Judicial Court 9.2 This contract two copies, each party holds one into force after signature by the legal representative, each having the same legal effect, Party A requires Party B to stop supply of materials, this contract terminate after two side clear payment and goods. It can be provide supplemental agreement, as the contract attachment.Party A Party BCompany name: Best way Gulf Steel Structure LLC. Company name: HongKong Fertile Trading (Branch) Add: Best Way Factory,Mussafa M9,Abu DhabiAdd:WA55 Dubai Word c

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论