




已阅读5页,还剩6页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
浙江省舟山市建设工程竣工规划验收测量报告书舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m3幢地下室1.0113.7426.7439.56412.38515.18617.97720.78823.57926.371029.161131.971234.791337.591440.381543.201646.01计算者:陈荣华 日1 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m3幢1748.811851.635幢地下室1.1613.7226.8239.62412.42515.24618.04720.85823.65926.451029.261132.066幢地下室1.1513.7326.78计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m6幢39.59412.40515.21618.02720.82823.64926.441029.261132.087幢地下室1.1713.9826.8139.61412.42515.22618.02720.81计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m7幢823.61926.411029.221132.028幢地下室1.1813.9826.7739.56412.36515.17617.97720.77823.57926.371029.181131.979幢地下室1.10计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m9幢13.8826.6839.47412.27515.07617.89720.69823.51926.311029.111131.9110幢地下室1.0413.8426.6539.45412.25515.06计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m10幢617.85720.67823.47926.271029.061131.8611幢地下室1.0113.8126.6139.40412.22515.01617.81720.60823.41926.231029.04计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m11幢1131.8612幢地下室0.9013.7226.5439.34412.15514.96617.75720.56823.36926.151028.961131.7621幢地下室0.8013.8126.8339.82计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m21幢412.82515.8424幢地下室0.8513.8027.10310.09413.10516.1127幢地下室0.8213.7926.8139.81412.83515.8331幢地下室1.10车库层(3.50)15.72计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m31幢28.73311.7232幢地下室1.15车库层(3.54)15.7328.74311.7433幢地下室1.16车库层(3.54)15.7528.75311.7537幢地下室1.05车库层(3.41)15.6228.63311.64计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m38幢地下室1.01车库层(3.41)15.6228.643116439幢地下室1.02车库层(3.42)15.6328.62311.6243幢地下室1.05车库层(3.42)15.6328.64311.6544幢地下室1.03车库层(3.42)计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30舟山市普陀区鲁家峙景瑞豪布斯卡竣工规划验收测量成果表项目名称:舟山市普陀区鲁家峙景瑞豪布斯卡竣工测量建筑名称层 次层面标高m44幢15.6328.65311.6545幢地下室1.03车库层(3.44)15.6328.64311.66计算者:陈荣华 日 期:2009.3.30 检查者:胡磊 日 期:2009.3.30复查者:李永根 日 期:2009.3.30should be tightened, no loose, Terminal Board wiring should be one on each side, no more than two. J, shielded wire, spare wire binding order, reliable grounding. 7.7 quality standard 7.7.l cables through the cable embedded tube making use of galvanized steel pipe, tube ends without burrs, smooth. 7.7.2 pipe does not allow bending, bending the bend radius should be 4 times times the outer diameter of the tube in. 7.7.3 ellipticity of a bent tube, pipe diameter 60mm, not 8%, diameter 760mm, not 6%. 7.7.4 making cables buried piping application root production, growing where interface is required, only straight pipe, only the wire port connections, welded connections are not allowed. 7.7.5 service sleeve should have a good grounding. 7.7.6 cable trays installation, burrs and dirt and corrosion treatment should be carried out, install the bridge . 7.8.1.7 piping and piping, equipment and equipment or piping and other equipment shall have sufficient expansion gap in hot situations. 7.8.1.8 metal temperature of the insulating layer (hot) = shell-wall temperature of environment temperature 40 c. 7.8.2 paint 7.8.2.l paint of equipment and pipelines should have at least a primer (red paint) and finish. 7.8.2.2 paint appearance color uniform, without paint, rust, flaking, wrinkles, flow marks, scum, paint particles and visible brush marks. 7.8.2.3 interlayer should be tight and without stratification. 7.8.2.4 pipelines asphalt, fiber glass fabric corrosion, external appearance should never show surrounded by glass fiber cloth uniform, dense, painted pitch inspection should be no delamination, cavitation, homogeneity of asphalt coating, brushing each layer thickness in accordance with design requirements. Standard 7.9 7.9 structure placement process. 1 fair-faced concrete is a concrete surface without any decoration, structure appearance quality of concrete struc
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 离婚诉讼中夫妻共同债务承担及财产分割起诉协议
- 码头场地租赁合同附带集装箱装卸作业及仓储服务
- 线上线下教育合作合同补充协议及教学资源共享协议
- 码头经营场地租赁与船舶租赁及管理合同
- 离婚协议解除与财产分割法律咨询合同
- 房地产开发项目销售合同签订流程及购房者权益保障
- 园林现场施工课件
- 保密新标准培训
- 第05章 生物化学诊断试剂的研制
- 2025年中医外科拔罐和针灸操作技能考核卷答案及解析
- 中小学校长考试试题及答案
- 德州市禹城市事业单位引进青年人才笔试真题2024
- 生物医药产业介绍
- 纪委委员培训课课件
- 2024教科版一年级科学上册全册教案
- 2025年船员服务行业规模分析及投资前景研究报告
- 解读《医务人员职业道德准则(2025年版)》(含准则全文)
- 23G409先张法预应力混凝土管桩
- 人教PEP版(一起)(2024)一年级上册英语全册教案(单元整体教学设计)
- 河南省地图含市县地图矢量分层地图行政区划市县概况ppt模板
- 绩效管理全套ppt课件(完整版)
评论
0/150
提交评论